PROPOSED LEVEE AND FLOODGATE CONSTRUCTION IN TERREBONNE PARISH
NAME OF APPLICANT: Terrebonne Levee and Conservation District. DESCRIPTION: Proposed construction of a 12' (NAVD) levee and a 180' floodgate in Falgout Canal. The levee will connect the existing levee systems on the westbank of Bayou Dularge. Approximately 1,128,596 cubic yards dirt fill and 22,340 cubic yards of rock will be required. Additionally, 54,050 linear feet of terraces will be constructed. Approximately 233 acres of nonvegetated waterbottoms, 32 acres of wetland and 10 acres of upland habitat may be impacted as a result of this proposed project. This project was posted on Public Notice previously on July 31, 2013. TLCD has since modified the proposal and added a mitigation plan to mitigate for the impacted wetlands. LOCATION: Approximately 12.4 miles south-southwest of Houma, Louisiana. Sections 13 and 24, T19S, R16E, P.O.B. of north section at Latitude 29º 25' 13"N / Longitude -90º 46' 55"W, flood gate at Latitude 29º 24' 56"N / Longitude -90º47' 20"W, and P.O.E. at Latitude 29º 24' 27"N / Longitude -90º 47'20"W, in Terrebonne Parish. The Project is located within the West Central Louisiana Watershed, USGS Catalog Unit 08090302.
JOINT PUBLIC NOTICE
January 11, 2015
DEPARTMENT OF THE ARMY
CORPS OF ENGINEERS
NEW ORLEANS DISTRICT
REGULATORY FUNCTIONS
BRANCH
P.O. BOX 60267
NEW ORLEANS, LA 70160
Phone (504) 862-2548
Fax
(504) 862-2574
STATE OF LOUISIANA
DEPARTMENT OF ENVIRONMENTAL
QUALITY
OFFICE OF ENVIRONMENTAL
SERVICES
P.O. BOX 4313
BATON ROUGE, LA 70821-4313
Phone
Fax
STATE OF LOUISIANA
DEPARTMENT OF NATURAL
RESOURCES
OFFICE OF COASTAL
MANAGEMENT
P.O. BOX 44487
BATON ROUGE, LA 70804-4487
(225) 325-8125
(225) 325-8250
Phone
Fax
(225)-342-1076
(225) 342-9439
CORPS REVIEWER:
Johnny Duplantis
DEQ REVIEWER:
Elizabeth Hill
OCM REVIEWER:
Nicole Dandurand
COE NUMBER:
MVN-1999-03719-WPP
WQC NUMBER:
990804-04
CUP NUMBER:
P20130446
PROPOSED LEVEE AND FLOODGATE CONSTRUCTION IN TERREBONNE PARISH
NAME OF APPLICANT: Terrebonne Levee and Conservation District.
DESCRIPTION: Proposed construction of a 12' (NAVD) levee and a 180' floodgate in Falgout
Canal. The levee will connect the existing levee systems on the westbank of Bayou Dularge.
Approximately 1,128,596 cubic yards dirt fill and 22,340 cubic yards of rock will be required.
Additionally, 54,050 linear feet of terraces will be constructed. Approximately 233 acres of
nonvegetated waterbottoms, 32 acres of wetland and 10 acres of upland habitat may be
impacted as a result of this proposed project.
This project was posted on Public Notice previously on July 31, 2013. TLCD has since modified
the proposal and added a mitigation plan to mitigate for the impacted wetlands.
LOCATION: Approximately 12.4 miles south-southwest of Houma, Louisiana. Sections 13 and
24, T19S, R16E, P.O.B. of north section at Latitude 29º 25' 13"N / Longitude -90º 46' 55"W,
flood gate at Latitude 29º 24' 56"N / Longitude -90º47' 20"W, and P.O.E. at Latitude 29º 24' 27"N
/ Longitude -90º 47'20"W, in Terrebonne Parish. The Project is located within the West Central
Louisiana Watershed, USGS Catalog Unit 08090302.
Louisiana Department of Environmental Quality (LDEQ) water quality certification is
required. Concurrent with processing of this application, the LDEQ is reviewing this application
under Section 401 of the Clean Water Act and in accordance with Louisiana Revised Statutes of
1950, Title 30, Chapter 11, Part IV, Section 2074 A (3) to determine if the work would comply
with State water quality standards and other applicable provisions of the CWA. By virtue of an
agreement between the USACE and the LDEQ, this public notice is also issued for the purpose
of advising all known interested persons that there is pending before the LDEQ a decision on
-2water quality certification under such act. Comments concerning this application for water
quality certification in Louisiana must be submitted, using the applicant's name, to: State of
Louisiana, Department of Environmental Quality, Attn: Jamie Phillippe, P.O. Box 4313,
Baton Rouge, LA 70821-4313. The public comment period extends 30 days from the publication
date of this notice. A copy of the public notice with a description of the work is available for
review between 8:00 a.m. and 4:30 p.m. weekdays at the LDEQ office at 602 North 5th Street,
Baton Rouge, Louisiana 70802. Copies may be obtained upon payment of the cost of
printing. The LDEQ may conduct a public hearing to consider all comments concerning water
quality if requested in writing. A request for a public hearing must contain the following
information: the name, mailing address, application number, or other recognizable reference to
the application; a brief description of the interest of the requester, or of persons represented by
the requester; and a brief description of how the application, if granted, would adversely affect
such interest.
The comment period for the Department of the Army Permit and the Louisiana Department of
Environmental Quality WQC will close 20 days from the date of this joint public notice. Written
comments, including suggestions for modifications or objections to the proposed work, stating
reasons thereof, are being solicited from anyone having interest in this permit and/or this WQC
request and must be mailed so as to be received before or by the last day of the comment
period. Letters concerning the Corps of Engineers permit application must reference the
applicant's name and the Permit Application Number, and be mailed to the Corps of Engineers
at the address above, ATTENTION: REGULATORY BRANCH. Similar letters concerning the
Water Quality Certification must reference the applicant's name and the WQC Application
number and be mailed to the Louisiana Department of Environmental Quality at the address
above.
The application for this proposed project is on file with the Louisiana Department of
Environmental Quality and may be examined during weekdays between 8:00 a.m. and 5:00 p.m.
Copies may be obtained upon payment of costs of reproduction.
Corps of Engineers Permit Criteria
The decision whether to issue a permit will be based on an evaluation of the probable
impacts, including cumulative impacts of the proposed activity on the public interest. That
decision will reflect the national concern for both protection and utilization of important
resources. The benefit which reasonably may be expected to accrue from the proposal must be
balanced against its reasonably foreseeable detriments. All factors which may be relevant to the
proposal will be considered including the cumulative effects thereof; among those are
conservation, economics, aesthetics, general environmental concerns, wetlands, historic
properties, fish and wildlife values, flood hazards, floodplain values, land use, navigation,
shoreline erosion and accretion, recreation, water supply and conservation, water quality,
energy needs, safety, food and fiber production, mineral needs, considerations of property
ownership and, in general, the needs and welfare of the people.
The U.S. Army Corps of Engineers is soliciting comments from the public, federal, state, and
local agencies and officials, Indian Tribes, and other interested parties in order to consider and
-3evaluate the impacts of this proposed activity. Any comments received will be considered by the
U.S. Army Corps of Engineers to determine whether to make, modify, condition, or deny a
permit for this proposal. To make this decision, comments are used to assess impacts on
endangered species, historic properties, water quality, general environmental effects, and other
public interest factors listed above. Comments are used in the preparation of an Environmental
Assessment and/or an Environmental Impact Statement pursuant to the National Environmental
Policy Act. Comments are also used to determine the need for a public hearing and to
determine the overall public interest of the proposed activity.
No properties listed on the National Register of Historic Places are near the proposed work.
The possibility exists that the proposed work may damage or destroy presently unknown
archeological, scientific, prehistorical, historical sites, or data. Copies of this notice are being
sent to the State Archeologist and the State Historic Preservation Officer.
Our initial finding is that the proposed work would neither affect any species listed as
endangered by the U.S. Departments of Interior or Commerce, nor affect any habitat designated
as critical to the survival and recovery of any endangered species. Utilizing Standard Local
Operating Procedure for Endangered Species in Louisiana (SLOPES), dated October 22, 2014,
between the U.S. Army Corps of Engineers, New Orleans and U.S. Fish and Wildlife Service,
Ecological Services Office, the Corps has determined that the proposed activity would have no
effect on any listed species.
This notice initiates the Essential Fish Habitat (EFH) consultation requirements of the
Magnuson-Stevens Fishery Conservation and Management Act. The applicant's proposal would
result in the destruction or alteration of 32 acre(s) of EFH utilized by various life stages of red
drum and penaeid shrimp. Our initial determination is that the proposed action would not have a
substantial adverse impact on EFH or federally managed fisheries in the Gulf of Mexico. Our
final determination relative to project impacts and the need for mitigation measures is subject to
review by and coordination with the National Marine Fisheries Service.
If the proposed work involves deposits of dredged or fill material into navigable waters, the
evaluation of the probable impacts will include the application of guidelines established by the
Administrator of the Environmental Protection Agency. Also, a certification that the proposed
activity will not violate applicable water quality standards will be required from the Department of
Environmental Quality, Office of Water Resources before a permit is issued.
Any person may request, in writing, within the comment period specified in this notice, that a
public hearing be held to consider this application. Requests for public hearings shall state, with
particularity, the reasons for holding a public hearing.
You are requested to communicate the information contained in this notice to any other
parties whom you deem likely to have interest in the matter.
Darrell S. Barbara
Chief, Western Evaluation Section
Regulatory Branch
Attachments
App
ro
xim
a
te y
1 2 .4
mile
s
sou
th
-sou
th w
est
of H
oum
a, L
ouis
ia n a
F
PROJECT LOCATION
Access from Houma
Navigation Canal
Copyright:© 2013 National Geographic Society, i-cubed
VICINITY MAP
3
Date:
0
Drawn By:
03/20/13
Scale:
1"=3 mi
CDL
Approved By:
LB/OFP
3
Miles
Sheet No.:
1 OF 8
File No.:
147183
TERREBONNE LEVEE AND CONSERVATION DISTRICT
FALGOUT CANAL LEVEE AND STRUCTURE
SECTIONS 13 & 24, T19S-R16E
TERREBONNE PARISH, LOUISIANA
Revisions
Revision No.: Date:
11/12/13
2
3
07/02/14
4
11/03/15
Notes:
Levee Alignment
Levee Alignment/Elev.
Culverts, Boat Shed
Shaw Coastal, Inc.
(A CB&I Company)
197 Elysian Drive
Houma, LA 70363
Point No. 1
Lat. 29° 25' 13"
Long. 90° 46' 55"
Proposed Boat Shed
(See Sheet 7)
-9.8'
North Section
Proposed Trenasse/Cut
(~160' x 25')
Falg
out C
Match Grade &
Centerline With
Existing Levee (see
Sheet 8 for tie-in)
Proposed 48"
Culvert (See
Sheet 7)
-9.6'
Proposed Trenasse/Cut (~120' x 25')
(Typical Section Sheet 8)
-11.2
y
Ba
ou
-14.3
e
rg
la
u
D
Legend
South Section
Point No. 3
Lat. 29° 24' 27"
Long. 90° 47' 20"
Levee Berm
Levee Centerline
Levee Toe
PLAN VIEW
0
Drawn By:
Scale:
1"=800'
ss f
r
om
Ho u
ma
Na v
igat
ion
Match Grade & Centerline
With Existing Levee (see
Sheet 8 for tie-in)
ROW
03/20/13
-22.5
Acc
e
Levee Access Road
Date:
Proposed Bridge
(See Sheet 7)
an al
Point No. 2
Lat 29° 24' 56"
Long. 90° 47' 20"
(See Sheet 6)
900
CDL
Approved By:
LB/OFP
F
900
Feet
Sheet No.:
2 OF 8
File No.:
147183
TERREBONNE LEVEE AND CONSERVATION DISTRICT
FALGOUT CANAL LEVEE AND STRUCTURE
SECTIONS 13 & 24, T19S-R16E
TERREBONNE PARISH, LOUISIANA
Revisions
Revision No.: Date:
11/12/13
2
07/02/14
3
11/03/15
4
Notes:
Levee Alignment/Cuts
Levee Alignment/Elev.
Boat Shed, Bridge, etc
Shaw Coastal, Inc.
(A CB&I Company)
197 Elysian Drive
Houma, LA 70363
C an
al
F
Proposed Rock
Stabilization
PROPOSED 190'
BARGE STRUCTURE
215'
Proposed Trenasse/Cut
610'
Legend
F a lg
out
Can
a
l
Proposed Rock
Stabilization
Proposed Levee Alignment
Structure Dredge & Fill Limits
PLAN VIEW - BARGE STRUCTURE
200
Date:
0
Drawn By:
03/20/13
Scale:
1"=200'
CDL
Approved By:
LB/OFP
200
Feet
Sheet No.:
3 OF 7
File No.:
147183
TERREBONNE LEVEE AND CONSERVATION DISTRICT
FALGOUT CANAL LEVEE AND STRUCTURE
SECTIONS 13 & 24, T19S-R16E
TERREBONNE PARISH, LOUISIANA
Revisions
Revision No.: Date:
11/12/13
2
07/02/14
3
11/03/15
4
Notes:
Levee Alignment
Levee Alignment/Elev.
Boat Shed, Bridge, etc
A CB&I Company
197 Elysian Drive
Houma, LA 70363
F
Proposed Boat Shed
(See Sheet 7)
Proposed Boat Launch
(See Sheet 7)
Proposed Limestone
Access Road
Proposed Limestone
Parking Area
Proposed Bridge
(See Sheet 7)
Proposed 48"
Culvert (See
Sheet 7)
Legend
Levee Access Road
Levee Berm
Levee Centerline
Levee Toe
ROW
PLAN VIEW
200
Date:
0
Drawn By:
03/20/13
Scale:
1"=800'
CDL
Approved By:
LB/OFP
200
Feet
Sheet No.:
4 OF 8
File No.:
147183
TERREBONNE LEVEE AND CONSERVATION DISTRICT
FALGOUT CANAL LEVEE AND STRUCTURE
SECTIONS 13 & 24, T19S-R16E
TERREBONNE PARISH, LOUISIANA
Revisions
Revision No.: Date:
11/12/13
2
07/02/14
3
11/03/15
4
Notes:
Levee Alignment/Cuts
Levee Alignment/Elev.
Boat Shed, Bridge, etc
Shaw Coastal, Inc.
(A CB&I Company)
197 Elysian Drive
Houma, LA 70363
NORTH BANK
SOUTH BANK
C/L STRUCTURE
25.00
20.00
15.00
10.00
5.00
0.00
-5.00
-10.00
-15.00
-20.00
-25.00
-30.00
-35.00
-40.00
-45.00
-50.00
-55.00
-60.00
-95.00
-100.00
-105.00
-550.00
-500.00
-450.00
-400.00
-350.00
-300.00
-250.00
-200.00
-150.00
-100.00
-50.00
TYPICAL STRUCTURE SECTION
Date:
03/06/13
Drawn By:
CDL
Sheet No.:
Scale:
See Sections
Approved By:
LB/OFP
File No.:
147183
0.00
50.00
100.00
150.00
200.00
250.00
300.00
350.00
400.00
450.00
500.00
TERREBONNE LEVEE AND CONSERVATION DISTRICT
FALGOUT CANAL LEVEE AND STRUCTURE
SECTIONS 13 & 24, T19S-R16E
TERREBONNE PARISH, LOUISIANA
6 of 8
No.:
1
2
3
4
Revisions:
Date:
04/24/13
11/12/13
07/02/14
11/03/15
Shaw Coastal, Inc.
(A CB&I Company)
197 Elysian Drive
Houma, LA 70363
550.00
Rock Liner
NOTES:
APPROXIMATELY 900,000 CUBIC YARDS OF MATERIAL WILL BE HAULED IN FROM APPROVED, NON-WET BORROW PITS FOR THE LEVEE
CONSTRUCTION.
APPROXIMATELY 24,500 CUBIC YARDS OF MATERIAL WILL BE DREDGED FROM FALGOUT CANAL TO CONSTRUCT THE STRUCTURE.
APPROXIMATELY 680 CUBIC YARDS OF MATERIAL WILL BE DREDGED FOR THE TRENASSES/CUTS FOR IMPOUNDMENT. APPROXIMATELY 340
CUBIC YARDS OF ROCK WILL BE USED TO LINE THE TRENASSES TO PREVENT EROSION.
APPROXIMATELY 22,000 CUBIC YARDS OF RIP RAP WILL BE USED FOR THE STRUCTURE AND STABILIZATION.
APPROXIMATELY 30.5 ACRES OF WETLANDS AND 31.5 ACRES OF WATERBOTTOMS WILL BE IMPACTED BY THIS ACTIVITY.
NO CONSTRUCTION WORK WILL BE PERFORMED OUTSIDE OF THE LEVEE RIGHT OF WAY.
NOTES
TERREBONNE LEVEE AND CONSERVATION DISTRICT
FALGOUT CANAL LEVEE AND STRUCTURE
SECTIONS 13 & 24, T19S-R16E
TERREBONNE PARISH, LOUISIANA
Date:
03/06/13
Drawn By:
CDL
Sheet No.:
Scale:
Approved By:
LB/OFP
File No.:
147183
8 of 8
No.:
1
2
3
4
Revisions:
Date:
04/24/13
11/12/13
07/02/14
11/03/15
Shaw Coastal, Inc.
(A CB&I Company)
197 Elysian Drive
Houma, LA 70363
102 WILSON AVE. - HOUMA, LA 70364
www.deltacoastllc.com FAX: 985-262-4567
PHONE: 985-655-3100
102 WILSON AVE. - HOUMA, LA 70364
www.deltacoastllc.com FAX: 985-262-4567
PHONE: 985-655-3100
102 WILSON AVE. - HOUMA, LA 70364
www.deltacoastllc.com FAX: 985-262-4567
PHONE: 985-655-3100
102 WILSON AVE. - HOUMA, LA 70364
www.deltacoastllc.com FAX: 985-262-4567
PHONE: 985-655-3100
MITIGATION PLAN
FOR
FALGOUT CANAL FLOOD STRUCTURE AND CONNECTING LEVEES
Prepared for:
Terrebonne Levee and Conservation District
220 Clendenning Rd.
Houma, LA 70363
July 24, 2015
Prepared By:
102 Wilson Ave.
Houma, LA 70364
Introduction
The Terrebonne Levee and Conservation District (TLCD) proposes the following
mitigation plan to offset the unavoidable impacts associated with Falgout Canal
Flood Structure and the connecting levees. This plan has been prepared for the
United States Army Corps of Engineers (USACE) Permit Number MVN 199903719-WPP and Louisiana Department of Natural Resources (LADNR) Permit
P20130446. This plan demonstrates the offset of approximately 35 acres of
impacts associated with the above permits.
Project Description and Methodology
In examining the potential areas for mitigation TLCD has set the area south
Falgout Canal Road as a high priority. The area has been degraded extensively
over last several decades due to elevated salinity in a once stable brackish
environment. To complement its already robust plan of terrace construction in
this area, TLCD has also developed a plan for the introduction of fresh water into
this basin. This basin has been severed through construction of the Falgout Canal
Road and this new introduction will certainly benefit the basin as well as the
newly constructed terraces. For the purposes of this plan, TLCD wishes to add to
the already permitted terraces by construction of 55.8 acres of new terraces
which will serve a dual purpose. First, these terraces will satisfy the mitigation
requirements of this project; and second, serve as a buffer to storm and wave
energy in this basin.
Terraces will be created by using existing bay bottom sediment to form a baffle
system of ridges at marsh elevation after settlement. Terraces will be constructed
in a staggered gap formation to minimize fetch and promote transport of aquatic
organisms. A backhoe shovel mounted on a marsh buggy will dredge a maximum
of 7 feet into the substrate. The dredge material will be placed on top of the
adjacent bottom forming the terrace, the top of which will be at an elevation of
5.0 foot NAVD 88, which will settle to 2.5 foot NAVD 88, level with the marsh
surface after approximately five years of settlement. When possible, terraces will
be dredged on alternating sides in order to avoid creating continuous canals
which could cause increased scouring. Gaps will be placed between terraces at a
2
maximum distance of 750 feet in order to facilitate the settling of suspended soil
particles.
Benefits and Objectives
The combination of vegetative planting and marsh terracing is intended to:
1)
2)
3)
4)
5)
Promote deposition and retention of suspended sediments;
Reduce turbidity;
Reestablish emergent marsh vegetation;
Reduce marsh fringe retreat by reducing fetch;
Increase fisheries production by increasing the length of marsh edge.
Baseline Information
The marsh type in this area would be classified as brackish marsh experiencing
deterioration by open water in majority of the areas. The site is characterized by
shallow open water and remnant areas of degraded marsh. Open water
comprises the majority of the proposed compensatory project with containment
dikes abutting existing emergent wetlands. The area, and has been historically,
water of the U.S. with adjoining jurisdictional wetlands.
Determination of Credits
The project will offset the losses of 35.0± acres of brackish marsh by creating
55.8± acres of terraces. The proposed mitigation plan should be considered as an
acceptable method of applying the "in lieu" mitigation fund for a sustainable
project that allows maximum ratio of dollars to construction marsh creation.
Since this permit has been evaluated under the previous mitigation policies, a
factor of 1.5 times the amount of impacts should satisfy requirements and has
been accepted for other projects within the Morganza to the Gulf alignment.
3
Mitigation Plan
The project develops 55.8± acres of mitigation by constructing 54,050 linear feet
of terraces in varying lengths in Sections 24,25,35, and 36 in T19S-R16E (see
Attachment No. 1 Mitigation Plan Drawings). The terraces will create a marsh
platform and also decrease further loss of wetland acres caused by shoreline
erosion by dampening wind and wave energy. The terraces will be arranged in a
linear formation in an effort to minimize the amount of marsh/open water edge,
and to minimize fetch distances. The orientation of the system will be placed
where possible within existing spoil banks to insure long term survival and to
provide the maximum protection against the predominant southeasterly wave
energy. Terraces will be constructed by depositing borrow material with a 25 ftwide berm and a top width of 9 feet (top terrace elevation of 5.0 foot NAVD 88)
to make a terrace with 3:1 side slopes. Post settlement elevations will be
maintained at a minimum 45 foot wide marsh platform between 0.5 foot and 2.5
foot NAVD 88 (see attached Sheet 4 to 4 of the Mitigation Plan Drawings).
Spartina alterniflora (smooth cordgrass) will be planted on 10 foot centers on the
mean high water and mean water lines on both sides of the terrace, at
approximately 2.0 foot NAVD 88 and 1.25 foot NAVD 88 in elevation. The marsh
grass is expected to cover the terraces fairly quickly, and then spread in to the
shallow areas around the terraces over the course of ten years. The terraces will
stop, or decrease, shoreline erosion and provide platforms for the plant growth as
well as trap sediments. This project will convert areas of open water back to
vegetated marsh, as well as compliment the freshwater introduction provided by
the environmental structures planned in the Reach E project.
Monitoring requirements, Maintenance & Adaptive Management Plan
The performance of the proposed terrace plan will be monitored by conducting
site visits as well as spatial analysis to determine project performance in
accordance with the established success criteria. The monitoring schedule will
consist of post construction surveys and annual evaluation checks at one, two,
and five year intervals. An "As Built" report and an annual monitoring report will
be submitted to the regulatory stakeholders in a format to be determined. In the
event that the proposed mitigation plan does not adequately meet the success
4
criteria that have been established by the natural resource agencies, the sponsor
will take appropriate action to improve the performance of the mitigation project
in order to meet the required success criteria. Furthermore, the sponsor shall
construct these terraces with its own resources. This provides ability to quickly
address any deficiencies. The conceptual mitigation plan lays the foundation for
the adaptive management of the selected mitigation project.
Site Selection and Site Protection Instrument
The mitigation project, selected, offsets unavoidable impacts in the same
watershed proximal to the actual impacts. Shallow water area with proposed
fresh water introduction should couple with the mitigation project to ensure long
term success and viable plant growth. Mitigation servitudes acquired by TLCD in
perpetuity will promote long-term protection of the mitigation project site.
Performance Standards
The goal of the mitigation is to meet the wetland criteria as described in the Corps
1987 Wetlands Delineation Manual as well as applicable criteria that have been
identified through the development of existing mitigation program. These criteria
can be subdivided into initial, 2 year, and 5 year success criteria.
1. Initial Success Criteria
Initial placement of dredged material completed and at least 80% of the
site is within "as-built" or initial construction elevation range. Resource
agencies will review the Sponsor's proposed initial construction elevation,
but it will be the Sponsor's responsibility to select the initial construction
elevation based on the desired post-compaction, "functional terrace"
elevation identified by the natural resource agencies.
2. Year Two Success Criteria
5
a. After at least one full year following construction, no less than 90% of the
terrace creation site is within the "functional terrace" elevation range (e.g.,
+2.5 ft NAVD 88+ 6 inches).
3. Year Five Success Criteria
a. Five years after construction, at least 75% of the marsh creation remains
within the target elevation range as determined by the natural resources
agencies.
These criteria will be used to elevate the performance of the mitigation plan.
Performance against these metrics will be reported in the annual mitigation
reports.
Financial Assurances and Long Term Protection
As with other projects that are a part of Morganza to the Gulf, a state agency will
provide the financial assurances for the project. The value of the financial
assurance will be determined during the development of the site protection
instrument. Land ownership shall be acquired by Terrebonne Levee and
Conservation District through a flood protection and mitigation servitude. The
Sponsor is the party responsible for long term and adaptive management.
Terrebonne Levee and Conservation District has, both, the resources and the
ability to monitor and maintain the project as specified in the success criteria.
Construction Notes and Plan Requirements
1. As-built drawings will be submitted within 30 days of completion of this
project to the Louisiana Department of Natural Resources, Office of
Conservation, Pipeline Division, P. O. Box 94275 Baton Rouge, LA 70804,
and to the Louisiana Department of Natural Resources, Coastal
Management Division, P.O. Box 44487, Baton Rouge, LA 70804-4487.
2. Structures must also be marked/lighted in accordance with U.S. Coast
Guard regulations.
3. In order to ensure the safety of all parties, the permittee shall contact the
Louisiana One Call System (1-800-272-3020) a minimum of 48 hours prior
to the commencement of any excavation (digging, dredging, jetting, etc.) or
demolition activity.
6
4. Create terraces over 55.8 acres which will be planted with plugs, single
springs, and/or trade gallon containers of smooth cordgrass (spartina
alterniflora) or other acceptable vegetation. Planting rows will be located
on the mean high water and mean water lines of terraces.
5. Airboats and marsh buggies will only be used in open water.
6. The USACE permit Number is MVN 1999-03719-WPP and Louisiana
Department of Natural Resources (LADNR) Permit P20130446
7. Proposal to construct 54,050 linear feet of terraces (in varying lengths) in
order to mitigate for the unavoidable impacts to 35± acres consisting of
brackish marsh habitat caused by the construction of the Falgout Canal
Flood structure and levee project. Approximately ± 203,416 cubic yards of
material will be excavated and deposited for the construction of terraces.
7