You can copy from here when filling out the rest of the page.
The U.S. Army Corps of Engineers, Albuquerque District, (Corps) and the New Mexico Environment Department’s Surface Water Quality Bureau (SWQB) are evaluating an application for the New Mexico 434 Roadway Improvement Project (NM 434), located near Guadalupita, Mora County, New Mexico, which would result in both temporary and permanent impacts both wetlands and non-wetland (other) waters of the United States (WoUS) including Coyote Creek, Big Blue Creek and an unnamed tributary to Coyote Creek. This notice is to inform interested parties of the proposed activity and to solicit comments.
JOINT PUBLIC NOTICE
Application Number:SPA-2012-00566-ABQ
Date:January
29, 2016
Comments Due:March
1, 2016
SUBJECT: The
U.S. Army Corps of Engineers, Albuquerque District, (Corps) and the New Mexico
Environment Department’s Surface Water Quality Bureau (SWQB) are evaluating an
application for the New Mexico 434 Roadway Improvement Project (NM 434), located
near Guadalupita, Mora
County, New Mexico, which would result in
both temporary and permanent impacts both wetlands and non-wetland (other)
waters of the United States (WoUS)
including Coyote Creek, Big Blue Creek and an unnamed tributary to
Coyote Creek. This notice is to inform
interested parties of the proposed activity and to solicit comments.
AUTHORITY:
This application is being evaluated under Sections 404 and 401 of the Clean
Water Act (CWA) for the discharge of dredged or fill material in WoUS. State water quality certification is provided
under the authority of 20.6.2 New Mexico Administrative Code.
APPLICANT:
David E. Trujillo, P.E.
District 4 Engineer
New Mexico Department of Transportation (NMDOT)
PO Box 10
Las Vegas, NM 87701
LOCATION: The project site is located on
or near Coyote and Big Blue Creeks, as
described below and on the attached figures, on NM 434 between mileposts 17.24
and 19.66. Beginning coordinates: UTM
479,149 E, 4,004,151 N. End coordinates:
UTM 478, 892E, 4,007,794 N.
PROJECT DESCRIPTION:
The applicant proposes
to widen NM 434 between
mileposts 17.24 and 19.66 to accommodate two 11-foot
wide lanes with 2-foot outside shoulders. The proposed expansion would reside
primarily within the existing roadway and right of way but would include some
shifts in alignment. The proposed project would replace two bridges within the
project area, which would be located slightly to the east of the existing
bridges to allow for traffic during construction. There would also be a temporary crossing on
Big Blue Creek consisting of a 36-inch culvert to allow traffic during the
replacement of the existing Big Blue Creek culvert with a 14-foot bottomless
structure. The applicant has stated
their overall project purpose and need is to widen
NM 434 and replace the bridges and culvert to meet current federal safety
standards. The Corps has not yet made a
determination of basic and overall project purpose. The attached drawings provide additional
project details. The Federal Highways
Administration (FHWA) is providing funding for this project and, as such,is designated lead federal agency for the
project.