This notice establishes updated standards and guidelines for maps and drawings submitted as part of delineations and applications for U.S. Army permits and jurisdictional determinations. The intent of these standards is to improve the quality and consistency of maps and drawings and simplify and improve review and processing by Corps Regulatory project managers. We estimate that at least 70-80% of maps and drawings submitted to the Corps Regulatory Program in South Pacific Division (comprised of Albuquerque, San Francisco, Sacramento, and Los Angeles districts) already meet the majority of these standards. By adhering to a single standard for maps and drawings, applicants and consultants should have a clear and concise product, and project managers should be able to provide permit decisions and jurisdictional determinations in a more consistent and timely manner. In addition, electronic mapping of permit-related maps and drawings will enable data sharing with other resource agencies for coordination of mitigation decision-making.
Updated
Map and Drawing Standards
for
the South Pacific Division Regulatory Program
February
10, 2016
Corps
contacts:
Sacramento
District: Jason Deters (916) 557-7152 (Jason.Deters@usace.army.mil)
San
Francisco District: William Connor (415) 503-6631 (William.M.Connor@usace.army.mil)
Los
Angeles District: Dan Swenson (213) 452-3414 (Daniel.P.Swenson@usace.army.mil)
Albuquerque
District: Deanna Cummings (505) 342-3280 (Deanna.L.Cummings@usace.army.mil)
South
Pacific Division: Thomas Cavanaugh (415) 503-6574 (Thomas.J.Cavanaugh@usace.army.mil)
Introduction:
This notice establishes updated standards and guidelines for maps and drawings submitted
as part of delineations and applications for U.S. Army permits and jurisdictional
determinations. The intent of these standards
is to improve the quality and consistency of maps and drawings and simplify and
improve review and processing by Corps Regulatory project managers. We estimate that at least 70-80% of maps and
drawings submitted to the Corps Regulatory Program in South Pacific Division
(comprised of Albuquerque, San Francisco, Sacramento, and Los Angeles
districts) already meet the majority of these standards. By adhering to a single standard for maps and
drawings, applicants and consultants should have a clear and concise product,
and project managers should be able to provide
permit decisions and jurisdictional determinations in a more consistent and timely
manner. In addition, electronic mapping
of permit-related maps and drawings will enable data
sharing with other resource agencies for coordination of mitigation
decision-making.
Applicability:
These standards apply to all submittals to Regulatory Divisions, within the
Districts of the Corps' South Pacific Division, and supersede all previous SPD
district-specific standards related to map and drawing requirements. At the Corps' discretion, these standards may
be modified or waived on a case by case basis, for example, projects or
activities with small or temporary impacts to waters of the U.S. (for example,
less than a tenth of an acre of permanent impact), projects where the applicant
possesses limited financial resources (for example, private homeowners and
small land owners), emergencies, and restoration projects with limited grant
funding. Additional examples where these
standards may be modified or waived include reauthorization of
previously-authorized work and maintenance, repair, and/or rehabilitation
projects where the original authorization included adequate drawings that are
available. In general, compensatory
mitigation plans must adhere to these standards, regardless of whether the
standards are waived for the overall project.
Standards:
General:
Documents must include at a minimum:
location (vicinity) map(s) and plan view map(s). Mitigation plans and construction drawings
should also include representative cross-sectional views. Delineation maps must be provided for the
project area, staging areas, disposal sites, access routes, and proposed
mitigation sites, etc.
The orientation of the map on the page
(as it is read) must be the same for all maps submitted.
By convention, North will normally be
toward the top of the page.
For plan view maps where specific
elevations are shown, and for all cross sections, the reference elevation datum
(e.g. North American Vertical Datum of 1988, National Geodetic Vertical Datum
of 1929, etc.) must be indicated.
Procedure: the Corps will review
submitted maps and drawings for conformance with these standards. Documents not meeting the standards may be
returned for revision.
Base maps:
If aerial photographs are used, these
must be orthorectified, date-stamped, and with the imagery source identified on
the map.
Date of imagery must be chosen such
that aquatic resources have maximum visibility (e.g., during wet season).
At least one map showing topography must
be included.
Format:
Both paper and electronic versions of documents
are required; however, submittal of electronic documents may be waived on a
project-specific basis for applicants without access to the appropriate
software. For electronic documents,
Adobe PDF format is preferred.
Size: If larger than 11 x 17 inches,
documents must be folded to fit within a 8.5 x 11 inch binder.
GIS: All GIS data and associated
metadata shall be provided on a digital medium (for example, CD or DVD),
preferably using the Environmental Systems Research Institute (ESRI) shapefile
format. Other data types may be accepted
at the Corps project manager’s discretion.
Plan view :
At least two control points on opposite
corners with latitude and longitude clearly annotated.
North arrow.
Bar scale and text scale (e.g., "1
inch = 250 ft") not to exceed 1 inch = 400 feet.
Legend for any relevant items shown
(e.g., wetlands and/or other water types), including the area (acres
or square feet) in parenthesis for all relevant items shown on the map (e.g.
project boundary, project construction footprint, waters of the U.S., impacts
to waters of the U.S., etc.). Such items
must be clearly identified in the legend.
Annotate clearly showing the location of cross-sectional views (e.g.,
"A-A' ")
Date prepared/revised.
Name and organization of map preparer.
Appropriate landmarks (on-site and
nearby roads, prominent structures and/or topographic features, etc.).
Cross-sectional view:
Must include a bar scale and
text scale (e.g., "1 inch = 100 ft") for horizontal and vertical
dimensions.
If there are tidal
areas within the survey area, identify the location and elevation of Mean High
Water and the High Tide Line on all maps and cross-section drawings when
appropriate.
Location
(vicinity) map(s):
One or more vicinity maps must be
submitted, at least one of which must use a USGS 7.5- minute quadrangle sheet
as its basemap (if no USGS quadrangle is available, another accurate local map
may be used as a basemap) with the project study boundary clearly outlined and
the quadrangle name included on the map.
Does not need to be to-scale, but must
include commonly recognizable landmark(s).
Must include north arrow.
Project location must be clearly marked
and annotated.
Must include adjacent local roadways.
Proposed
projects:
Show all proposed fills, structures,
and /or limits of work within and adjacent to potential waters of the U.S.,
including wetlands.
Show the location of delineated waters
of the U.S. within the project area.
All impact areas within waters of the
United States must be labeled with a unique name (For example, RSP1, RSP2,
Cofferdam1, BoxCulvert1, AccessRoad1, etc.).
Clearly annotate all fills, structures,
and /or limits of work as either permanent or temporary.
Pre-construction drawings (grading
plans) and post-construction drawings (as-built plans) must include name,
company/agency, and signature of preparer, date signed, drawing title, and
total number of sheets.
Both plan view and cross-sectional view
maps must be provided.
The proposed project drawing(s) must
also be accompanied by a completed copy of the Impacts sheet in the
Consolidated ORM Upload Workbook
(ORM-Upload_Sheet_Consolidated_Rapanos20151022.xlsm from the attached Zip file).
Post-construction
drawings (as-built plans):
Both plan view and cross-sectional view
maps must be provided.
Must be the same size and alignment
(spatial) as authorized grading plans (i.e., grading plans and as-built plans must
overlay such that structures, boundaries, etc. align).
Show any deviations from the fills
and/or structures authorized as part of an approved pre-construction drawing in
red.
Delineations
of waters of the United States (see attached example map):
Plan view maps must be provided.
Cross-sectional view drawings must be
provided at the Corps project manager’s discretion. Examples of when cross-sectional view
drawings would be appropriate include stream or wetland restorations, stream
crossings, proposed structures, and delineations of tidal areas.
The survey area boundary must be
clearly annotated and/or symbolized. The survey area boundary encloses the spatial
area for which a Corps jurisdictional determination is being requested.
Clearly show location and extent of all
areas within the survey area potentially meeting the criteria for waters of the
U.S., including special aquatic sites (e.g., wetlands, sanctuaries and refuges,
mudflats, vegetated shallows, and riffle and pool complexes), and/or navigable
waters. Each type of boundary (for
example, ordinary high water mark, mean high water, wetlands or other special
aquatic sites, and high tide line) must be clearly annotated and/or symbolized
to ensure they are differentiable on the map.
Show locations of any wetland
delineation or ordinary high water mark data points, labeled according to the number
of the corresponding wetland delineation form or ordinary high water mark data
sheet. Generally, a wetland boundary must
be based on at least one set of paired wetland delineation data points, with one
within the proposed wetland boundary and one immediately outside it.
Include representative ordinary high
water mark (OHWM) widths where measured in the field (averages may be
acceptable for uniform channel reaches).
OHWM widths must be shown with a transect/profile line (e.g., A-A’)
labeled with the corresponding width measurement in feet. In some cases, a corresponding cross section
may be required, in which case the cross section must include the corresponding
OHWM elevations.
Include
information not directly related to a delineation of waters of the U.S. on a
separate map(s).
If there are
tidal areas within the survey area, identify the location and elevation of Mean
High Water and the High Tide Line on all maps and cross-section drawings. Annotate
boundaries with the corresponding elevation (ft) and the tidal (vertical) datum
used (NAVD88, NGVD29, MLLW, etc.).
For non-tidal
zones, identify the Ordinary High Water Mark.
Each line or polygon representing a water
of the U.S. must be labeled with a unique name (For example, WL1, WL2, VP1,
VP2, STR1, STR2, etc.). Multi-geometry
features, such as streams split by a culvert crossing, shall be separated into
individual sections, each with their own unique names (For Example, STR1a,
STR1b, etc.).
The delineation report must be
accompanied by a completed copy of the Aquatic Resources sheet in the
Consolidated ORM Upload Workbook (ORM_Upload_Sheet_Consolidated_Rapanos_20151022.xslm
from the attached Zip file).
If submitted, delineation-related GIS
data must use the same unique names as on the map and the Consolidated ORM
Upload Workbook, and must include a text file of metadata, including datum,
projection, and mapper contact information.
Mitigation
plans and long-term preservation (LTP) maps (see attached example map):
Both plan view and cross-sectional view
maps must be provided.
Mitigation areas must be clearly
differentiable based on both the type of aquatic resource and the type of
mitigation. Aquatic resource types must
be differentiated by color, and mitigation types must be differentiated using
different fill symbols, as described below and shown in the example ArcMap
layer package (Regulatory_mitigation_template_20160115.lpk in the attached Zip file).
Establishment areas must use a line fill symbol with lines at 45°
and 315°
angles. Re-establishment areas must use a
line fill symbol with lines at a 0° angle. Rehabilitation areas must use a line fill
symbol with lines at a 45°
angle. Enhancement areas must use a line
fill symbol with lines at a 90° angle.
Aquatic resources preserved as compensatory mitigation (preservation)
must use a simple fill symbol. For a
definition of mitigation terms, see 2008 Mitigation Rule (33 CFR Part 332).
All mitigation sites and LTP boundaries
must be clearly labeled with a unique name (for example, LTP1, WetEstab1,
WetEstab2, StrmEnhance1, etc.).
Locations of mitigation sites must be
shown relative to other landscape features and habitat types (e.g., riparian corridor,
wetland complex, etc.).
The mitigation plan must be accompanied
by a completed copy of the Permittee Responsible Mitigation sheet of the
Consolidated ORM Upload Workbook
(ORM_Upload_Sheet_Consolidated_Rapanos_20151022.xslm from the attached Zip file).
If submitted, GIS data for mitigation
projects must use the unique names as described above, conform to the data
dictionary below, and must include a text file of metadata, including datum,
projection, and mapper contact information.
Mitigation
monitoring report maps:
Each discrete mitigation site must be
shown on a map as indicated in Section 6 above.
Any sampling presented in the
monitoring report must be shown on a map, including locations and extent of
sampling points, transects, quadrats, etc.
Ground
photograph Maps:
Any ground photographs included with
proposed project, post-construction (as-built), delineation, mitigation plan,
or mitigation monitoring maps or reports must be accompanied by a map of
photo-points.
Each photo-point must be labeled with a
unique name and the compass direction in which the photograph was taken (e.g.,
a dot with an arrow or labels such as P1-NW and P1-315°).
A table must be provided either on the
map or as a separate attachment, which lists each uniquely named photograph, its
geographic coordinates (latitude, longitude), the compass direction in which
the photograph was taken (e.g., N, NW, 45°, 270°,
etc.), and a brief explanation of the photograph’s relevance.
Updates: Thesestandards may be updated periodically. The most current version will be posted on the SPD Regulatory Program website.
Attachments:
Attachment 1. Delineation of Wetlands and Other Waters of the U.S.
Attachment 2. Mitigation Plan and Long-term Preservation Map