SHIP AND BARGE DOCK AND HEAVY HAUL DOCK WITH WATER INTAKE STRUCTURES IN MISSISSIPPI RIVER IN ST. JAMES PARISH
NAME
OF APPLICANT: Yuhuang Chemical Inc, c/o Lanier &
Associates, 4101 Magazine Street, New Orleans, Louisiana 70115.
LOCATION
OF WORK: In the Mississippi River, Right Descending
Bank, River Mile 157.5, at 5327 St. James Co-Op Road, St. James, Louisiana in
St. James Parish within the Mississippi River Basin in hydrologic unit (HUC
08070100), as shown on the attached drawings (Latitude 29.99682 N, Longitude -90.835628
W).
CHARACTER
OF WORK: The applicant has requested Department of the
Army authorization to clear, grade, excavate and deposit fill and/or aggregate
material to construct and maintain a methanol plant facility with a barge and
ship dock and a heavy haul road and barge dock to include two water intake
structures, two levee crossings, a boat ramp, underground pipelines and an
elevated piperack. The maximum extent of
the structures is proposed to be 731 linear feet channelward from the crown of
the levee. Approximately 65,723 cubic
yards will be excavated and backfilled and approximately 160,692 total cubic
yards of fill material including gravel, rock, sand and soil would be hauled in
and deposited to achieve required grade elevation requirements. The proposed project is situated on an approximately
1,000-acre tract of which 14.8 acres have been determined to be forested
wetlands with approximately 49,000 linear feet Waters of the U.S. It is anticipated that the proposed action would
impact traditionally navigable waters and jurisdictional wetlands and Waters of
the U.S. A preliminary analysis has determined that the proposed project would
directly impact 1.79 acres of forested wetlands and 1.15 acres Waters of the U.S.
It is
presumed that the applicant has designed the project to avoid and minimize
direct and secondary adverse impacts to the maximum extent practicable. Any further reduction would limit usage of
the property and function, deeming the project impracticable. As compensation for unavoidable wetland
impacts, the applicant proposes to mitigate in-kind wetland credits from a
Corps approved mitigation bank located in the watershed.
JOINT PUBLIC NOTICE
February 8, 2016
United States Army Corps of Engineers
New Orleans District
Regulatory Branch
Post Office Box 60267
New Orleans, Louisiana 70160-0267
State of Louisiana
Department of Environmental Quality
Office of Environmental Services
Post Office Box 4313
Baton Rouge, Louisiana 70821-4313
(504) 862-1545
Project Manager
S. Gail Gainey
Sandra.G.Gainey@usace.army.mil
MVN 2014-00940-CG
(225) 219-3225
Project Manager
Elizabeth Hill
WQC Application Number
WQC # 160128-03
Interested parties are hereby notified that a permit application has been received by the
New Orleans District of the US Army Corps of Engineers pursuant to: [X] Section 10 of the
Rivers and Harbors Act of March 3, 1899 (30 Stat. 1151; 33 USC 403); and/or [X] Section 404
of the Clean Water Act (86 Stat. 816; 33 USC 1344).
Application has also been made to the Louisiana Department of Environmental Quality,
Office of Environmental Services, for a Water Quality Certification (WQC) in accordance with
statutory authority contained in LRS 30:2074 A(3) and provisions of Section 401 of the Clean
Water Act.
SHIP AND BARGE DOCK AND HEAVY HAUL DOCK WITH WATER INTAKE
STRUCTURES IN MISSISSIPPI RIVER IN ST. JAMES PARISH
NAME OF APPLICANT: Yuhuang Chemical Inc, c/o Lanier & Associates, 4101 Magazine
Street, New Orleans, Louisiana 70115.
LOCATION OF WORK: In the Mississippi River, Right Descending Bank, River Mile 157.5, at
5327 St. James Co-Op Road, St. James, Louisiana in St. James Parish within the Mississippi
River Basin in hydrologic unit (HUC 08070100), as shown on the attached drawings (Latitude
29.99682 N, Longitude -90.835628 W).
CHARACTER OF WORK: The applicant has requested Department of the Army authorization
to clear, grade, excavate and deposit fill and/or aggregate material to construct and maintain a
methanol plant facility with a barge and ship dock and a heavy haul road and barge dock to
include two water intake structures, two levee crossings, a boat ramp, underground pipelines
and an elevated piperack. The maximum extent of the structures is proposed to be 731 linear
feet channelward from the crown of the levee. Approximately 65,723 cubic yards will be
excavated and backfilled and approximately 160,692 total cubic yards of fill material including
gravel, rock, sand and soil would be hauled in and deposited to achieve required grade
elevation requirements. The proposed project is situated on an approximately 1,000-acre tract
of which 14.8 acres have been determined to be forested wetlands with approximately 49,000
linear feet Waters of the U.S. It is anticipated that the proposed action would impact
traditionally navigable waters and jurisdictional wetlands and Waters of the U.S. A preliminary
analysis has determined that the proposed project would directly impact 1.79 acres of
2
forested wetlands and 1.15 acres Waters of the U.S.
It is presumed that the applicant has designed the project to avoid and minimize direct and
secondary adverse impacts to the maximum extent practicable. Any further reduction would
limit usage of the property and function, deeming the project impracticable. As compensation
for unavoidable wetland impacts, the applicant proposes to mitigate in-kind wetland credits
from a Corps approved mitigation bank located in the watershed.
The comment period for the Department of Army will close in 30 days from the date of this
public notice. Written comments, including suggestions for modifications or objections to the
proposed work, stating reasons thereof, are being solicited from anyone having interest in this
permit and must be mailed so as to be received before or by the last day of the comment
period. Letters concerning the Corps of Engineers permit application must reference the
applicant's name and the Permit Application Number, and be mailed to the Corps of Engineers
at the address above, ATTENTION: REGULATORY BRANCH. Similar letters concerning the
Water Quality Certification must reference the applicant's name and the WQC Application
number and be mailed to the Louisiana Department of Environmental Quality at the address
above.
The application for this proposed project is on file with the Louisiana Department of
Environmental Quality and may be examined during weekdays between 8:00 a.m. and 4:30
p.m. Copies may be obtained upon payment of costs of reproduction.
Corps of Engineers Permit Criteria
The decision whether to issue a permit will be based on an evaluation of the probable
impacts, including cumulative impacts of the proposed activity on the public interest. That
decision will reflect the national concern for both protection and utilization of important
resources. The benefit which reasonably may be expected to accrue from the proposal must
be balanced against its reasonably foreseeable detriments. All factors which may be relevant
to the proposal will be considered including the cumulative effects thereof; among those are
conservation, economics, aesthetics, general environmental concerns, wetlands, historic
properties, fish and wildlife values, flood hazards, floodplain values, land use, navigation,
shoreline erosion and accretion, recreation, water supply and conservation, water quality,
energy needs, safety, food and fiber production, mineral needs, considerations of property
ownership and, in general, the needs and welfare of the people.
The US Army Corps of Engineers is soliciting comments from the public, federal, state, and
local agencies and officials, Indian Tribes, and other interested parties in order to consider and
evaluate the impacts of this proposed activity. Any comments received will be considered by
the US Army Corps of Engineers to determine whether to make, modify, condition, or deny a
permit for this proposal. To make this decision, comments are used to assess impacts on
endangered species, historic properties, water quality, general environmental effects, and other
public interest factors listed above. Comments are used in the preparation of an Environmental
Assessment and/or an Environmental Impact Statement pursuant to the National
Environmental Policy Act. Comments are also used to determine the need for a public hearing
and to determine the overall public interest of the proposed activity.
The New Orleans District is unaware of properties listed on the National Register of
Historic Places near the proposed work. The possibility exists that the proposed work may
damage or destroy presently unknown archeological, scientific, prehistorical, historical sites, or
3
data. Copies of this notice are being sent to the State Archeologist and the State Historic
Preservation Officer.
The New Orleans District has determined that the proposed project is located in waters
known to be utilized by the Pallid Sturgeon (Scaphirhynchus albus). Utilizing
Standard Local Operating Procedure for Endangered Species in Louisiana (SLOPES), dated
October 22, 2014, between the U.S. Army Corps of Engineers, New Orleans and U.S. Fish and
Wildlife Service, Ecological Services Office, the Corps has determined that with the inclusion of
the Project Recommendations For Intake Structures, proposed work is not likely to adversely
affect the Pallid Sturgeon.
This notice initiates the Essential Fish Habitat (EFH) consultation requirements of the
Magnuson-Stevens Fishery Conservation and Management Act. The applicant's proposal
would result in the destruction or alteration of up to 0 acres of EFH utilized by various life
stages of red drum and penaeid shrimp. Our initial determination is that the proposed action
would not have a substantial adverse impact on EFH or federally managed fisheries in the Gulf
of Mexico. Our final determination relative to project impacts and the need for mitigation
measures is subject to review by and coordination with the National Marine Fisheries Service.
If the proposed work involves deposits of dredged or fill material into navigable waters, the
evaluation of the probable impacts will include the application of guidelines established by the
Administrator of the Environmental Protection Agency. Also, a certification that the proposed
activity will not violate water quality standards will be required from the Department of
Environmental Quality, Office of Environmental Services before a permit is issued.
Any person may request, in writing, within the comment period specified in this notice, that a
public hearing be held to consider this application. Requests for public hearings shall state,
with particularity, the reasons for holding a public hearing. You are requested to communicate
the information contained in this notice to any other parties whom you deem likely to have
interest in the matter.
The applicant has certified that the proposed activity described in the application complies
with and will be conducted in a manner that is consistent with the Louisiana Coastal Resources
Program (Louisiana Coastal Zone Application P20150795). The Department of the Army
permit will not be issued unless the applicant received approval or a waiver of the Coastal Use
Permit by the Department of Natural Resources.
JOHN M. HERMAN
Chief, Central Evaluation Section
Regulatory Branch
Enclosures