The applicant proposes to discharge fill material during road expansion activities.
Full Public Notice Project Plans
PROJECT DESCRIPTION:
The applicant proposes to discharge fill material during road expansion
activities to reduce congestion, increase safety, and improve operational
efficiency along a congested and developing FM 1093 corridor.
The proposed project is approximately 5.3 miles
in length. The construction limits of
the proposed project are from approximately 0.6-mile west of FM 723/Spring
Green Boulevard to FM 359 in Fulshear, with a transition to the existing
section at James Lane west of FM 359.
The proposed roadway improvement project would extend the existing
Westpark Tollway (four-lane controlled access tollway with continuous non-toll
frontage roads) from 0.6-mile west of FM 723/Spring Green Boulevard to Cross
Creek Ranch Boulevard. The toll lanes
would terminate and tie into a non-toll four-lane divided facility approximately
1,500 feet west of Cross Creek Ranch Boulevard.
The four-lane divided facility would continue west to FM 359 in Fulshear
and transition to the existing roadway section at James Lane. The outside lanes of the non-toll frontage
roads and the four-lane divided roadway are proposed shared-use lanes that
would accommodate cyclists. A five-foot
sidewalk is proposed on the north side of the proposed project. Such activities include impacts to 796 linear
feet of multiple streams, 2.26 acres of forested wetlands, and 0.53 acre to
other waters. A total of 1,300 linear
feet of impacts to unculverted portions of streams is anticipated as a result
of construction.