Harris County proposes to widen and upgrade Cypress Rose Hill Road Segment 10.
Full Public Notice Project Plans
PROJECT DESCRIPTION:
Harris County proposes to widen and upgrade Cypress Rose Hill Road
Segment 10 from 1,700 feet south of Burkhardt Road to 500 feet north of Seidel
Cemetery Road, in Harris County, Texas.
The proposed project is approximately 0.68 mile in length.
Existing Cypress Rose Hill Road is currently a two-lane
undivided roadway. Shoulders are
typically minimal with a width of less than one foot. HCFCD Channel M128-00-00 is adjacent to the
west side of Cypress Rose Hill Road.
On 13 May 2014, USACE determined that M128-00-00 was
jurisdictional due to its nexus with Willow Creek. Portions of M128-00-00 are concrete
lined. A 25-acre pasture is located on
the eastside of Cypress Rose Hill Road between Seidel Cemetery Road and Burkhardt
Road. Harris County is proposing to
widen Cypress Rose Hill Road to a four-lane divided highway. Approximately 2.34 acres of additional
right-of-way (ROW) will be required.
M128-00-00 will be culverted for the entire length of the project. Approximately 0.461 acre of permanent impacts
to waters of the U.S. are anticipated as a result of construction.
The types of materials that would be discharged
would be in compliance with the current Harris County specifications and
standards. Material would be granular
material that is free from vegetation or other objectionable material and meets
Harris County’s requirements. A Storm
Water Pollution Prevention Plan (SW3P) will be prepared in accordance to Harris
County standards. The SW3P will help to control sedimentation transport during
construction. Approximately 436.07 cubic
yards of fill have been calculated for the proposed project.