Home

Los Angeles District

Run scraper

The City of Chino is requesting a new outgrant from the Corps of Engineers for improvements to existing sewer facilities located at Prado Regional Park

Basic information

Fill out these two fields at minimum.

— or —

How Big?

Where?

Links to source documents

Raw text

You can copy from here when filling out the rest of the page.

The City of Chino is requesting a new outgrant from the Corps of Engineers for improvements to existing sewer facilities located at Prado Regional Park, San Bernardino County.

A draft Environmental Assessment (dEA) is made available for the public review, during the period February 22-March 24, 2016. This Notice contains the dEA and Project Figures. Appendices for the document may be found at the City of Chino website location: http://www.cityofchino.org/government-services/community-development/environmental-documents

During this comment period, questions and comments may be forwarded to: Carvel Bass at carvel.h.bass@usace.army.mil and 213-452-3392. Or mail any written comments to: Carvel Bass, Asset Management Division, USACE, 915 Wilshire Blvd., Los Angeles, CA 90017. All comments must be received by March 24, 2016.

The City of Chino is proposing to acquire easements on federal land to accommodate the construction of sewer facilities. These easements are also located within the San Bernardino County leasehold of federal property for the El Prado Regional Park. There are two major components/phases of the project related to the requested easements and associated sewer facilities improvements. The first phase, which is anticipated in the near term, is located in an area that is almost completely paved and is completely disturbed. The second phase, which depending upon market conditions, could be constructed up to 5 years or more from now, would be located in an unpaved and undeveloped area generally located to the east of the developed part of the park, and includes some areas that have jurisdictional waters and sensitive biological resources. A preliminary design has been prepared, but not yet finalized, for the proposed sewer system.

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas