The application is for the placement of fill material for a bank stabilization project and to replace structurally deficient reinforced concrete box (RCB) bridge. The project also involves the replacement of water and sewer relocation as required for the new RCB structure.

The proposed project is located on Main Street over Brookhaven Creek. The proposed project is in Section 27 and 34, Township 9 North, Range 3 West, in Norman, Cleveland County, Oklahoma. The project site can be found on the Boswell, Oklahoma 7.5 Minute USGS Quadrangle map at North Latitude 35.218395 and West Longitude 97.503688.

The basic purpose of this work is to stabilize Brookhaven Creek. The proposed work would eliminate safety issues from vertical banks that are adjacent a residential development, prevent flooding, and would replace the existing RCB on Main Street.

The overall purpose of this work is to provide a safe and efficient transportation facility to accommodate the present and future transportation needs of the area and to widen Brookhaven Creek to alleviate flooding issues.

The applicant proposes channel improvements to approximately 2,766 lf to jurisdictional waters of the United States (WOUS). The excavated channel improvements would expand the jurisdictional stream channel from 1.19 acres to 2.4 acres of WOUS. Fill material would consist of approximately 3,889 cys of 4- to 8-inch stones for bank stabilization using gabion baskets (single-22 cys; double-2,267 cys; triple-1,300 cys; and MSE-300 cys), 672 cys for segmented blocks, 1,749 cys for gravel (SB and MSE), and 2,042 cys of earthen fill material. The applicant also proposed to replace an existing bridge with a 125 lf long triple cell RCB. The work performed in the wetlands and uplands would be completed using conventional earthmoving equipment. The fill material may consist of concrete, gravel, and earthen material.

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas