The application is for the placement of fill material for a bank stabilization project and to replace structurally deficient reinforced concrete box (RCB) bridge. The project also involves the replacement of water and sewer relocation as required for the new RCB structure.
The proposed project is
located on Main Street over Brookhaven Creek.
The proposed project is in Section 27 and 34, Township 9 North, Range 3
West, in Norman, Cleveland County, Oklahoma.
The project site can be found on the Boswell, Oklahoma 7.5 Minute USGS
Quadrangle map at North Latitude 35.218395 and West Longitude 97.503688.
The basic purpose of
this work is to stabilize Brookhaven Creek.
The proposed work would eliminate safety issues from vertical banks that
are adjacent a residential development, prevent flooding, and would replace the
existing RCB on Main Street.
The overall purpose of
this work is to provide a safe and efficient transportation facility to
accommodate the present and future transportation needs of the area and to
widen Brookhaven Creek to alleviate flooding issues.
The applicant proposes
channel improvements to approximately 2,766 lf to jurisdictional waters of the
United States (WOUS). The excavated channel
improvements would expand the jurisdictional stream channel from 1.19 acres to
2.4 acres of WOUS. Fill material would
consist of approximately 3,889 cys of 4- to 8-inch stones for bank
stabilization using gabion baskets (single-22 cys; double-2,267 cys;
triple-1,300 cys; and MSE-300 cys), 672 cys for segmented blocks, 1,749 cys for
gravel (SB and MSE), and 2,042 cys of earthen fill material. The applicant also proposed to replace an
existing bridge with a 125 lf long triple cell RCB. The work performed in the wetlands and
uplands would be completed using conventional earthmoving equipment. The fill material may consist of concrete,
gravel, and earthen material.