Peter Olmstead is the Regulatory point-of-contact for this permit application from the city of Halfway to conduct work impacting wetlands adjacent to Pine Creek and an unnamed tributary; wetlands adjacent to Lee Creek; and wetlands adjacent to an unnamed tributary of Sag Creek, in the city of Halfway, Oregon.
PUBLIC NOTICE for Permit Application
Issue Date: March 4, 2016
Expiration Date: April 4, 2016
US Army Corps of Engineers No: NWP-2015-432
30-Day Notice Oregon Department of State Lands No: 58511
Interested parties are hereby notified the U.S. Army Corps of Engineers, Portland District (Corps) has received an application for a Department of the Army permit for certain work in waters of the United States, as described below and shown on the attached plans. The Corps is soliciting comments on the proposed work.
Applicant: City of Halfway
Attention: Sheila Farwell
155 B East Record Street
Halfway, Oregon 97834
Email: thecitybypage@hotmail.com
Telephone: (541) 742-4741
Applicant’s Agent: Anderson Perry & Associates, Inc
Attention: Laurie Parry
P.O. Box 1107
La Grande, Oregon 97850
Email: lparry@andersonperry.com
Telephone: (541) 963-8309
Location:The proposed project originates at the existing wastewater treatment facility at the corner of Fairgrounds Road and Pine Creek Highway and extends south approximately 2 miles along Gover Lane to Posey Valley (just north of Posey Valley Lane), in the City of Halfway, Baker County, Oregon. The site is in Sections 16, 17, & 20, Township 8 South, Range 46 East. Latitude and Longitude (center): 44.8712° North, -117.1090° West
Waterways: Wetlands adjacent to Pine Creek, unnamed tributary of Pine Creek and adjacent wetlands, wetlands adjacent to Lee Creek, wetlands adjacent to an unnamed tributary of Sag Creek.
Project Purpose: To provide an alternative wastewater discharge system for the City of Halfway to bring them into compliance with the National Pollutant Discharge Elimination System (NPDES).
Project Description:The project would allow wastewater from the City’s existing treatment facility to be pumped offsite to a new storage pond and then utilized for irrigation on the Gover Property in Posy Valley. The overall project includes improvements to the existing wastewater facility, installation of new 7,300-foot long force main pipeline, construction of a new 8.38-acre storage pond, and a new irrigation pivot system. Activities proposed within waters of the U.S would be limited to only those associated with the new pipeline and storage pond, as follows:
A 2-foot wide by 215-foot long by 4-foot deep trench would be excavated in “Wetland 1”, an emergent wetland adjacent to Pine Creek. Up to 100 cubic yards of native soil from the trench excavation would be temporarily sidecast into the wetland and stockpiled for use in restoration after the pipe is installed. In total, 968 square feet of the wetland would be temporarily impacted, but restored to preconstruction contours using the native wetland topsoil.
A 4.5-foot wide by 256-foot long by 4-foot deep trench would be excavated in “Wetland 3”, an emergent wetland adjacent to Lee Creek. Up to 115 cubic yards of native soil from the trench would be temporarily sidecast into the wetland and stockpiled for use in restoration after the pipe is installed. In total, 1,152 square feet of the wetland would be temporarily impacted, but restored to preconstruction contours using the native wetland topsoil.
A 7-foot wide by 34-foot long by 7-foot deep trench would be excavated in “Ditch 1”, an unnamed tributary of Pine Creek. Up to 20 cubic yards of native material will be removed from 240 square feet of the creek and stockpiled in the adjacent uplands for use in restoration after the pipe is installed. Bentonite trench plugs will be installed in the trench on both sides of the waterbody crossing to prevent stream flows from following the pipeline after restoration. Two 3-foot wide by 12.5-foot long temporary sandbag coffer dams would be installed in the creek to divert stream flows through a bypass pipe during construction. The stream crossing would also require the removal of 2 cubic yards of material over 16 square feet of “Wetland 4”, an emergent wetland adjacent to the creek. That material would be temporarily sidecast in the adjacent uplands and stockpiled for use in restoration after the pipe is installed. The wetland and stream would be fully restored to preconstruction contours using the native material removed during trench excavation.
Creation of the new 8.38-acre wastewater storage pond would require the installation of two approximately 20-foot tall dams in Posey Valley. The northernmost dam (Dam A) would be approximately 175-foot wide by 650-foot long and would result in permanent fill into wetlands. The overall construction of the storage pond and its appurtenances would result in the permanent loss of 0.07 acres of “Wetland 6”, 0.05 acres of “Wetland 7”, and 1.78 acres of “Wetland 8”; all wetlands adjacent to an unnamed tributary of Sag Creek. The permanent loss of these wetlands would result from either direct filling or excavation and/or permanent inundation (i.e. conversion from wetland to open water), as depicted on sheets 9A through 9D of the enclosed drawings.
In total, the project would result in temporary impacts to 0.05 acres of wetlands and 240 square feet of stream from the pipeline; and the permanent loss of 1.9 acres of wetlands from the storage pond.
Mitigation:The applicant proposes to avoid and minimize impacts from the project by storing motorized equipment at least 150 feet away from waterbodies during non-work hours, performing all in-stream work during the ODFW-approved work window of July 1 to August 31, installing appropriate erosion controls around waterbodies, treating any sediment-laden water from the work areas before allowing it to return to waterbodies, and minimizing disturbance on soils and vegetation from heavy equipment. The applicant has provided a proposed compensatory wetland mitigation plan to offset losses of waters of the U.S. that may result from the proposed project. They propose the creation of 2.48 acres of new emergent wetlands and the enhancement of 0.57 acres of existing wetlands, adjacent to Pine Creek near the existing wastewater treatment facility. The Corps will determine the type and amount of compensatory mitigation necessary to offset environmental losses from the proposed project.
Drawings:Seventeen (17) drawings are attached and labeled Corps No. NWP-2015-432. Copies of this public notice, which have been mailed or otherwise physically distributed, feature project drawings in black and white. The electronic version features those drawings in color, which we think more accurately illustrates the proposed project. To access the electronic version of this public notice, go to the Portland District website at http://www.nwp.usace.army.mil/ and select Regulatory Branch Permit Information. At the Regulatory page select Regulatory Public Notices.
Authority: The proposed project will be evaluated under the following:
Section 404, Clean Water Act (33 U.S.C. 1344), for discharge of dredged or fill material into waters of the United States.
Clean Water Act Section 404(b)(1) Guidelines:The described discharge will be evaluated for compliance with guidelines promulgated by the U.S. Environmental Protection Agency under authority of Section 404(b)(1) of the Clean Water Act. The 404(b)(1) Guidelines are the substantive criteria used in evaluating discharges of dredged or fill material into waters of the United States. Should a permit be issued, the Corps will evaluate the fill material source (i.e., borrow site) prior to the start of construction.
Water Quality Certification: Section 401 of the Clean Water Act (33 U.S.C. 1341) requires applicants to obtain a water quality certification for proposed discharges into waters of the United States. A permit for the described work will not be issued until certification has been issued or is waived from the certifying state. Attached is the state's notice for a water quality certification.
Endangered Species:Section 7 of the Endangered Species Act (ESA) (16 U.S.C 1536) requires federal agencies to consult with the National Marine Fisheries Service (NMFS) and/or U.S. Fish and Wildlife Service (USFWS) on all actions that may affect a species listed (or proposed for listing) under the ESA as threatened or endangered or that may adversely modify designated critical habitat. The Corps’ preliminary review indicates the described activity will not affect any endangered species or designated critical habitat. For this project, the U.S. Department of Housing and Urban Development, as the lead Federal agency for ESA consultation, will consult with the NMFS and/or the USFWS as needed under Section 7 of the ESA.
Essential Fish Habitat:Section 305(b)(2) of the Magnuson-Stevens Fishery Conservation and Management Act (MSA) as amended (16 U.S.C 1855), requires Federal agencies to consult with the NMFS on all actions, or proposed actions, permitted, funded, or undertaken by the agency, that may adversely affect Essential Fish Habitat (EFH). The Corps’ preliminary review indicates the described activity would not adversely affect EFH at the project location or in its vicinity. For this project, the U.S. Department of Housing and Urban Development, as the lead Federal agency for MSA consultation, will consult with the NMFS as necessary.
Historic Properties/Cultural Resources:Section 106 of the National Historic Preservation Act (NHPA) of 1966, as amended (16 U.S.C. 470), requires Federal agencies to consult with the appropriate State and/or Tribal Historic Preservation Officer to take into account the effects of actions they undertake or permit on historic properties listed in or eligible for listing in the National Register of Historic Places. For this project, the U.S. Department of Housing and Urban Development, as the lead Federal agency for determining compliance with Section 106 of the NHPA, will consult with the appropriate State and/or Tribal Historic Preservation Officer as applicable.
The Corps’ preliminary review indicates a historic properties investigation has been conducted within the permit area. The results of that survey are currently being coordinated with the State Historic Preservation Office (SHPO) and Native American Tribes. If based on the review of that survey it is determined there will be an adverse effect to historic properties, a Memorandum of Agreement to mitigate for adverse effects will be implemented.
This notice has been provided to the SHPO, interested Native American Indian Tribes, and other interested parties. If you have information pertaining to cultural resources within the permit area that may not have been identified during the abovementioned survey, please provide this information to the Corps’ project manager (identified on page 1 of this notice) to assist in a complete evaluation of potential effects.
State and Local Authorizations:The applicant has obtained approval from Baker County and will be applying for the following additional governmental authorizations for the project:
Oregon DEQ 1200-C Permit & 401 WQC
DSL removal/fill permit
Public Hearing:Any person may request in writing within the comment period specified in this notice that a public hearing be held to consider this application. Requests for public hearings shall state with particularity the reasons for holding a public hearing.
Evaluation:The decision whether to issue a permit will be based on an evaluation of the probable impact, including cumulative impacts, of the described activity on the public interest. That decision will reflect the national concern for both protection and utilization of important resources. The benefit, which reasonably may be expected to accrue from the described activity, must be balanced against its reasonably foreseeable detriments. All factors, which may be relevant to the described activity will be considered including the cumulative effects thereof; among those are conservation, economics, aesthetics, general environmental concerns, wetlands, historic properties, fish and wildlife values, flood hazards, floodplain values, land use, navigation, shoreline erosion and accretion, recreation, water supply and conservation, water quality, energy needs, safety, food and fiber production, mineral needs, consideration of property ownership and, in general, the needs and welfare of the people.
The Corps is soliciting comments from the public; Federal, state, and local agencies and officials; Indian Tribes; and other interested parties in order to consider and evaluate the impacts of the proposed project. Any comments received will be considered by the Corps to determine whether to issue, modify, condition or deny a permit for this proposal. To make this decision, comments are used to assess impacts on endangered species, historic properties, water quality, general environmental effects, and the other public interest factors listed above. Comments are used in the preparation of an Environmental Assessment and/or an Environmental Impact Statement pursuant to the National Environmental Policy Act. Comments are also used to determine the need for a public hearing and to determine the overall public interest of the proposed activity.
Submitting Comments: Interested parties are invited to provide comments on the proposed project. Comments may be submitted by conventional mail or email. All comments received will be considered in determining whether authorizing the work would be contrary to the public interest.
Either conventional mail or e-mail comments must include the Corps reference number as shown on page 1 and include the commenter’s name and address. In order to be accepted, e-mail comments must originate from the author’s e-mail account and must include on the subject line of the e-mail message the Corps reference number. All comments received will become part of the administrative record and are subject to public release under the Freedom of Information Act including any personally identifiable information such as names, phone numbers, and addresses.
Additional information about the proposed project may be obtained from the Corps Project Manager listed below. All comments, whether by conventional mail or email, must be received no later than the expiration date of this public notice to ensure consideration. Comments should be submitted to the following mailing address or email address:
U.S. Army Corps of Engineers
Peter Olmstead
La Grande Field Office
3502 Highway 30
La Grande, Oregon 97850-5628
Email: peter.d.olmstead@usace.army.mil
Telephone: (541) 962-0401
PUBLIC NOTICE
Oregon Department of Environmental Quality (DEQ)
Water Quality 401 Certification
Notice Issued: March 4, 2016
Written Comments Due: April 4, 2016
Corps of Engineers No: NWP-2015-432
Oregon Department of State Lands No: 58511
WHO IS THE APPLICANT:City of Halfway
LOCATION OF CERTIFICATION ACTIVITY:See attached U.S. Army Corps of Engineers public notice.
WHAT IS PROPOSED:See attached U.S. Army Corps of Engineers public notice on the proposed project.
NEED FOR CERTIFICATION:Section 401 of the Federal Clean Water Act requires applicants for Federal permits or licenses to provide the Federal agency a water quality certification from the State of Oregon if the proposed activity may result in a discharge to waters of the state.
DESCRIPTION OF DISCHARGES:See attached U.S. Army Corps of Engineers public notice on the proposed project.
WHERE TO FIND DOCUMENTS:Documents and materials related to water quality issues as a result of the proposal are available for examination and copying at Oregon Department of Environmental Quality, 401 Water Quality Certification Coordinator, Northwest Region,700 NE Multnomah Street, Suite 600, Portland, Oregon 97232. Other project materials are available by contacting the Corps per the attached public notice.
Scheduling an appointment will ensure that water quality documents are readily accessible during your visit. To schedule an appointment please call DEQ Water Quality at Northwest Region at (503) 229-5263.
Any questions on the water quality certification process may be addressed to the 401 Program Coordinator at (503) 229-6030 or toll free within Oregon at (800) 452-4011. People with hearing impairments may call the Oregon Telecommunications Relay Service at 1-800-735-2900.
PUBLIC PARTICIPATION:
Public Hearing: Oregon Administrative Rule (OAR) 340-48-0032 (2) states that “The Corps provides public notice of and opportunity to comment on the applications, including the application for certification, provided that the department (DEQ), in its discretion, may provide additional opportunity for public comment, including public hearing.”
Written comments:
Written comments on project elements related to water quality must be received at the Oregon Department of Environmental Quality by 5 p.m. on the date specified in the upper right section on page one of this notice. Written comments may be emailed, mailed or faxed as described below:
Email - 401publiccomments@deq.state.or.us
Mail - Oregon Department of Environmental Quality, Northwest Region
700 NE Multnomah Street, Suite 600
Portland, Oregon 97232
Attn: 401 Water Quality Certification Coordinator
Fax - (503) 229-6957
WHAT HAPPENS NEXT: DEQ will review and consider all comments received during the public comment period. Following this review, certification of the proposal may be issued as proposed, issued with conditions, or denied. You will be notified of DEQ's final decision if you submit comments during the comment period. Otherwise, if you wish to receive notification, please call or write DEQ at the above address.
ACCESSIBILITY INFORMATION:This publication is available in alternate format (e.g. large print, Braille) upon request. Please contact DEQ Office of Communications and Outreach at (503) 229-5317 or toll free within Oregon at 1-800-452-4011 to request an alternate format. People with a hearing impairment can receive help by calling the Oregon Telecommunications Relay Service at 1-800-735-2900.
To Cornucopia
PROJECT
LOCATION
Halfway
URBAN
GROWTH
BOUNDARY
CITY LIMITS
VICINITY MAP
EXISTING WASTEWATER
TREATMENT FACILITY
HALFWAY
OREGON HWY. 86
To Oxbow
PROPOSED
WASTEWATER
TREATMENT
FACILITY
IMPROVEMENTS
COMPENSATORY WETLAND
MITIGATION SITE
PROPOSED
IRRIGATION
STORAGE POND
AND EFFLUENT
IRRIGATION
SITE
PROPOSED EFFLUENT FORCEMAIN TO
IRRIGATION STORAGE POND
OREGON
Job# 986-22-207 Dec. 7, 2015 lbauer
HWY. 86
PINE
T. 8 S., R. 46 E., W.M.
2000
SCALE IN FEET
0
2000
To Richland and Baker City
CITY OF
anderson
perry
HALFWAY, OREGON
WASTEWATER SYSTEM IMPROVEMENTS
JOINT PERMIT APPLICATION
& associates, inc.
LOCATION AND VICINITY MAPS
NWP-2015-432 (17 pgs)
FIGURE
1
Job# 986-22-207 Dec. 8, 2015 lbauer
To Cornucopia
URBAN GROWTH
BOUNDARY
CITY LIMITS
PROPOSED INFLUENT METER
STATION IMPROVEMENTS
WETLAND 1
PROPOSED EFFLUENT
PUMP STATION
SEE FIGURE 4
HALFWAY
EXISTING WASTEWATER
TREATMENT FACILITY
PROPOSED
COLLECTION
SYSTEM
REHABILITATION
PROPOSED
LAGOON CELLS
IMPROVEMENT
To Oxbow
EXISTING WINTER SURFACE
WATER DISCHARGE
OREGON
HWY. 86
COMPENSATORY
WETLAND
MITIGATION SITE WETLANDS 12, 13,
AND 14 - SEE FIGURE 8
PROPOSED EFFLUENT FORCEMAIN
TO IRRIGATION STORAGE POND
WETLAND 4 - SEE FIGURE 6
PROPOSED DITCH CROSSING 1 (C1)
SEE FIGURE 6
WETLAND 3 -
SEE FIGURE 2B FOR CONTINUATION
CITY OF
T. 8 S., R. 46 E., W.M.
1000
SCALE IN FEET
0
anderson
perry
& associates, inc.
1000
HALFWAY, OREGON
WASTEWATER SYSTEM IMPROVEMENTS
JOINT PERMIT APPLICATION
PROPOSED IMPROVEMENTS
EXISTING SUMMER
EFFLUENT IRRIGATION
SITE
SEE FIGURE 5
FIGURE
2A
Job# 986-22-207 Dec. 8, 2015 lbauer
To Halfway
SEE FIGURE 2A FOR CONTINUATION
To Oxbow
PROPOSED EFFLUENT FORCEMAIN
TO IRRIGATION STORAGE POND
PROPOSED STAGING AREA
PROPOSED IRRIGATION
PUMP STATION
PROPOSED TOPSOIL
DISPOSAL AREA
PROPOSED IRRIGATION STORAGE POND
SEE FIGURE 7
WETLAND 6, 7, AND 8
OREGON HWY. 86
SEE FIGURE 7
PROPOSED
IRRIGATION PIPING
SEE FIGURE 7
PROPOSED EFFLUENT
IRRIGATION SITE
EXISTING IRRIGATION PIVOT
WETLAND 9
SEE FIGURE 7
To Richland and Baker City
CITY OF
T. 8 S., R. 46 E., W.M.
1000
SCALE IN FEET
0
anderson
perry
& associates, inc.
1000
HALFWAY, OREGON
WASTEWATER SYSTEM IMPROVEMENTS
JOINT PERMIT APPLICATION
PROPOSED IMPROVEMENTS
FIGURE
2B
Job# 986-22-207 Dec. 8, 2015 lbauer
To Cornucopia
e
Pin
URBAN GROWTH
BOUNDARY
CITY LIMITS
08S46E16 500
Kuwahara, Charles W. and Brenda E.
EXISTING WASTEWATER
TREATMENT FACILITY
08S46E16 501
Becker, Michael A.
HALFWAY
08S46E17AA 100
Pine Valley Cemetery Assoc.
08S46E17AA 600
Ralls, Ronda I.
08S46E16 400
City of Halfway
08S46E17 1500
Traw, Dustin and Kristin
08S46E17 1501
Dyke, Dana A.
08S46E17 1400
45 Ranch, LLC
Lee
PROPOSED EFFLUENT FORCEMAIN
TO IRRIGATION STORAGE POND
08S46E16 700
Pine Valley
Fair Assoc.
Cre
ek
08S46E17 1600
Buchanan, Greg
SEE FIGURE 3B FOR CONTINUATION
k
08S46E17 1700
Votaw, Steven et al
CITY OF
T. 8 S., R. 46 E., W.M.
1000
SCALE IN FEET
0
anderson
perry
& associates, inc.
1000
Cr
ee
HALFWAY, OREGON
WASTEWATER SYSTEM IMPROVEMENTS
JOINT PERMIT APPLICATION
TAX LOT MAP
OREGON HWY. 86
COMPENSATORY
WETLAND
MITIGATION SITE
To Richland
and Baker
City
FIGURE
3A
To Oxbow
PROPOSED
WASTEWATER
TREATMENT
FACILITY
IMPROVEMENTS
08S46E16 600
Becker, Michael A.
Job# 986-22-207 Dec. 8, 2015 lbauer
To Halfway
SEE FIGURE 3A FOR CONTINUATION
To Oxbow
08S46E17 1600
Buchanan, Greg
PROPOSED EFFLUENT FORCEMAIN
TO IRRIGATION STORAGE POND
08S46E17 1100
Gover, George L. and Marcia M.
OREGON HWY. 86
08S46E17 1800
Gover Family Trust
Po
s
ey
ey
ll
Va
PROPOSED IRRIGATION STORAGE POND
ch
Dit
PROPOSED EFFLUENT
IRRIGATION SITE
08S46E 3200
Gover, George L. and Marcia M.
To Richland and Baker City
CITY OF
T. 8 S., R. 46 E., W.M.
1000
SCALE IN FEET
0
anderson
perry
& associates, inc.
1000
HALFWAY, OREGON
WASTEWATER SYSTEM IMPROVEMENTS
JOINT PERMIT APPLICATION
TAX LOT MAP
FIGURE
3B
Q:\HALFWAY\986-22_WWSI_2015\DWG\JPA\JPA-Plans.dwg
TRENCH EXCAVATION AND RESTORATION FOR WETLAND AREAS, TYP.
(WITH LOCATING WIRE)
CITY OF
anderson
perry
&
associates, inc.
HALFWAY, OREGON
WASTEWATER SYSTEM IMPROVEMENTS
JOINT PERMIT APPLICATION
TRENCH EXCAVATION AND
RESTORATION FOR WETLAND AREAS
FIGURE
5
Q:\HALFWAY\986-22_WWSI_2015\DWG\JPA\JPA-Plans.dwg
WETLAND 1
FAIRGROUNDS RD
NEW 6"
FORCEMAIN
CITY OF
anderson
perry
&
HALFWAY, OREGON
WASTEWATER SYSTEM IMPROVEMENTS
JOINT PERMIT APPLICATION
associates, inc.
WETLAND 1
FIGURE
6
Q:\HALFWAY\986-22_WWSI_2015\DWG\JPA\JPA-Plans.dwg
HI G
HW
AY
4
13
WETLAND 3
NEW 6"
FORCEMAIN
WETLAND 2
FAIRGROUNDS RD
CITY OF
anderson
perry
&
HALFWAY, OREGON
WASTEWATER SYSTEM IMPROVEMENTS
JOINT PERMIT APPLICATION
associates, inc.
WETLAND 3
FIGURE
7
Q:\HALFWAY\986-22_WWSI_2015\DWG\JPA\JPA- DITCH-XINGS.dwg
6" RJ DI
CROSSING 1 (C1) PROFILE
CITY OF
anderson
perry
&
HALFWAY, OREGON
WASTEWATER SYSTEM IMPROVEMENTS
JOINT PERMIT APPLICATION
associates, inc.
CROSSING 1 (C1) PROFILE
FIGURE
8B
Q:\HALFWAY\986-22_WWSI_2015\DWG\JPA\JPA- DITCH-XINGS.dwg
NOTE: DITCH CROSSING WORK SHALL BE COMPLETED
IN ACCORDANCE WITH THE 404 PERMIT. SEE THE
APPENDICES IN THE CONTRACT DOCUMENTS
CROSSING 1 (C1)
WETLAND 4
PLAN
CITY OF
anderson
perry
&
associates, inc.
HALFWAY, OREGON
WASTEWATER SYSTEM IMPROVEMENTS
JOINT PERMIT APPLICATION
CROSSING 1 (C1), WETLAND 4
FIGURE
8A
Q:\HALFWAY\986-22_WWSI_2015\DWG\JPA\JPA-Reservoir.dwg
LEGEND
STAGING AREA
WETLAND 6
IRRIGATION AREA
ACCESS ROAD
DAM A
WETLAND 8
TOPSOIL
DISPOSAL
AREA
WETLAND 7
DAM B
CITY OF
anderson
perry
&
associates, inc.
HALFWAY, OREGON
WASTEWATER SYSTEM IMPROVEMENTS
JOINT PERMIT APPLICATION
IRRIGATION STORAGE POND-OVERVIEW
FIGURE
9A
Q:\HALFWAY\986-22_WWSI_2015\DWG\JPA\JPA-Reservoir.dwg
STAGING AREA
WETLAND 6
DAM A
WETLAND 7
CITY OF
anderson
perry
&
HALFWAY, OREGON
WASTEWATER SYSTEM IMPROVEMENTS
JOINT PERMIT APPLICATION
associates, inc.
WETLANDS 6 AND 7
FIGURE
9B
Q:\HALFWAY\986-22_WWSI_2015\DWG\JPA\JPA-Reservoir.dwg
WETLAND 8
CITY OF
anderson
perry
&
HALFWAY, OREGON
WASTEWATER SYSTEM IMPROVEMENTS
JOINT PERMIT APPLICATION
associates, inc.
WETLAND 8
FIGURE
9C
Q:\HALFWAY\986-22_WWSI_2015\DWG\JPA\JPA- Section.dwg
TYPICAL SECTION
GENERAL DAM EMBANKMENT BORROW AREA
CITY OF
anderson
perry
&
associates, inc.
HALFWAY, OREGON
WASTEWATER SYSTEM IMPROVEMENTS
JOINT PERMIT APPLICATION
TYPICAL SECTION
FIGURE
9D
Q:\HALFWAY\986-22_WWSI_2015\DWG\JPA\JPA-Mitigation Impacts.dwg
AREA OF IMPACT
LEGEND
CITY OF
NOTE:
anderson
perry
&
associates, inc.
HALFWAY, OREGON
WASTEWATER SYSTEM IMPROVEMENTS
JOINT PERMIT APPLICATION
COMPENSATORY WETLAND
FIGURE
10
Q:\HALFWAY\986-22_WWSI_2015\DWG\JPA\JPA-Mitigation Impacts.dwg
LEGEND
CITY OF
NOTE:
anderson
perry
&
associates, inc.
HALFWAY, OREGON
WASTEWATER SYSTEM IMPROVEMENTS
JOINT PERMIT APPLICATION
WETLAND MITIGATION SUMMARY -
FIGURE
11
Q:\HALFWAY\986-22_WWSI_2015\DWG\JPA\JPA-Compensatory Wetland Mitigation.dwg
PLAN
SECTION A
CITY OF
anderson
perry
&
associates, inc.
HALFWAY, OREGON
WASTEWATER SYSTEM IMPROVEMENTS
JOINT PERMIT APPLICATION
COMPENSATORY WETLAND MITIGATION
FIGURE
12
PUBLIC NOTICE
Application for Permit
Issue Date: March 4, 2016
Expiration Date: April 4, 2016
US Army Corps of Engineers No: NWP-2015-432
Oregon Department of State Lands No: 58511
30-Day Notice
Interested parties are hereby notified the U.S. Army Corps of Engineers, Portland District
(Corps) has received an application for a Department of the Army permit for certain work in
waters of the United States, as described below and shown on the attached plans. The
Corps is soliciting comments on the proposed work.
Applicant:
City of Halfway
Attention: Sheila Farwell
155 B East Record Street
Halfway, Oregon 97834
Email: thecitybypage@hotmail.com
Telephone: (541) 742-4741
Applicant's Agent: Anderson Perry & Associates, Inc
Attention: Laurie Parry
P.O. Box 1107
La Grande, Oregon 97850
Email: lparry@andersonperry.com
Telephone: (541) 963-8309
Location: The proposed project originates at the existing wastewater treatment facility at the
corner of Fairgrounds Road and Pine Creek Highway and extends south approximately 2
miles along Gover Lane to Posey Valley (just north of Posey Valley Lane), in the City of
Halfway, Baker County, Oregon. The site is in Sections 16, 17, & 20, Township 8 South,
Range 46 East. Latitude and Longitude (center): 44.8712° North, -117.1090° West
Waterways: Wetlands adjacent to Pine Creek, unnamed tributary of Pine Creek and adjacent
wetlands, wetlands adjacent to Lee Creek, wetlands adjacent to an unnamed tributary of Sag
Creek.
Project Purpose: To provide an alternative wastewater discharge system for the City of
Halfway to bring them into compliance with the National Pollutant Discharge Elimination
System (NPDES).
Project Description: The project would allow wastewater from the City's existing treatment
facility to be pumped offsite to a new storage pond and then utilized for irrigation on the
Gover Property in Posy Valley. The overall project includes improvements to the existing
Corps No. NWP-2015-432
Page 1 of 7
wastewater facility, installation of new 7,300-foot long force main pipeline, construction of a
new 8.38-acre storage pond, and a new irrigation pivot system. Activities proposed within
waters of the U.S would be limited to only those associated with the new pipeline and storage
pond, as follows:
·
A 2-foot wide by 215-foot long by 4-foot deep trench would be excavated in "Wetland
1", an emergent wetland adjacent to Pine Creek. Up to 100 cubic yards of native soil
from the trench excavation would be temporarily sidecast into the wetland and
stockpiled for use in restoration after the pipe is installed. In total, 968 square feet of
the wetland would be temporarily impacted, but restored to preconstruction contours
using the native wetland topsoil.
·
A 4.5-foot wide by 256-foot long by 4-foot deep trench would be excavated in "Wetland
3", an emergent wetland adjacent to Lee Creek. Up to 115 cubic yards of native soil
from the trench would be temporarily sidecast into the wetland and stockpiled for use in
restoration after the pipe is installed. In total, 1,152 square feet of the wetland would be
temporarily impacted, but restored to preconstruction contours using the native wetland
topsoil.
·
A 7-foot wide by 34-foot long by 7-foot deep trench would be excavated in "Ditch 1", an
unnamed tributary of Pine Creek. Up to 20 cubic yards of native material will be
removed from 240 square feet of the creek and stockpiled in the adjacent uplands for
use in restoration after the pipe is installed. Bentonite trench plugs will be installed in
the trench on both sides of the waterbody crossing to prevent stream flows from
following the pipeline after restoration. Two 3-foot wide by 12.5-foot long temporary
sandbag coffer dams would be installed in the creek to divert stream flows through a
bypass pipe during construction. The stream crossing would also require the removal of
2 cubic yards of material over 16 square feet of "Wetland 4", an emergent wetland
adjacent to the creek. That material would be temporarily sidecast in the adjacent
uplands and stockpiled for use in restoration after the pipe is installed. The wetland and
stream would be fully restored to preconstruction contours using the native material
removed during trench excavation.
·
Creation of the new 8.38-acre wastewater storage pond would require the installation of
two approximately 20-foot tall dams in Posey Valley. The northernmost dam (Dam A)
would be approximately 175-foot wide by 650-foot long and would result in permanent
fill into wetlands. The overall construction of the storage pond and its appurtenances
would result in the permanent loss of 0.07 acres of "Wetland 6", 0.05 acres of "Wetland
7", and 1.78 acres of "Wetland 8"; all wetlands adjacent to an unnamed tributary of Sag
Creek. The permanent loss of these wetlands would result from either direct filling or
excavation and/or permanent inundation (i.e. conversion from wetland to open water),
as depicted on sheets 9A through 9D of the enclosed drawings.
In total, the project would result in temporary impacts to 0.05 acres of wetlands and 240
square feet of stream from the pipeline; and the permanent loss of 1.9 acres of wetlands from
the storage pond.
Mitigation: The applicant proposes to avoid and minimize impacts from the project by
storing motorized equipment at least 150 feet away from waterbodies during non-work hours,
Corps No. NWP-2015-432
Page 2 of 7
performing all in-stream work during the ODFW-approved work window of July 1 to August
31, installing appropriate erosion controls around waterbodies, treating any sediment-laden
water from the work areas before allowing it to return to waterbodies, and minimizing
disturbance on soils and vegetation from heavy equipment. The applicant has provided a
proposed compensatory wetland mitigation plan to offset losses of waters of the U.S. that
may result from the proposed project. They propose the creation of 2.48 acres of new
emergent wetlands and the enhancement of 0.57 acres of existing wetlands, adjacent to Pine
Creek near the existing wastewater treatment facility. The Corps will determine the type and
amount of compensatory mitigation necessary to offset environmental losses from the
proposed project.
Drawings: Seventeen (17) drawings are attached and labeled Corps No. NWP-2015-432.
Copies of this public notice, which have been mailed or otherwise physically distributed,
feature project drawings in black and white. The electronic version features those drawings
in color, which we think more accurately illustrates the proposed project. To access the
electronic version of this public notice, go to the Portland District website at
http://www.nwp.usace.army.mil/ and select Regulatory Branch Permit Information. At the
Regulatory page select Regulatory Public Notices.
Authority: The proposed project will be evaluated under the following:
Section 404, Clean Water Act (33 U.S.C. 1344), for discharge of dredged or fill
material into waters of the United States.
Clean Water Act Section 404(b)(1) Guidelines: The described discharge will be evaluated
for compliance with guidelines promulgated by the U.S. Environmental Protection Agency
under authority of Section 404(b)(1) of the Clean Water Act. The 404(b)(1) Guidelines are
the substantive criteria used in evaluating discharges of dredged or fill material into waters of
the United States. Should a permit be issued, the Corps will evaluate the fill material source
(i.e., borrow site) prior to the start of construction.
Water Quality Certification: Section 401 of the Clean Water Act (33 U.S.C. 1341) requires
applicants to obtain a water quality certification for proposed discharges into waters of the
United States. A permit for the described work will not be issued until certification has been
issued or is waived from the certifying state. Attached is the state's notice for a water quality
certification.
Endangered Species: Section 7 of the Endangered Species Act (ESA) (16 U.S.C 1536)
requires federal agencies to consult with the National Marine Fisheries Service (NMFS)
and/or U.S. Fish and Wildlife Service (USFWS) on all actions that may affect a species listed
(or proposed for listing) under the ESA as threatened or endangered or that may adversely
modify designated critical habitat. The Corps' preliminary review indicates the described
activity will not affect any endangered species or designated critical habitat. For this project,
the U.S. Department of Housing and Urban Development, as the lead Federal agency for
ESA consultation, will consult with the NMFS and/or the USFWS as needed under Section 7
of the ESA.
Essential Fish Habitat: Section 305(b)(2) of the Magnuson-Stevens Fishery Conservation
and Management Act (MSA) as amended (16 U.S.C 1855), requires Federal agencies to
consult with the NMFS on all actions, or proposed actions, permitted, funded, or undertaken
Corps No. NWP-2015-432
Page 3 of 7
by the agency, that may adversely affect Essential Fish Habitat (EFH). The Corps'
preliminary review indicates the described activity would not adversely affect EFH at the
project location or in its vicinity. For this project, the U.S. Department of Housing and Urban
Development, as the lead Federal agency for MSA consultation, will consult with the NMFS
as necessary.
Historic Properties/Cultural Resources: Section 106 of the National Historic Preservation
Act (NHPA) of 1966, as amended (16 U.S.C. 470), requires Federal agencies to consult with
the appropriate State and/or Tribal Historic Preservation Officer to take into account the
effects of actions they undertake or permit on historic properties listed in or eligible for listing
in the National Register of Historic Places. For this project, the U.S. Department of Housing
and Urban Development, as the lead Federal agency for determining compliance with
Section 106 of the NHPA, will consult with the appropriate State and/or Tribal Historic
Preservation Officer as applicable.
The Corps' preliminary review indicates a historic properties investigation has been
conducted within the permit area. The results of that survey are currently being coordinated
with the State Historic Preservation Office (SHPO) and Native American Tribes. If based on
the review of that survey it is determined there will be an adverse effect to historic properties,
a Memorandum of Agreement to mitigate for adverse effects will be implemented.
This notice has been provided to the SHPO, interested Native American Indian Tribes, and
other interested parties. If you have information pertaining to cultural resources within the
permit area that may not have been identified during the abovementioned survey, please
provide this information to the Corps' project manager (identified on page 1 of this notice) to
assist in a complete evaluation of potential effects.
State and Local Authorizations: The applicant has obtained approval from Baker County
and will be applying for the following additional governmental authorizations for the project:
·
·
Oregon DEQ 1200-C Permit & 401 WQC
DSL removal/fill permit
Public Hearing: Any person may request in writing within the comment period specified in
this notice that a public hearing be held to consider this application. Requests for public
hearings shall state with particularity the reasons for holding a public hearing.
Evaluation: The decision whether to issue a permit will be based on an evaluation of the
probable impact, including cumulative impacts, of the described activity on the public interest.
That decision will reflect the national concern for both protection and utilization of important
resources. The benefit, which reasonably may be expected to accrue from the described
activity, must be balanced against its reasonably foreseeable detriments. All factors, which
may be relevant to the described activity will be considered including the cumulative effects
thereof; among those are conservation, economics, aesthetics, general environmental
concerns, wetlands, historic properties, fish and wildlife values, flood hazards, floodplain
values, land use, navigation, shoreline erosion and accretion, recreation, water supply and
conservation, water quality, energy needs, safety, food and fiber production, mineral needs,
consideration of property ownership and, in general, the needs and welfare of the people.
Corps No. NWP-2015-432
Page 4 of 7
The Corps is soliciting comments from the public; Federal, state, and local agencies and
officials; Indian Tribes; and other interested parties in order to consider and evaluate the
impacts of the proposed project. Any comments received will be considered by the Corps to
determine whether to issue, modify, condition or deny a permit for this proposal. To make
this decision, comments are used to assess impacts on endangered species, historic
properties, water quality, general environmental effects, and the other public interest factors
listed above. Comments are used in the preparation of an Environmental Assessment and/or
an Environmental Impact Statement pursuant to the National Environmental Policy Act.
Comments are also used to determine the need for a public hearing and to determine the
overall public interest of the proposed activity.
Submitting Comments: Interested parties are invited to provide comments on the proposed
project. Comments may be submitted by conventional mail or email. All comments received
will be considered in determining whether authorizing the work would be contrary to the
public interest.
Either conventional mail or e-mail comments must include the Corps reference number as
shown on page 1 and include the commenter's name and address. In order to be accepted,
e-mail comments must originate from the author's e-mail account and must include on the
subject line of the e-mail message the Corps reference number. All comments received will
become part of the administrative record and are subject to public release under the Freedom
of Information Act including any personally identifiable information such as names, phone
numbers, and addresses.
Additional information about the proposed project may be obtained from the Corps Project
Manager listed below. All comments, whether by conventional mail or email, must be
received no later than the expiration date of this public notice to ensure consideration.
Comments should be submitted to the following mailing address or email address:
U.S. Army Corps of Engineers
Peter Olmstead
La Grande Field Office
3502 Highway 30
La Grande, Oregon 97850-5628
Email: peter.d.olmstead@usace.army.mil
Telephone: (541) 962-0401
Corps No. NWP-2015-432
Page 5 of 7
PUBLIC NOTICE
Oregon Department of Environmental Quality (DEQ)
Water Quality 401 Certification
Notice Issued: March 4, 2016
Written Comments Due: April 4, 2016
Corps of Engineers No: NWP-2015-432
Oregon Department of State Lands No: 58511
WHO IS THE APPLICANT: City of Halfway
LOCATION OF CERTIFICATION ACTIVITY: See attached U.S. Army Corps of Engineers
public notice.
WHAT IS PROPOSED: See attached U.S. Army Corps of Engineers public notice on the
proposed project.
NEED FOR CERTIFICATION: Section 401 of the Federal Clean Water Act requires
applicants for Federal permits or licenses to provide the Federal agency a water quality
certification from the State of Oregon if the proposed activity may result in a discharge to
waters of the state.
DESCRIPTION OF DISCHARGES:
notice on the proposed project.
See attached U.S. Army Corps of Engineers public
WHERE TO FIND DOCUMENTS: Documents and materials related to water quality issues
as a result of the proposal are available for examination and copying at Oregon Department
of Environmental Quality, 401 Water Quality Certification Coordinator, Northwest Region,
700 NE Multnomah Street, Suite 600, Portland, Oregon 97232. Other project materials are
available by contacting the Corps per the attached public notice.
Scheduling an appointment will ensure that water quality documents are readily accessible
during your visit. To schedule an appointment please call DEQ Water Quality at Northwest
Region at (503) 229-5263.
Any questions on the water quality certification process may be addressed to the 401
Program Coordinator at (503) 229-6030 or toll free within Oregon at (800) 452-4011. People
with hearing impairments may call the Oregon Telecommunications Relay Service at 1-800735-2900.
Corps No. NWP-2015-432
Page 6 of 7
PUBLIC PARTICIPATION:
Public Hearing: Oregon Administrative Rule (OAR) 340-48-0032 (2) states that "The Corps
provides public notice of and opportunity to comment on the applications, including the
application for certification, provided that the department (DEQ), in its discretion, may provide
additional opportunity for public comment, including public hearing."
Written comments:
Written comments on project elements related to water quality must be received at the
Oregon Department of Environmental Quality by 5 p.m. on the date specified in the upper
right section on page one of this notice. Written comments may be emailed, mailed or faxed
as described below:
Email - 401publiccomments@deq.state.or.us
Mail - Oregon Department of Environmental Quality, Northwest Region
700 NE Multnomah Street, Suite 600
Portland, Oregon 97232
Attn: 401 Water Quality Certification Coordinator
Fax - (503) 229-6957
WHAT HAPPENS NEXT: DEQ will review and consider all comments received during the
public comment period. Following this review, certification of the proposal may be issued as
proposed, issued with conditions, or denied. You will be notified of DEQ's final decision if you
submit comments during the comment period. Otherwise, if you wish to receive notification,
please call or write DEQ at the above address.
ACCESSIBILITY INFORMATION: This publication is available in alternate format (e.g. large
print, Braille) upon request. Please contact DEQ Office of Communications and Outreach at
(503) 229-5317 or toll free within Oregon at 1-800-452-4011 to request an alternate format.
People with a hearing impairment can receive help by calling the Oregon
Telecommunications Relay Service at 1-800-735-2900.
Corps No. NWP-2015-432
Page 7 of 7