The applicant proposes to discharge fill material into 8.3 acres of scrub shrub wetlands.
Full Public Notice Project Plans
The applicant proposes to discharge fill material into
8.3 acres of emergent and scrub shrub wetlands during the construction of a
ground flare, an access road, and one truss tower supporting a 459-foot-long
pipe rack. The pipe rack is supported by
four truss towers, each consisting of a series of nine driven concrete piles
with a concrete cap. Only one truss tower
is constructed in wetlands, resulting in a discharge of fill material. The access road and pipe rack will connect
the proposed ground flare to a constructed ethane steam cracker unit within the
applicant’s existing facility. The
proposed ground flare, impacting 7.3 acres of wetlands, will be 453-foot by
478-foot in area at the base with a 1:1 slope to the flare deck which will be
elevated to approximately 17 feet mean sea level (msl). A total of 4,300 columns/piles will be
installed in the ground to support the flare.
Approximately 126,500 cubic yards of sandy/clay material will be used
for the flare base and an additional 15,900 cubic yards of grout will be used
for the columns/piles. The access road,
impacting 1.0 acres of wetlands, will be 30-foot-wide by 840-foot-long, and
will connect the existing haul road to the proposed ground flare. An additional 50 feet on each side of the
road will be temporarily required for construction. The access road will be graded to elevate
from 9 feet msl to the 17 feet msl elevation of the flare deck. Approximately 420 columns/piles will be
installed to support the earthen embankment of the road. Approximately 16,800 cubic yards of sandy/clay
material will be used for the embankment and an additional 1,030 cubic yards of
grout will be used for the columns/piles.