As shown on project plans included with this notice

Basic information

Fill out these two fields at minimum.

— or —

How Big?

Where?

Links to source documents

Raw text

You can copy from here when filling out the rest of the page.

As shown on project plans included with this notice, the applicant proposes to: a) remove an illegal bulkhead and associated fill; b) install a new steel replacement bulkhead 24” waterward from the original bulkhead, with fill placed between the two bulkheads (61.2 linear feet); and c) remove existing illegal dock structures and construct a 4’ x 10.6’ fixed pier, 3’ x 17’ ramp, and 8’ x 34’ floating dock in Sea Isle City, Cape May County, NJ.

APPLICANT: James Golden and Joseph Revello AGENT: Water’s Edge Environmental, LLC;P. O. Box 118Ocean City, New Jersey 08226 WATERWAY: Ludlam Thorofare LOCATION: Decimal Latitude: 39.156661° North; Longitude: -74.699720° West.The project site is located in and along Ludlam Thorofare, at 4400 Venicean Road (Venicean Road and 44th Street), Block 44.05, Lot 129.02, in the City of Sea Isle City, Cape May County,New Jersey. This application has two co-applicants, who own separate duplex units on theproperty, with joint ownership of the water area. A location map is included with this notice. ACTIVITY: As shown on project plans included with this notice, the applicant proposes to:a) remove an illegal bulkhead and associated fill; b) install a new steel replacement bulkhead 24”waterward from the original bulkhead, with fill placed between the two bulkheads (61.2 linearfeet); and c) remove existing illegal dock structures and construct a 4’ x 10.6’ fixed pier, 3’ x 17’ramp, and 8’ x 34’ floating dock. The applicant proposes to use non-polluting materials for thenew dock structures. One vessel would be moored at the proposed dock (approximately 28’length, 9’ beam). The dock may also be used for a kayak. All work would occur from vessels inthe water, except for some limited work from the land side in the upland area immediately alongthe bulkhead to install the anchor system.

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits