You can copy from here when filling out the rest of the page.
EXCAVATION AND PLACEMENT OF FILL FOR LEVEE REPAIRS IN LAFOURCHE PARISH
NAME OF APPLICANT:
North Lafourche Conservation Levee & Drainage District, c/o Joseph C.
Picciola, II, P.O. Box 687, Cut Off, Louisiana 70345.
LOCATION OF WORK:
Near Bayou Lafourche, the Forty Arpent Canal, and the Intracoastal
Waterway, Section 102, T17S-R20E, in Larose, Louisiana, in Lafourche Parish,
within the East Central Louisiana Coastal Basin in hydrologic unit (HUC 08090301),
as shown on the attached drawings.
CHARACTER OF WORK:
The applicant requested an emergency authorization to complete levee
repairs and reduce potential flood hazards for residences associated with backwater flooding from high Mississippi River
levels. An emergency authorization was
granted on March 24, 2015 allowing the repairs and requiring a follow up
application to permit the activities which took place during the levee repair. The applicant is now requesting Department of
the Army authorization for work done to excavate jurisdictional wetlands and
deposit the material on the existing degraded levee to restore flood protection
on the east side of Bayou Lafourche in Larose, Louisiana above the Intracoastal
Waterway. Approximately 33,440 cubic
yards of material was excavated from a jurisdictional herbaceous wetland
adjacent to the levee and was deposited on the existing levee for refurbishment
and repair.
A Preliminary analysis has determined
that the proposed project directly impacted 1.0 acre of jurisdictional
herbaceous wetlands.
The applicant has designed the project to avoid and
minimize direct and secondary adverse impacts to the maximum extent
practicable. Any further reduction in
the levee repair would not meet engineering construction standards at the
project site. As compensation for
unavoidable wetland impacts, the applicant proposes to mitigate in-kind wetland
credits from a Corps approved mitigation bank located in the watershed.