You can copy from here when filling out the rest of the page.
draft EA Santa Fe Dam Sediment Removal for 30 day public review.
The U.S. Army Corps of Engineers, Los Angeles District (Corps), announces availability of the draft Environmental Assessment for the Santa Fe Dam Basin Spoils Material Stockpile Removal Project. The proposed project entails removal of approximately 250,000 cubic yards of spoil material from the Santa Fe Flood Risk Management Basin as part ofthe Corps' long-term maintenance operations. The material generally consists of sand, gravel, and cobble material from maintenance activities over the past several decades, such as excavation for the construction of nearby percolation ponds, and silty sand from the outlet works. The project would include excavation and use or disposal of the stockpiled material. The Corps proposes to grant a temporary easement to a contractor for access to perform the activities. In support of the easement, the contractor would also provide in-kind services. The contractor would resurface two 0.2 acre parking lots near the dam control house off Arrow Highway as in-kind services.
The
Corps is soliciting comments from the public; Federal, state, and
local agencies and officials; and other interested parties in order to consider
and evaluate the impacts of this proposed project and alternatives.
Comments
will be accepted from March 18, 2016 to April 18, 2016.
Comments
should be mailed to:
U.S. Army Corps of Engineers
Kenneth Wong, Planning Division
915 Wilshire Blvd., 14th Floor
Los Angeles, CA 90017
Alternatively,
comments can be sent electronically to: kenneth.wong@usace.army.mil