PLACEMENT OF FILL FOR THE CONSTRUCTION OF A RESIDENTIAL SUBDIVISION THE SANCUARY AT JUBAN CROSSING IN LIVINGSTON PARISH
NAME OF APPLICANT:
Eric Spearmen, The Sanctuary at Juban Crossing, c/o Coastal
Environmental, Inc., Attn: Hunter Guidry, 1260 Main Street, Baton Rouge,
Louisiana 70802.
LOCATION OF WORK:
Approximately 1.4 miles north of I-12, Section 33, T6S-R3E, in Denham
Springs, Louisiana, in Livingston Parish, within the Amite River Basin in
hydrologic unit (HUC 08070202), as shown on the attached drawings.
CHARACTER OF WORK:
The applicant has requested Department of the Army authorization to
clear, grade, excavate, and deposit fill and concrete/road base to construct
and maintain a residential subdivision (The Sanctuary at Juban Crossing) to
include 135 lots, streets, house pads, utilities, a storm water detention pond
and drainage utilities. Approximately 2,900
cubic yards of fill material and concrete/road base will be hauled in and
deposited to achieve required grade elevation requirements. The proposed project is situated on an
approximately 34-acre tract that has been determined to include approximately
3.18 acres of forested wetlands. A preliminary
analysis has determined that the proposed project would directly impact
approximately 1.53 acres of jurisdictional forested wetlands during
construction. It is anticipated that the
proposed action would have minimal impact on adjacent wetlands.
The
applicant has designed the project to avoid and minimize direct and secondary
adverse impacts to the maximum extent practicable. Any further reduction would limit usage of
the property and, therefore function deeming the project impracticable. As compensation for unavoidable wetland
impacts, the applicant proposes to mitigate in-kind wetland credits from a
Corps approved mitigation bank located in the watershed.