Home

Galveston District

Run scraper

The applicant proposes to construct 3

Basic information

Fill out these two fields at minimum.

— or —

How Big?

Where?

Links to source documents

Raw text

You can copy from here when filling out the rest of the page.

The applicant proposes to construct 3,901 linear feet of porous circular concrete breakwater system.

Full Public Notice Project Plans The applicant proposes to construct 3,901 linear feet of porous circular concrete breakwater system to provide shoreline protection and preserve coastal habitat along the western shoreline of Nueces Bay. The proposed breakwater system would consist of twelve breakwater structures, all of which would be installed on the sandy, non-vegetated bay bottom to avoid impacts to aquatic resources. Structures would consist of individual circular interlocking units measuring approximately 5 feet in diameter and 2 feet tall. Units would be partially submerged and alternately stacked to create an interlocking system between the upper and lower units. Based on engineering design, approximately 0.52 units would be installed per linear foot, resulting in a total project footprint of 0.86 acres and the placement of approximately 1,008 cubic yards of porous circular concrete material within open water. Construction and installation of the proposed project would be completed via light load barges equipped with cranes.

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas