The applicant proposes to construct 3,901 linear feet of porous circular concrete breakwater system.
Full Public Notice Project Plans
The applicant proposes to construct 3,901 linear feet of
porous circular concrete breakwater system to provide shoreline protection and
preserve coastal habitat along the western shoreline of Nueces Bay. The proposed breakwater system would consist
of twelve breakwater structures, all of which would be installed on the sandy,
non-vegetated bay bottom to avoid impacts to aquatic resources. Structures would consist of individual
circular interlocking units measuring approximately 5 feet in diameter and 2
feet tall. Units would be partially submerged
and alternately stacked to create an interlocking system between the upper and
lower units. Based on engineering
design, approximately 0.52 units would be installed per linear foot, resulting
in a total project footprint of 0.86 acres and the placement of approximately
1,008 cubic yards of porous circular concrete material within open water. Construction and installation of the proposed
project would be completed via light load barges equipped with cranes.