You can copy from here when filling out the rest of the page.
DREDGE AN ACCESS CHANNEL AND WELL SLIP
FOUR LEAGUE BAY IN TERREBONNE PARISH
NAME
OF APPLICANT: CASTEX ENERGY, c/o
Blue Ox Environmental, 2851 Johnston Street, Suite 1803, Lafayette,
Louisiana 70503
LOCATION
OF WORK:
Four League Bay, approximately 20 miles
west from Cocodrie, Louisiana, (29.321614, -91.142017), in Sections 6, 7, 8, 17
and 18, Township 20 South, Range 13 East,
in Terrebonne Parish, as shown on the enclosed drawings, within Hydrologic
Unit Code 08090302, West Central Louisiana Coastal.
CHARACTER
OF WORK: The applicant has requested Department of the
Army authorization to bucket dredge an access channel in order to place a
drilling barge on location and install and maintain a rock pad, two well head
protectors and appurtenant structures, all to drill and produce the Four League
Bay South Prospect and Four League South SWD Wells. The access channel length is 13,310-ft long x
70-ft wide. Approximately 121,450 cubic
yards of water bottoms will be excavated and the staggered spoil will be placed
70-ft wide x 200-ft long x 5-ft height with 100-ft gaps along the access
route. Spoil markers will be installed
every 300 feet. A 70-ft wide x 250-ft long x 1-ft deep
rock pad will be installed at the well site.
The entire site is located in open waters and no adverse impacts to
wetlands will be affected by this project.
JOINT PUBLIC NOTICE
April 4, 2016
United States Army
Corps of Engineers
New Orleans District
Attn: Regulatory Branch
Post Office Box 60267
New Orleans, Louisiana 70160-0267
State of Louisiana
Department of Environmental Quality
Attn: Water Quality Certification Sec.
Post Office Box 4313
Baton Rouge, Louisiana 70821-4313
Project Manager: Dirreen Arnold
(504) 862-2301 / fax: (504) 862-2574
dirreen.s.arnold@usace.army.mil
Permit Application Number:
MVN-2016-00397-CA
Project Manager:
Elizabeth Hill
(225) 219-3225 / fax: (225) 219-3156
WQC Application Number:
WQC-160317-02
Interested parties are hereby notified that a permit application has been received by the
New Orleans District of the US Army Corps of Engineers pursuant to: [X] Section 10 of the
Rivers and Harbors Act of March 3, 1899 (30 Stat. 1151; 33 USC 403); and/or [X] Section 404
of the Clean Water Act (86 Stat. 816; 33 USC 1344).
Application has also been made to the Louisiana Department of Environmental Quality,
Office of Environmental Services, for a Water Quality Certification (WQC) in accordance with
statutory authority contained in LRS 30:2074 A(3) and provisions of Section 401 of the Clean
Water Act.
DREDGE AN ACCESS CHANNEL AND WELL SLIP
FOUR LEAGUE BAY IN TERREBONNE PARISH
NAME OF APPLICANT: CASTEX ENERGY, c/o Blue Ox Environmental, 2851 Johnston
Street, Suite 1803, Lafayette, Louisiana 70503
LOCATION OF WORK: Four League Bay, approximately 20 miles west from Cocodrie,
Louisiana, (29.321614, -91.142017), in Sections 6, 7, 8, 17 and 18, Township 20 South,
Range 13 East, in Terrebonne Parish, as shown on the enclosed drawings, within
Hydrologic Unit Code 08090302, West Central Louisiana Coastal.
CHARACTER OF WORK: The applicant has requested Department of the Army authorization
to bucket dredge an access channel in order to place a drilling barge on location and install and
maintain a rock pad, two well head protectors and appurtenant structures, all to drill and
produce the Four League Bay South Prospect and Four League South SWD Wells. The access
channel length is 13,310-ft long x 70-ft wide. Approximately 121,450 cubic yards of water
bottoms will be excavated and the staggered spoil will be placed 70-ft wide x 200-ft long x 5-ft
height with 100-ft gaps along the access route. Spoil markers will be installed every 300 feet.
A 70-ft wide x 250-ft long x 1-ft deep rock pad will be installed at the well site. The entire site is
located in open waters and no adverse impacts to wetlands will be affected by this project.
-2-
It is presumed that the applicant has designed the project to avoid and minimize direct
and secondary adverse impacts to the maximum extent practicable.
The comment period for the Department of the Army Permit and the Louisiana
Department of Environmental Quality WQC will close 20 days from the date of this joint public
notice. Written comments, including suggestions for modifications or objections to the
proposed work, stating reasons thereof, are being solicited from anyone having interest in this
permit and/or this WQC request and must be submitted so as to be received before or by the
last day of the comment period. Letters concerning the Corps of Engineers permit application
must reference the applicant's name and the Permit Application Number, and be forwarded to
the Corps of Engineers at the address above, ATTENTION: REGULATORY BRANCH. Similar
letters concerning the Water Quality Certification must reference the applicant's name and the
WQC application number and be mailed to the Louisiana Department of Environmental Quality
at the address above. Individuals or parties may request an extension of time in which to
comment on the proposed work by writing, faxing, or e-mailing the Corps of Engineers Project
Manager listed above. Any request must be specific and substantively supportive of the
requested extension, and received by this office prior to the end of the initial comment period.
The Section Chief will review the request and the requestor will be promptly notified of the
decision to grant or deny the request. If granted, the time extension will be continuous to the
initial comment period and, inclusive of the initial comment period, will not exceed a total of 30
calendar days.
The application for this proposed project is on file with the Louisiana Department of
Environmental Quality and may be examined during weekdays between 8:00 a.m. and 4:30
p.m. Copies may be obtained upon payment of costs of reproduction.
Corps of Engineers Permit Criteria
The decision whether to issue a permit will be based on an evaluation of the probable
impacts, including cumulative impacts of the proposed activity on the public interest. That
decision will reflect the national concern for both protection and utilization of important
resources. The benefit which reasonably may be expected to accrue from the proposal must be
balanced against its reasonably foreseeable detriments. All factors which may be relevant to
the proposal will be considered including the cumulative effects thereof; among those are
conservation, economics, aesthetics, general environmental concerns, wetlands, historic
properties, fish and wildlife values, flood hazards, floodplain values, land use, navigation,
shoreline erosion and accretion, recreation, water supply and conservation, water quality,
energy needs, safety, food and fiber production, mineral needs, considerations of property
ownership and, in general, the needs and welfare of the people.
-3-
The U.S. Army Corps of Engineers is soliciting comments from the public, federal, state,
and local agencies and officials, Indian Tribes, and other interested parties in order to consider
and evaluate the impacts of this proposed activity. Any comments received will be considered
by the U.S. Army Corps of Engineers to determine whether to make, modify, condition, or deny
a permit for this proposal. To make this decision, comments are used to assess impacts on
endangered species, historic properties, water quality, general environmental effects, and other
public interest factors listed above. Comments are used in the preparation of an Environmental
Assessment and/or an Environmental Impact Statement pursuant to the National Environmental
Policy Act. Comments are also used to determine the need for a public hearing and to
determine the overall public interest of the proposed activity.
The New Orleans District is unaware of properties listed on the National Register of
Historic Places near the proposed work. The possibility exists that the proposed work may
damage or destroy presently unknown archeological, scientific, pre-historical, historical sites, or
data. Issuance of this public notice solicits input from the State Archeologist and State Historic
Preservation Officer regarding potential impacts to cultural resources.
The New Orleans District has determined that the proposed project is located within
waters known to be occupied by the endangered West Indian Manatee (Trichechus manatus)
and determined with the inclusion of the Standard Manatee Conditions for In-Water Activities
the proposed activity is not likely to adversely affect the species based on the Standard Local
Operating Procedure for Endangered Species in Louisiana (SLOPES), dated October 22, 2014,
between the U.S. Army Corps of Engineers, New Orleans and U.S. Fish and Wildlife Service,
Ecological Services Office.
This notice initiates the Essential Fish Habitat (EFH) consultation requirements of the
Magnuson-Stevens Fishery Conservation and Management Act. The applicant's proposal may
result in the destruction or alteration of 28.5 acres of EFH utilized by various life stages of red
drum and penaeid shrimp. Our initial determination is that the proposed action would not have
a substantial adverse impact on EFH or federally managed fisheries in the Gulf of Mexico. Our
final determination relative to project impacts and the need for mitigation measures is subject to
review by and coordination with the National Marine Fisheries Service.
If the proposed work involves deposits of dredged or fill material into navigable waters,
the evaluation of the probable impacts will include the application of guidelines established by
the Administrator of the Environmental Protection Agency. Also, a certification that the
proposed activity will not violate applicable water quality standards will be required from the
Department of Environmental Quality, before a permit is issued.
Any person may request, in writing, within the comment period specified in this notice,
that a public hearing be held to consider this application. Requests for public hearings shall
state, with particularity, the reasons for holding a public hearing. You are requested to
communicate the information contained in this notice to any other parties whom you deem likely
to have interest in the matter.
-4-
The applicant has certified that the proposed activity described in the application
complies with and will be conducted in a manner that is consistent with the Louisiana Coastal
Resources Program. The Department of the Army permit will not be issued unless the applicant
received approval or a waiver of the Coastal Use Permit by the Department of Natural
Resources.
JOHN M. HERMAN
Chief, Central Evaluation Section
Regulatory Branch
Enclosure
Proposed Dredge
1,500' Project Buffer
Staggered Spoil (70' x 200' with 100' Gaps)
Oyster Lease Data
_
^
Project Location: Approx. ±20 MIles West from Cocodrie, Louisiana
Four Leauge Bay South Prospect
X: 2,060,970, Y: 238,224 (NAD27) : X: 3,341,802, Y: 298,848 (NAD83)
LONG: 91° 8' 31.269" W, LAT: 29° 19' 17.819" N (NAD83)
Four Leauge Bay South SWD
X: 2,061,004, Y: 238,151 (NAD27) : X: 3,341,803, Y: 298,855 (NAD83)
LONG: 91° 8' 31.257" W, LAT: 29° 19' 17.887" N (NAD83)
_
^
_
^
0.5
NOTES
1) All Structures, Facilities, well and pipelines/flowlines shall be removed
within 120 days of abandonment of the facilities for the herein
permitted use. This condition does not preclude the necessity for revising
the current permit or obtaining a separate Coastal Use Permit, should
one be required, for such removal activities.
2) All structures will be marked and lighted in accordance with US Coast Guard regulations.
3) As-Built drawings shall be submitted within 30 days of completion
of this project to the Louisiana Department of Natural Resources,
Office of Pipeline Safety, PO Box 94275, Baton Rouge, LA 70804, and
to the Louisiana Department of Natural Resources, Office of Coastal
Management, PO Box 44487, Baton Rouge, LA 70804-4487
and to Louisiana Land and Exploration Company, P.O Box 7097,
Houma, Louisiana 70361-7097.
4) Permittee shall contact Louisiana ONE CALL at 1-800-272-3020
forty-eight hours prior to excavation or demolition.
0.25
0
0.5
1
Miles
Castex Energy, Inc.
²
Proposed Well Locations, Dredging, Rock Pad
& Structures to Drill the
Four League Bay South Prospect
SECS 6, 7, 8, 17, & 18 T20S-R13E
Terrebonne Parish, Louisiana
Rev: (date/initial)
03-04-2016/KFM
03-09-2016/KFM
Job Number: 15123
Created by: KFM
Date: 02/26/2016
PAGE 1 OF 3
NOTE: The contents of these plans are intended exclusively for the purpose of
obtaining environmental compliance permits and are not construction drawings.
± 90'
POB of Proposed Dredge
X: 3,337,507, Y: 310,842 (NAD83)
X: 91° 9' 19.58" W, Y: 29° 21' 16.62" N (NAD83)
+ 3.5'
± 90'
A
A'
± 70'
!
!
± 345'
+ 4'
_
^
_
^
+ 5.2'
± 160'
200
100
0
²
200
Feet
+ 5'
B'
!
B
!
+ 4.5'
Four Leauge Bay South Prospect
X: 2,060,970, Y: 238,224 (NAD27) : X: 3,341,802, Y: 298,848 (NAD83)
LONG: 91° 8' 31.269" W, LAT: 29° 19' 17.819" N (NAD83)
Four Leauge Bay South SWD
X: 2,061,004, Y: 238,151 (NAD27) : X: 3,341,803, Y: 298,855 (NAD83)
LONG: 91° 8' 31.257" W, LAT: 29° 19' 17.887" N (NAD83)
+ 4.2'
C'
!
POE of Proposed Dredge
X: 3,341,788, Y: 298,747(NAD83)
X: 91° 8' 31.428" W, Y: 29° 19' 16.817" N(NAD83)
1,500
750
0
C
_
^
1,500
Feet
!
3,000
Proposed Dredge (Dredge Length = ± 13,310')
²
Staggered Spoil (70' x 200' with 100' Gaps)
Water depth obtained from T. Baker Smith
Water Depth survey dated 12-01-2015
(Adjusted to 0.0' MLLWL)
Castex Energy, Inc.
Proposed Well Locations, Dredging, Rock Pad
& Structures to Drill the
Four League Bay South Prospect
SECS 6, 7, 8, 17, & 18 T20S-R13E
Terrebonne Parish, Louisiana
Rev: (date/initial)
Job Number: 15123
Created by: KFM
Date: 02/26/2016
03-04-2016/KFM
03-09-2016/KFM PAGE 2 OF 3
NOTE: The contents of these plans are intended exclusively for the purpose of
obtaining environmental compliance permits and are not construction drawings.
No Scale
No Scale
Proposed Spoil Markers
To Be Placed every ±300'
Î
Î
Î ÎÎÎ
Î
ÎÎÎ
Î
Î
Î
Î
Î
Î
Î
Î
Î
Î
Î
Î
Î
Î
Î
±3.5'
Î Î
ÎÎ
Î
Î
Î
Î
Î
Î
Î
Î
Î
Î
ÎÎ ÎÎ ÎÎ
Î
±8'
±4.5'
±70'
Proposed Spoil
(70' Wide x 200' Length x 5' High)
±8'
±70'
Proposed Rock Pad
( 70' W x 250' L x 1'D )
±70'
±4.2'
±8'
±70'
Proposed Spoil Markers
To Be Placed every ±300'
ÎÎ
Î
ÎÎÎÎ
Î
ÎÎ
Î
Î
Î
Î
Î
±5.0' Î
ÎÎÎÎ
Î
ÎÎ Î Î
Top of Water = MLWL
±3'
±5'
Top of Water = MLWL
B'
Proposed Spoil
ÎÎÎÎ
Î ÎÎÎ
Î
ÎÎÎÎÎ
Î
ÎÎ
ÎÎÎ
ÎÎ
±15'
Proposed Spoil
No Scale
±15'
Proposed Spoil
(70' Wide x 200' Length x 5' High)
Proposed Spoil Markers
To Be Placed every ±300'
Cross Section B - B'
MHWL: +3.00'
MLWL: +1.25'
MHWL: +3.00'
MLWL: +1.25'
Top of Water = MLWL
±160'
Typical Well Structure
Plan View
Proposed Spoil
(70' Wide x 200' Length x 5' High)
Typical Well Structure
Profile View
No Scale
No Scale
Navigation
Light
Typical Drill Barge
Not to Scale
Plan View
Navigation Light
±54'
SWD Well
±7'
Thirteen (13) temporary five (5) pile clusters to be driven to assist in removing drill barge
from location. Temporary clusters to be removed when permanent well guard in installed.
7.5' Draft
Proposed Rock Pad
( 70' W x 250' L x 1'D )
Well
Casing
Well
Casing
±7'
Proposed
PIlings
Mudline
±20'
Elevation View
SWD
Well
Well
Varies
Well
±209'
Proposed Rock Pad
( 70' W x 250' L x 1'D )
±8'
Proposed Spoil
(70' Wide x 200' Length x 5' High)
C'
C
A'
±15'
±7'
ÎÎ Î
Î
Î
Î
ÎÎ
Î
Î
ÎÎÎÎ
ÎÎ
Î
Î
Î
Î
ÎÎ
Î
Î
Varies
A
B
Cross Section C - C'
Cross Section A - A'
MHWL: +3.00'
MLWL: +1.25'
Project Impact Summary
Excavation (Native Water Bottoms)
±22.2 Acres of Proposed Bucket Dredging
±121,450' Cubic Yards of Proposed Bucket Dredging
Fill
±28.5 Acres of Proposed Bucket Dredge Fill
±121,450' Cubic Yards of Native Material
±648 Cubic Yards of Rock
Castex Energy, Inc.
Proposed Well Locations, Dredging, Rock Pad
& Structures to Drill the
Four League Bay South Prospect
SECS 6, 7, 8, 17, & 18 T20S-R13E
Terrebonne Parish, Louisiana
Job Number: 15123
Rev: (date/initial) Created by: KFM
03-04-2016/KFM Date: 02/26/2016
03-09-2016/KFM
PAGE 3 OF 3
NOTE: The contents of these plans are intended exclusively for the purpose of
obtaining environmental compliance permits and are not construction drawings.