You can copy from here when filling out the rest of the page.
DREDGE AN ACCESS CHANNEL AND WELL SLIP
IN LAKE MECHANT, TERREBONNE PARISH
NAME
OF APPLICANT: CASTEX ENERGY, c/o
Blue Ox Environmental, 2851 Johnston Street, Suite 1803, Lafayette,
Louisiana 70503
LOCATION
OF WORK:
Lake Mechant, approximately 20 miles
west from Cocodrie, Louisiana, (29.290569, -90.995972), in Sections 22, 26, 27
and 35, Township 20 South, Range 14 East, in Terrebonne
Parish, as shown on the enclosed drawings, within Hydrologic Unit Code 08090302,
West Central Louisiana Coastal.
CHARACTER
OF WORK: The applicant has requested Department of the
Army authorization to bucket dredge an access channel in order to place a
drilling barge on location and install and maintain a rock pad, two well head
protectors and appurtenant structures, all to drill and produce the King Lake Prospect
and King Lake SWD Wells. The access channel
length is 16,225-ft long x 70-ft wide. Approximately
190,494 cubic yards of water bottoms will be excavated and the staggered spoil
will be placed 70-ft wide x 200-ft long x 5-ft height with 100-ft gaps along
the access route. Spoil markers will be
installed every 300 feet. A 70-ft wide x 250-ft long x 1-ft deep rock pad will
be installed at the well site. The
entire site is located in open waters and no adverse impacts to wetlands will
be affected by this project.
JOINT PUBLIC NOTICE
April 4, 2016
United States Army
Corps of Engineers
New Orleans District
Attn: Regulatory Branch
Post Office Box 60267
New Orleans, Louisiana 70160-0267
State of Louisiana
Department of Environmental Quality
Attn: Water Quality Certification Sec.
Post Office Box 4313
Baton Rouge, Louisiana 70821-4313
Project Manager: Dirreen Arnold
(504) 862-2301 / fax: (504) 862-2574
dirreen.s.arnold@usace.army.mil
Permit Application Number:
MVN-2016-00438-CA
Project Manager:
Elizabeth Hill
(225) 219-3225 / fax: (225) 219-3156
WQC Application Number:
WQC-160329-01
Interested parties are hereby notified that a permit application has been received by the
New Orleans District of the US Army Corps of Engineers pursuant to: [X] Section 10 of the
Rivers and Harbors Act of March 3, 1899 (30 Stat. 1151; 33 USC 403); and/or [X] Section 404
of the Clean Water Act (86 Stat. 816; 33 USC 1344).
Application has also been made to the Louisiana Department of Environmental Quality,
Office of Environmental Services, for a Water Quality Certification (WQC) in accordance with
statutory authority contained in LRS 30:2074 A(3) and provisions of Section 401 of the Clean
Water Act.
DREDGE AN ACCESS CHANNEL AND WELL SLIP
IN LAKE MECHANT, TERREBONNE PARISH
NAME OF APPLICANT: CASTEX ENERGY, c/o Blue Ox Environmental, 2851 Johnston
Street, Suite 1803, Lafayette, Louisiana 70503
LOCATION OF WORK: Lake Mechant, approximately 20 miles west from Cocodrie, Louisiana,
(29.290569, -90.995972), in Sections 22, 26, 27 and 35, Township 20 South, Range 14 East,
in Terrebonne Parish, as shown on the enclosed drawings, within Hydrologic Unit Code
08090302, West Central Louisiana Coastal.
CHARACTER OF WORK: The applicant has requested Department of the Army authorization
to bucket dredge an access channel in order to place a drilling barge on location and install and
maintain a rock pad, two well head protectors and appurtenant structures, all to drill and
produce the King Lake Prospect and King Lake SWD Wells. The access channel length is
16,225-ft long x 70-ft wide. Approximately 190,494 cubic yards of water bottoms will be
excavated and the staggered spoil will be placed 70-ft wide x 200-ft long x 5-ft height with 100-ft
gaps along the access route. Spoil markers will be installed every 300 feet. A 70-ft wide x 250-ft
long x 1-ft deep rock pad will be installed at the well site. The entire site is located in open
waters and no adverse impacts to wetlands will be affected by this project.
-2-
It is presumed that the applicant has designed the project to avoid and minimize direct
and secondary adverse impacts to the maximum extent practicable.
The comment period for the Department of the Army Permit and the Louisiana
Department of Environmental Quality WQC will close 20 days from the date of this joint public
notice. Written comments, including suggestions for modifications or objections to the
proposed work, stating reasons thereof, are being solicited from anyone having interest in this
permit and/or this WQC request and must be submitted so as to be received before or by the
last day of the comment period. Letters concerning the Corps of Engineers permit application
must reference the applicant's name and the Permit Application Number, and be forwarded to
the Corps of Engineers at the address above, ATTENTION: REGULATORY BRANCH. Similar
letters concerning the Water Quality Certification must reference the applicant's name and the
WQC application number and be mailed to the Louisiana Department of Environmental Quality
at the address above. Individuals or parties may request an extension of time in which to
comment on the proposed work by writing, faxing, or e-mailing the Corps of Engineers Project
Manager listed above. Any request must be specific and substantively supportive of the
requested extension, and received by this office prior to the end of the initial comment period.
The Section Chief will review the request and the requestor will be promptly notified of the
decision to grant or deny the request. If granted, the time extension will be continuous to the
initial comment period and, inclusive of the initial comment period, will not exceed a total of 30
calendar days.
The application for this proposed project is on file with the Louisiana Department of
Environmental Quality and may be examined during weekdays between 8:00 a.m. and 4:30
p.m. Copies may be obtained upon payment of costs of reproduction.
Corps of Engineers Permit Criteria
The decision whether to issue a permit will be based on an evaluation of the probable
impacts, including cumulative impacts of the proposed activity on the public interest. That
decision will reflect the national concern for both protection and utilization of important
resources. The benefit which reasonably may be expected to accrue from the proposal must be
balanced against its reasonably foreseeable detriments. All factors which may be relevant to
the proposal will be considered including the cumulative effects thereof; among those are
conservation, economics, aesthetics, general environmental concerns, wetlands, historic
properties, fish and wildlife values, flood hazards, floodplain values, land use, navigation,
shoreline erosion and accretion, recreation, water supply and conservation, water quality,
energy needs, safety, food and fiber production, mineral needs, considerations of property
ownership and, in general, the needs and welfare of the people.
-3-
The U.S. Army Corps of Engineers is soliciting comments from the public, federal, state,
and local agencies and officials, Indian Tribes, and other interested parties in order to consider
and evaluate the impacts of this proposed activity. Any comments received will be considered
by the U.S. Army Corps of Engineers to determine whether to make, modify, condition, or deny
a permit for this proposal. To make this decision, comments are used to assess impacts on
endangered species, historic properties, water quality, general environmental effects, and other
public interest factors listed above. Comments are used in the preparation of an Environmental
Assessment and/or an Environmental Impact Statement pursuant to the National Environmental
Policy Act. Comments are also used to determine the need for a public hearing and to
determine the overall public interest of the proposed activity.
The New Orleans District is unaware of properties listed on the National Register of
Historic Places near the proposed work. The possibility exists that the proposed work may
damage or destroy presently unknown archeological, scientific, pre-historical, historical sites, or
data. Issuance of this public notice solicits input from the State Archeologist and State Historic
Preservation Officer regarding potential impacts to cultural resources.
The New Orleans District has determined that the proposed project is located within
waters known to be occupied by the endangered West Indian Manatee (Trichechus manatus)
and determined with the inclusion of the Standard Manatee Conditions for In-Water Activities
the proposed activity is not likely to adversely affect the species based on the Standard Local
Operating Procedure for Endangered Species in Louisiana (SLOPES), dated October 22, 2014,
between the U.S. Army Corps of Engineers, New Orleans and U.S. Fish and Wildlife Service,
Ecological Services Office.
This notice initiates the Essential Fish Habitat (EFH) consultation requirements of the
Magnuson-Stevens Fishery Conservation and Management Act. The applicant's proposal may
result in the destruction or alteration of 34.54 acres of EFH utilized by various life stages of red
drum and penaeid shrimp. Our initial determination is that the proposed action would not have
a substantial adverse impact on EFH or federally managed fisheries in the Gulf of Mexico. Our
final determination relative to project impacts and the need for mitigation measures is subject to
review by and coordination with the National Marine Fisheries Service.
If the proposed work involves deposits of dredged or fill material into navigable waters,
the evaluation of the probable impacts will include the application of guidelines established by
the Administrator of the Environmental Protection Agency. Also, a certification that the
proposed activity will not violate applicable water quality standards will be required from the
Department of Environmental Quality, before a permit is issued.
Any person may request, in writing, within the comment period specified in this notice,
that a public hearing be held to consider this application. Requests for public hearings shall
state, with particularity, the reasons for holding a public hearing. You are requested to
communicate the information contained in this notice to any other parties whom you deem likely
to have interest in the matter.
-4-
The applicant has certified that the proposed activity described in the application
complies with and will be conducted in a manner that is consistent with the Louisiana Coastal
Resources Program. The Department of the Army permit will not be issued unless the applicant
received approval or a waiver of the Coastal Use Permit by the Department of Natural
Resources.
JOHN M. HERMAN
Chief, Central Evaluation Section
Regulatory Branch
Enclosure
Proposed Dredge
1,500' Project Buffer
Staggered Spoil (70' x 200' with 100' gaps)
Spoil Beneficial Use Area
_
^
Oyster Lease Data
_
^
Project Location: King Lake Prospect
Approx. ±20 Miles West of Cocodrie, Louisiana
X: 3,388,588, Y: 287,624 (NAD83)
LONG: 90° 59' 43.13" W, LAT: 29° 17' 25.63" N (NAD83)
0.75
NOTES
1) All Structures, Facilities, well and pipelines/flowlines shall be removed
within 120 days of abandonment of the facilities for the herein
permitted use. This condition does not preclude the necessity for revising
the current permit or obtaining a separate Coastal Use Permit, should
one be required, for such removal activities.
2) All structures will be marked and lighted in accordance with US Coast Guard regulations.
3) As-Built drawings shall be submitted within 30 days of completion
of this project to the Louisiana Department of Natural Resources,
Office of Pipeline Safety, PO Box 94275, Baton Rouge, LA 70804, and
to the Louisiana Department of Natural Resources, Office of Coastal
Management, PO Box 44487, Baton Rouge, LA 70804-4487
and to Louisiana Land and Exploration Company, P.O Box 7097,
Houma, Louisiana 70361-7097.
4) Permittee shall contact Louisiana ONE CALL at 1-800-272-3020
forty-eight hours prior to excavation or demolition.
0.375
0
0.75
1.5
Miles
²
Castex Energy, Inc.
Proposed Well Location, Dredging, Rock Pad
& Structures to Drill the King Lake Prospect
SECS 22, 26 27, & 35 T20S-R14E
Terrebonne Parish, Louisiana
Rev: (date/initial)
03-08-2016/KFM
Job Number: 16005
Created by: KFM
Date: 02/26/2016
PAGE 1 OF 5
NOTE: The contents of these plans are intended exclusively for the purpose of
obtaining environmental compliance permits and are not construction drawings.
+ 10'
+ 8'
+ 6.5'
A
!
+ 5.5'
+ 5'
2972304
+ 13'
+ 13.5'
+ 5.5'
+ 5'
2932903
+ 5'
1,000
0
Feet
²
1,000
3022204
PAGE 2 OF 5
Rev: (date/initial) Created by: KFM
03-08-2016/KFM Date: 02/24/2016
SECS 22, 26 27, & 35 T20S-R14E
Terrebonne Parish, Louisiana
Proposed Well Location, Dredging, Rock Pad
& Structures to Drill the King Lake Prospect
Castex Energy, Inc.
500
POB of Proposed Dredge (± 3,872')
X: 3,384,502, Y: 305,538(NAD83)
X: 91° 0' 28.701" W, Y: 29° 20' 23.093" N(NAD83)
+ 6.5'
A'
!
+ 6.5'
B'
!
B
+ 6.5'
!
POE of Proposed Dredge
X: 3,386,244, Y: 302,091(NAD83)
X: 91° 0' 9.127" W, Y: 29° 19' 48.914" N(NAD83)
+ 6.5'
+ 7.5'
POB of Proposed Dredge ( ± 1,878' )
X: 3,385,743, Y: 299,764(NAD83)
X: 91° 0' 14.871" W, Y: 29° 19' 25.898" N(NAD83)
POE of Proposed Dredge
X: 3,384,537, Y: 298,338(NAD83)
X: 91° 0' 28.538" W, Y: 29° 19' 11.813" N(NAD83)
Proposed Beneficial Use Spoil Placement
Proposed Dredge (Dredge Length = ± 5,750')
Staggered Spoil (70' x 200' with 100' gaps)
Oyster Lease Data
Job Number: 16005
NOTE: The contents of these plans are intended exclusively for the purpose of
obtaining environmental compliance permits and are not construction drawings.
200
POB of Proposed Dredge
X: 3,380,846, Y: 293,397(NAD83)
X: 91° 1' 10.387" W, Y: 29° 18' 23.005" N(NAD83)
100
0
Feet
70'
Proposed Rock Pad
( 70' W x 250' L x 1'D )
+ 3'
!
! !
!
200
²
D
!
Spoil Beneficial
Use Area
E
!
F
!
E'
Spoil Beneficial
Use Area
!
F'
King Lake Prospect
+ 2'
!
G
Spoil Beneficial
Use Area
Spoil Beneficial
Use Area
!
+ 2.5'
G'
!
H
+ 2'
POE of Proposed Dredge
X: 3,388,474, Y: 287,634(NAD83)
LONG: 90° 59' 44.421" W, LAT: 29° 17' 25.740" N(NAD83)
_
^
!
Project Location: Approx. ±20 Miles West of Cocodrie, Louisiana
King Lake Prospect
X: 2,107,578, Y: 226,962 (NAD27) : X: 3,388,378, Y: 287,666 (NAD83)
LONG: 90° 59' 45.508" W, LAT: 29° 17' 26.054" N (NAD83)
King Lake SWD Well
X: 2,107,571, Y: 226,965 (NAD27) : X: 3,388,371, Y: 287,669 (NAD83)
LONG: 90° 59' 45.579" W, LAT: 29° 17' 26.084" N (NAD83)
1,500
750
Spoil Beneficial Use Area
Proposed Dredge (Dredge Length = ± 10,475')
Staggered Spoil (70' x 200' with 100' gaps)
H'
0
1,500
Feet
3,000
²
Castex Energy, Inc.
Proposed Well Locations, Dredging, Rock Pad
& Structures to Drill the King Lake Prospect
SECS 22, 26, 27, & 35 T20S-R14E
Terrebonne Parish, Louisiana
Rev: (date/initial)
Oyster Lease Data
Water depth obtained from T. Baker Smith
Water Depth survey conducted 02-03-2015.
160
'
335
'
+ 2.5'
Spoil Beneficial
Use Area
_
^
_
^
_
^
King Lake SWD Well
D'
70'
C'
30'
C
03-08-2016/KFM
Job Number: 16005
Created by: KFM
Date: 02/26/2016
PAGE 3 OF 5
NOTE: The contents of these plans are intended exclusively for the purpose of
obtaining environmental compliance permits and are not construction drawings.
MHWL: +3.00'
MLWL: +1.25'
MHWL: +3.00'
MLWL: +1.25'
Cross Section A - A'
No Scale
Cross Section B - B'
No Scale
Proposed Spoil Markers
To be placed every 300'
A
A'
±15'
Top of Water = MLWL
±5.5'
±8'
±2.5'
ÎÎ
ÎÎ
ÎÎ
Î
ÎÎ
Î
Î
ÎÎ
Î
Î
Î ÎÎ
B
±6.5'
±8'
±1.5'
Proposed Spoil
(70' Wide x 200' Length x 5' High)
No Scale
C
Proposed Spoil
(70' Wide x 200' Length x 5' High)
±3'
±5'
Proposed Spoil Markers
To be placed every 300'
C'
±15'
Top of Water = MLWL
D'
D
Proposed Spoil Markers
To be placed every 300'
±8'
Î
Î
Î ÎÎ
ÎÎ
ÎÎÎÎ
Î
ÎÎ Î
E
Existing
Marsh
MHWL: +3.00'
MLWL: +1.25'
±8'
±5.5'
Existing
Marsh
Proposed Spoil
Benefical Use Area
±70'
MHWL: +3.00'
MLWL: +1.25'
No Scale
E'
Proposed Spoil Markers
To be placed every 300'
±100'
Cross Section F - F'
No Scale
±5'
Î Î
ÎÎ Î
Î
Î
Î
Î
Î
Î
±2.5'
ÎÎ
Î
Î
Î
Î
Î
Î
Î Î
Î
Î
Î
Top of Water = MLWL
Proposed Spoil
(70' Wide x 200' Length x 5' High)
Cross Section E - E'
F'
F
Proposed Spoil Markers
To be placed every 300'
±15'
±15'
ÎÎ
Î
Î
Î
Î
ÎÎ
ÎÎ
Î
Î
Î
Î
ÎÎ
Î
Î
ÎÎÎ Î Î
±130'
Top of Water = MWLW
±8'
±2.5'
±5.5'
±70'
±5'
±15'
±70'
Proposed Spoil
Benefical Use Area
ÎÎ
ÎÎ
Î
Î ÎÎÎ
Î
ÎÎ
Î ÎÎÎÎÎ
Cross Section D - D'
No Scale
Î
Î
ÎÎ
ÎÎ
ÎÎÎ
ÎÎ
Î
Î
Î Î
ÎÎ
B'
Proposed Beneficial
Use Spoil Placement
±70'
MHWL: +3.00'
MLWL: +1.25'
Cross Section C - C'
±5'
±10'
Top of Water = MLWL
±70'
MHWL: +3.00'
MLWL: +1.25'
Proposed Spoil Markers
To be placed every 300'
Top of Water = MLWL
±8'
±2'
±6'
±5'
Î ÎÎ ÎÎ
Î
Î
Î
Î
Î
Î
Î
Î
ÎÎ
Î
Î ÎÎ
Î
Î
ÎÎ
ÎÎ
Existing
Marsh
Proposed Spoil
Benefical Use Area
±70'
±135'
Castex Energy, Inc.
Proposed Well Location, Dredging, Rock Pad
& Structures to Drill the King Lake Prospect
SECS 22, 26 27, & 35 T20S-R14E
Terrebonne Parish, Louisiana
Rev: (date/initial)
03-08-2016/KFM
Job Number: 16005
Created by: KFM
Date: 02/26/2016
PAGE 4 OF 5
NOTE: The contents of these plans are intended exclusively for the purpose of
obtaining environmental compliance permits and are not construction drawings.
Cross Section H - H'
Proposed Spoil
Benefical Use Area
G
MHWL: +3.00'
MLWL: +1.25'
No Scale
G'
Proposed Spoil Markers
To be placed every 300'
±5'
Existing
Marsh
No Scale
Cross Section G - G'
Î ÎÎ
Î
Î
Î
Î
Î
Î
Î
Î
ÎÎ
Î Î
Î ÎÎÎ
±100'
H'
H
±15'
MHWL: +3.00'
MLWL: +1.25'
±8'
±2.5'
±5.5'
Proposed Spoil
Beneficial Use Area
Proposed Spoil Marker
To be placed every 300'
±5'
±70'
±15'
±5'
±2'
±8'
±70'
±115'
±160'
Proposed Rock Pad
( 70' W x 250' L x 1'D )
Typical Drill Barge
Typical Well Structure
Profile View
No Scale
No Scale
Not to Scale
Plan View
Navigation
Light
±54'
SWD
Well
Well
±7'
Varies
Well
Varies
Navigation Light
SWD Well
±7'
Well
Casing
Well
Casing
±7'
Proposed
PIlings
±8'
Proposed Rock Pad
( 70' W x 250' L x 1'D )
Typical Well Structure
Plan View
Thirteen (13) temporary five (5) pile clusters to be driven to assist in removing drill barge
from location. Temporary clusters to be removed when permanent well guard in installed.
Mudline
±20'
Elevation View
Castex Energy, Inc.
7.5' Draft
±209'
Project Impact Summary
Excavation (Native Water Bottoms)
±27.04 Acres of Proposed Bucket Dredging
±190,494 Cubic Yards of Proposed Bucket Dredging
Fill
±34.54 Acres of Proposed Bucket Dredge Fill
±190,494 Cubic Yards of Native Material Fill
±648 Cubic Yards of Rock
Proposed Well Location, Dredging, Rock Pad
& Structures to Drill the King Lake Prospect
SECS 22, 26 27, & 35 T20S-R14E
Terrebonne Parish, Louisiana
Rev: (date/initial)
03-08-2016/KFM
Proposed Rock Pad
( 70' W x 250' L x 1'D )
Job Number: 16005
Created by: KFM
Date: 02/26/2016
PAGE 5 OF 5
NOTE: The contents of these plans are intended exclusively for the purpose of
obtaining environmental compliance permits and are not construction drawings.