FACILITY EXPANSION AND DREDGING OF DOCKS ON MISSISSIPPI RIVER IN ST. JAMES PARISH
NAME OF APPLICANT:
NuStar Energy, LP, c/o CK Associates, 17170 Perkins Road, Baton Rouge,
Louisiana, 70810.
LOCATION OF WORK:
In the Mississippi River, Right Descending Bank, River Mile 160, at 7167
Koch Road in Saint James, Louisiana, in St. James Parish, within the
Mississippi River Basin in hydrologic unit (HUC 08070100), as shown on the
attached drawings.
CHARACTER OF WORK:
The applicant has requested Department of the Army authorization to improve
and expand the existing NuStar Facility and dock terminals. The facility expansion will include the
installation of rail spur enhancements including new tracks and rail loading
stations, the expansion of existing borrow pits and the construction of a truck
loading rack as well as installation of a new laydown yard,
subsurface foam lines and fire water lines, new MDVU with pile supported
foundation and air compressor skid, pumps and associated foundations, meter
skid, prover, truck loading rack and additional rail car loading racks. The dock terminal expansion will include new
pipelines, structural improvements, a temporary ramp and new loading arms as
well as an expansion of the existing dock platforms for Docks 1 and 5 in
addition to maintenance dredging at Docks 1, 2 and 5. Approximately
70 cubic yards of concrete, 1,022 cubic yards of stone and gravel and 1,022
cubic yards of hauled topsoil would be hauled in and deposited in a 3.32 acre
area to construct the facility improvements.
Approximately 60 cubic yards of crushed limestone and 3,500 cubic yards
of clay will be used to construct the temporary ramp and will be removed after
construction. Additionally,
approximately 3,401 cubic yards will be excavated and placed onsite within a
six (6) acre area for pipeline placement, borrow pit expansion and the
placement of a culvert. Proposed
dredging around existing Docks 1, 2 and 5 will include the annual removal of
approximately 600,000 cubic yards from a 27.81 acre area of open water and
deposited in the lower Mississippi River Channel below the -55.0 contour. The proposed project is situated on an
approximately 887-acre tract and would impact approximately 0.04 acres of waters
of the US and 27.81 acres of traditionally navigable waters. A preliminary analysis has determined
wetlands to be present at the project site; however, extent of coverage and
impacts is undetermined at this time pending a wetland delineation.