Application for Permit San Elijo Lagoon Double Track
The San Elijo Lagoon Double Track project
consists of constructing an additional 1.5 miles of a second main track (double
tracking) adjacent to an existing track, replacing the existing timber Bridge
240.4 with a new concrete double track bridge, and widening and raising the
railroad berm through San Elijo Lagoon to provide 100-year storm protection.