The following application has been submitted for a Department of the Army (DA) Permit under the provisions of Section 404 of the Clean Water Act. This notice serves as the United States Army Corps of Engineers’ Corps) request to the Ohio Environmental Protection Agency (OEPA) to act on the Section 401 Water Quality Certification for the following application.
TO WHOM
IT MAY CONCERN: The following application has been submitted for a
Department of the Army (DA) Permit under the provisions of Section 404 of the
Clean Water Act. This notice serves as
the United States Army Corps of Engineers’ (Corps) request to the Ohio
Environmental Protection Agency (OEPA) to act on the Section 401 Water Quality
Certification for the following application.
APPLICANT: Mr. Benjamin Chrin
Industrial
Developments International (IDI), LLC
740
Centre View Boulevard
Crestview
Hills, Kentucky 41017
LOCATION: As depicted on the attached Figure 1: Enlarged Section of the U.S.G.S. Monroe,
Ohio 7.5 minute topographical quadrangle map (Sheet 1 of 7), the proposed
project would be located within the watershed of Millers Creek (Latitude
39.42999, Longitude -84.33383), on the west
end of the existing Gateway Boulevard, in Monroe, Warren County, Ohio. The project corridor is located between Ohio Highway
63/Hamilton-Lebanon Road (east end) and Butler-Warren Road (west end - see attached
Figure 2: Project Corridor [Sheet 2
of 7]).
The
proposed discharges of dredged and/or fill material would take place within one
wetland and one perennial stream, Millers Creek. Millers Creek is a tributary to the Great
Miami River, a traditional navigable water of the United States.
DESCRIPTION OF PROPOSED WORK: The applicant has requested a DA authorization
to discharge dredged and/or fill material into approximately 1.11 acres of
wetland and 121 linear feet (0.022 acre) of Millers Creek in
association with the extension of the Gateway Boulevard Commercial Development project
(see attached Figure 3: Master Plan MP-1
[Sheet 3 of 7] and Figure 4: Park North
Master Concept, Monroe, Ohio, Sheet C1.01 [Sheet 4 of 7]). The proposed project would consist of the
installation of one 32 foot wide cast-in-place bottomless culvert in a section
of Millers Creek and the grading of a section of a wetland in order to extend
the existing Gateway Boulevard roadway to the west in order to provide access
to the commercial development from Butler Warren Road. Gateway Boulevard currently provides access
to the commercial development from Ohio Highway 63/Hamilton-Lebanon Road. In addition, the proposal would involve the
temporary discharge of dredged and/or fill material into
Millers
Creek in order to construct a temporary equipment crossing and to divert stream
flow to install the culvert. The design plans (see attached Figure 5: Design Plan for Gateway Boulevard
Extension Project [Sheet 5 of 7] and Figure
6: Cross Section [Sheet 6 of 7]) for the proposed project are attached to
this notice.
ALTERNATIVES ANALYSIS: A total of approximately 1.11
acres of one wetland (Wetland
1) and 121
linear feet of stream channel along the right descending bank of Millers Creek would
be filled as a result of the proposal. The project does not require access or proximity to, or
sitting within, the wetland to fulfill its basic purpose and is considered a
non-water dependent activity. The
Section 404(b)(1) Guidelines state for non-water dependent activities,
practicable alternatives that do not involve wetlands are presumed to be
available, unless clearly demonstrated otherwise. The applicant is required to provide an
alternatives analysis that must overcome this presumption prior to receiving
authorization for the discharge of dredge and/or fill material. The applicant has submitted an alternatives
analysis and it is currently under review.
A complete copy of the applicant’s alternatives analysis can be reviewed
by appointment at the above address. No
permit will be issued until our office determines practicable upland
alternatives are not available to achieve the overall project purpose based
upon the applicant’s alternative analysis.
AVOIDANCE
AND MINIMIZATION: In evaluating
a project area containing waters of the United States, consideration must be
given to avoiding impacts on these sites.
If waters of the United States cannot be avoided, then the impacts must
be minimized. Approximately 4.3 acres of
wetland and 350 linear feet (0.03 acre) of perennial stream are located within
the proposed project area. Avoidance and
minimization efforts were incorporated into the proposal to reduce the
footprint of the proposed project. The
applicant’s project would avoid 3.2 acres of wetland and 229 linear feet of
stream on-site. The applicant proposes
to install a bottomless culvert in order to minimize impacts to the stream
channel along 121 linear feet of Millers Creek. The path of Millers Creek is
such that the bottomless culvert would impact a small portion (970 square feet)
of the stream channel along the right descending bank of Millers Creek. Stormwater
management planning would incorporate best management practices and water
pollution controls necessary to maintain compliance with the Federal Water
Pollution Control Act and Ohio Water Pollution Control Act. Construction activities would be performed during
low flow conditions. Stormwater
management and erosion control systems would be implemented during
construction, including silt fences, mulch and/or earthen berms, temporary
seeding, hay bales, inlet protection, temporary collection basins, diversion
ditches, and construction entrances. All
disturbed areas would be seeded and/or revegetated with native plant species
and native seed mixes after completion of construction activities.
COMPENSATORY
MITIGATION PLAN: To compensate
for the losses of waters of the United States associated with the proposed project,
the applicant proposes to preserve and enhance the remaining 3.2 acres of
Wetland 1 onsite and create an additional 0.5 acre of wetland to the west of
the remaining 3.2 acres of Wetland 1 (see attached Figure 7 [Sheet 7 of 7]). The applicant proposes to mitigate for
the loss of stream channel with the creation of 0.025 acre of new stream channel along the
proposed bottomless culvert in order to allow the stream channel to flow straight through the culvert
and prevent future damage of the structure.
In addition, the applicant proposes to remove an old road crossing
located in Millers Creek, approximately 175 upstream of the proposed bottomless
culvert, and restore the area.
WATER QUALITY CERTIFICATION: A Section
401 Water Quality Certification may be required for this project. It is the applicant’s responsibility to
obtain a certification from the OEPA.
HISTORIC AND CULTURAL RESOURCES: The National Register of Historic
Places (NRHP) has been consulted and it has been determined there are no
properties currently listed on the NRHP that would be indirectly or directly
affected by the proposed work. The majority
of the project area has been used historically as agricultural land and for
commercial development. The Corps has
determined the proposed project would have no effect
on historic properties eligible or potentially eligible for inclusion on the
NRHP. A copy of this public
notice will be furnished to Ohio State Historic Preservation Office for their
review. Comments concerning
archaeological sensitivity of the project area should be based on collected
data.
THREATENED AND ENDANGERED SPECIES: The
proposed project is located within the known or historic range of the following
federally-protected species: endangered Indiana bat (Myotis sodalis), threatened northern long-eared bat (Myotis septentrionalis), endangered rayed
bean mussel (Villosa fabailis), the
potentially threatened eastern massasauga (Sistrurus
catenatus) and endangered running buffalo clover (Trifolium stoloniferum). The Corps has consulted the most recently
available information, including correspondence between the United States Fish
and Wildlife Service and Otte Enterprises dated March 29, 2016, and based on
the proposed implementation of the seasonal tree clearing restrictions, the
project may affect, but is not likely to adversely affect either the Indiana
bat (Myotis sodalis) or the northern
long-eared bat (Myotis septentrionalis). The
proposed project may affect, but would not likely adversely affect the rayed
bean mussel based on the project location, the lack of suitable habitat in the
project area, and the applicant’s proposal to perform construction activities
during low flow conditions and to use best management practices during
construction activities to reduce impacts to downstream resources. The proposed
project may affect, but is not likely to adversely affect the Eastern massasauga based on the
potential for suitable habitat in the project corridor although no individual
species were observed onsite. It has
been determined the proposed project would have no effect on the running
buffalo clover. Based on
this information, the project is not likely to adversely affect the continued
existence of any endangered species or threatened species, or result in the
destruction or adverse modification of habitat of such species which has been
determined to be critical. This Public
Notice serves as a request for concurrence from the United States Fish and
Wildlife Service with the aforementioned effect determinations and for any
additional information they may have on whether any listed or proposed to be
listed endangered or threatened species may be present in the area which would
be affected by the activity, pursuant to Section 7(c) of the Endangered Species
Act of 1972 (as amended).
PUBLIC INTEREST REVIEW AND CUMULATIVE
EFFECTS: This application will be reviewed in
accordance with 33 CFR 320‑332, the Regulatory Program of the Corps, and other
pertinent laws, regulations, and executive orders. Our evaluation will also follow the
guidelines published by the United States Environmental Protection Agency
pursuant to Section 404(b)(1)
of the Clean
Water Act (40 CFR part 230). The
decision whether to issue a permit will be based
on an
evaluation of the probable impacts, including cumulative impacts, of the
proposed activity on the public interest.
That decision will reflect the national concern for both the protection
and the utilization of important resources.
The benefit that reasonably may be expected to accrue from the proposal
must be balanced against its reasonably foreseeable detriments. All factors
that may be
relevant to the proposal will be considered, including the cumulative effects
thereof;
among those factors
are conservation, economics, aesthetics, general environmental concerns,
wetlands, historic properties, fish and
wildlife values, flood hazards, floodplain values, land use,
navigation, shoreline
erosion and accretion, recreation, water supply and conservation, water
quality, energy needs, safety, food and fiber production, mineral needs,
considerations of
property ownership and, in
general, the needs and welfare of the people.
SOLICITATION
OF COMMENTS: The Corps
is soliciting comments from the public, the Federal, state, and local agencies
and officials, the Indian Tribes, and other interested parties in order to
consider and evaluate the impacts of this proposed activity. For accuracy and completeness of the
administrative record, all data in support of or in opposition to the proposed
work should be submitted in writing setting forth sufficient detail to furnish
a clear understanding of the reasons for support or opposition. Any person
may request, in writing, within the comment period specified in the notice,
that a public hearing be held to consider the application. Requests for public hearings shall state,
with particularity, the reasons for holding a public hearing. Any comments received will be
considered by the Corps to determine whether to issue, modify, condition or
deny a permit for this proposal. To make
this decision, comments are used to assess impacts on endangered species,
historic properties, water quality, general environmental effects, and the
other public interest factors listed above.
Comments are used in the preparation of an Environmental Assessment
and/or an Environmental Impact Statement pursuant to the National Environmental
Policy Act. Comments are also used to
determine the need for a public hearing and to determine the overall public
interest of the proposed activity.
Written statements received in this office on or before the expiration
date of this Public Notice will become a part of the record and will be
considered in the final determination. A
permit will be granted unless its issuance is found to be contrary to the
public interest.
CLOSE OF COMMENT PERIOD: All
comments pertaining to this Public Notice must reach this office on or before
the close of the comment period listed on page one of this Public Notice.
If no comments are received by that date, it will be considered that there are
no objections. Comments
and requests for additional information should be submitted to:
United
States Army Corps of Engineers
ATTN:
CELRH-RD-N
Public
Notice No. LRH-2015-738-GMR
502
Eighth Street
Huntington,
West Virginia 25701-2070.
Please
note names and addresses of those who submit comments in response to this
Public Notice become part of our administrative record and, as such, are available
to the public under provisions of the Freedom of Information Act. Thank you for your interest in our nation’s
water resources. If you have any
questions concerning this Public Notice, please contact Laurie Moore of the
North Branch at (513) 825-1901, by mail at the above address, or by email at: laurie.a.moore@usace.army.mil.