APPLICANT: Swallow Tail, LLC
PROJECT LOCATION: The first mitigation project site,Blue Branch Mitigation Site #1, is located primarily within the floodplain of Blue Branch, in Sections 33, 34 and 35, Township 49 North, Range 30 West and in Sections 2 and 3, Township 48 North, Range 30 West, in Jackson County, Missouri.
ACTIVITY: This notice is to announce the proposed establishment of the Central Plains/Blackwater/Lamine
Wetland and Stream Umbrella Mitigation Bank Instrument. Swallow Tail, LLC proposes to establish the first compensatory mitigation project site, under this proposed Umbrella Bank Instrument, by establishing (creating), restoring, enhancing and preserving aquatic resources and upland resources on approximately 172 acres of land adjacent to Blue Branch.
APPLICANT: Swallow Tail, LLC
PROJECT LOCATION: The first mitigation project site,Blue Branch Mitigation Site #1, is located primarily within the floodplain of Blue Branch, in Sections 33, 34 and 35, Township 49 North, Range 30 West and in Sections 2 and 3, Township 48 North, Range 30 West, in Jackson County, Missouri.
ACTIVITY: This notice is to announce the proposed establishment of the Central Plains/Blackwater/Lamine
Wetland and Stream Umbrella Mitigation Bank Instrument. Swallow Tail, LLC proposes to establish the first compensatory mitigation project site, under this proposed Umbrella Bank Instrument, by establishing (creating), restoring, enhancing and preserving aquatic resources and upland resources on approximately 172 acres of land adjacent to Blue Branch.
TERRA TECHNOLOGIES
Prospectus
Mitigation Banking Instrument
For the
Central Plains/Blackwater/Lamine EDU
Wetland & Stream
Umbrella Mitigation Bank
March 2016
6240 West 135th Street, Suite 100 · Overland Park, KS 66223
Phone: 913-385-9560 ·
Fax: 913-385-5295
http://www.terratechnologies.com
Prospectus
Central Plains/Blackwater/Lamine EDU Wetland & Stream Umbrella Mitigation Bank
TABLE OF CONTENTS
I.
INTRODUCTION............................................................................... 1
II.
OBJECTIVES ..................................................................................... 1
III.
ESTABLISHMENT AND OPERATION ......................................... 2
IV.
SERVICE AREA................................................................................. 8
V.
GENERAL NEED AND TECHNICAL FEASIBILITY ................. 9
VI.
CURRENT
AND
LONG-TERM
OWNERSHIP
ARRANGEMENTS AND LONG-TERM MANAGEMENT
STRATEGY ....................................................................................... 12
VII. SPONSOR QUALIFICATIONS ..................................................... 13
VIII. ECOLOGICAL SUITABILITY ...................................................... 14
IX.
WATER RIGHTS, MINERAL RIGHTS & EXISTING REAL
ESTATE ENCUMBRANCES.......................................................... 15
X.
REFERENCES .................................................................................. 15
APPENDICES
Appendix A:
Appendix B:
Appendix C:
Financial Assurances: Letter of Credit Example
Site Protection Instrument Example
Sponsor Qualifications
i
Swallow Tail, LLC
March 2016
Prospectus
I.
Central Plains/Blackwater/Lamine EDU Wetland & Stream Umbrella Mitigation Bank
INTRODUCTION
Swallow Tail, LLC (the Sponsor) is proposing to establish the Central
Plains/Blackwater/Lamine EDU Wetland & Stream Umbrella Mitigation Bank (the Bank)
which will describe the establishment and operation of individual wetland and/or stream
mitigation sites (mitigation sites) within the watershed service area in east-central
Missouri. The Final Umbrella Mitigation Banking Instrument will define general
guidelines applicable to all mitigation sites authorized as part of the Bank but certain sitespecific details will be included in the mitigation plan for each mitigation site. These
mitigation plans will become attachments to this umbrella mitigation banking instrument
upon approval. The establishment of this umbrella mitigation bank will streamline the
production of the Sponsor's mitigation plans and reduce regulatory workloads in the
watershed service area in comparison to the establishment of multiple separate mitigation
banking instruments. Consequently, mitigation sites will be more rapidly developed
which will be beneficial to water quality and wildlife habitat, as well as being of service
to the regulated public.
II.
OBJECTIVES
The objectives of this proposed umbrella mitigation bank are: 1) to provide appropriate
compensatory mitigation for impacts to jurisdictional aquatic habitats such as streams and
wetlands authorized under Sections 404 and 401 of the Clean Water Act and/or Section
10 of the Rivers and Harbors Act of 1899 within the watershed service area and, 2) to
improve the water quality and wildlife habitat functions provided by the mitigation sites
in a manner that would simultaneously address the specific mitigation needs of the
mitigation sites and the larger aquatic needs of the watershed. This would be done by reestablishing the native habitats that would have likely existed on the mitigation sites
before agricultural conversion and by increasing the quantity and quality of stream,
wetland, buffer and upland habitat, and the associated ecosystem functions. Typical
anticipated mitigation activities include addressing stream bed and bank instability;
reversing past stream channelization efforts by restoring natural stream channel alignment
and/or cross section; riparian buffer restoration and enhancement; wetland restoration,
rehabilitation, establishment, and enhancement; and buffer and upland establishment and
enhancement. The Sponsor shall then legally protect the mitigation sites as natural habitat
in perpetuity.
1
Swallow Tail, LLC
March 2016
Prospectus
Central Plains/Blackwater/Lamine EDU Wetland & Stream Umbrella Mitigation Bank
III.
ESTABLISHMENT AND OPERATION
A.
Umbrella Mitigation Bank Operation & Document Organization
The U.S. Army Corps of Engineers (the Corps) approval of this Instrument constitutes the
regulatory approval required for the Central Plains/Blackwater/Lamine EDU Wetland &
Stream Umbrella Mitigation Bank to be used to provide compensatory mitigation for
Department of the Army permits pursuant to 33 C.F.R. 332.8(a)(1). This Instrument is not
a contract between the Sponsor or the Property Owner and the USACE or any other
agency of the federal government. Any dispute arising under the Instrument will not give
rise to any claim by the Sponsor or the Property Owner for monetary damages. This
provision is controlling notwithstanding any other provision or statement in the
Instrument to the contrary.
The Final Umbrella Mitigation Banking Instrument will serve as a binding agreement
regarding the establishment, use, operation and maintenance of the Bank and is made and
entered into, by, and among the Sponsor and the members of the Interagency Review
Team (the IRT). The IRT is chaired by the Kansas City District of the U.S. Army Corps
of Engineers and will also include as members the U.S. Environmental Protection Agency
(EPA), the U.S. Fish and Wildlife Service (FWS), the Missouri Department of Natural
Resources (MDNR) and the Missouri Department of Conservation (MDC).
The Final Umbrella Mitigation Banking Instrument will become valid on the date of the
last signatory's signature. The Final Umbrella Mitigation Banking Instrument may be
amended or modified with the written approval of all signatory parties as described in the
Mitigation Rule at 33 CFR Part 332.8(d). The addition and approval of mitigation sites
and the expansion of previously approved mitigation sites will be included as
modifications (i.e., attachments) to the Final Umbrella Mitigation Banking Instrument
using the procedures described in the Mitigation Rule at 33 CFR Part 332.8(g)(1). Any of
the IRT members may terminate their participation upon written notification to all
signatory parties. Participation of the IRT members will terminate 30 days after written
notification.
After Corps and IRT approval of mitigation sites the Sponsor shall perform the mitigation
activities described in the mitigation plan of each mitigation site or as shown in any
subsequent As-Built Figures and shall operate all mitigation sites in accordance with the
provisions of the Final Umbrella Mitigation Banking Instrument and the corresponding
mitigation plan. The Sponsor shall receive wetland credits and stream credits upon
satisfaction of the ecological performance standards outlined in the Final Umbrella
Mitigation Banking Instrument and/or the mitigation plan of each mitigation site. After
all ecological performance standards have been met and after all credits have been
2
Swallow Tail, LLC
March 2016
Prospectus
Central Plains/Blackwater/Lamine EDU Wetland & Stream Umbrella Mitigation Bank
released to the Sponsor, the Bank will have received the total number of wetland credits
and stream credits stated in the mitigation plan of each mitigation site to use as
compensatory mitigation for impacts to waters of the U.S., including wetlands, authorized
by Sections 404 and 401 of the Clean Water Act and/or Section 10 of the Rivers and
Harbors Act of 1899. The amount of stream credits granted to the Sponsor will be
determined by the Corps and IRT and will be proportionate to the amount of functional
lift accomplished at the site which will be calculated through the use of the 2013 Missouri
Stream Mitigation Method (U.S. Army Corps of Engineers, 2013a) or any subsequently
approved method of credit assessment. Wetland credits will be determined on an acreage
basis depending on the type of mitigation activity (establishment, rehabilitation, or
enhancement) unless a new method of wetland credit assessment is adopted after the
approval of the Final Umbrella Mitigation Banking Instrument. Credits will be sold to
third parties at appropriate market rates to be determined by the Sponsor. The sale of
these wetland credits and stream credits available at the mitigation sites only pertain to the
mitigation requirements of the Department of the Army permit issued under the
authorities of Section 404 of the Clean Water Act and/or under Section 10 of the Rivers
and Harbors Act of 1899 and any associated Section 401 water quality certification as
administered by the State of Missouri. Additional mitigation requirements may be
necessary to comply with other federal, state, and/or local statutes and regulations. Per
Corps' and EPA's joint regulation for Compensatory Mitigation for Losses of Aquatic
Resources (the Mitigation Rule) at 33 CFR 332.3(j)(1)(ii), proposed mitigation activities
may address requirements of multiple regulatory programs and authorities for the same
activity.
This Prospectus addresses all requirements of a complete Prospectus as described in the
Corps' Mitigation Banking Instrument Outline for Proposed Mitigation Banks within the
State of Missouri (U.S. Army Corps of Engineers, 2015) in addition to some supplemental
information provided by the Sponsor. After this Prospectus has been placed on Public
Notice and the public comments have been submitted to the Sponsor, the Sponsor will
address those comments and submit the Draft Umbrella Mitigation Banking Instrument
which will contain the necessary information required by the Mitigation Banking
Instrument Outline for Proposed Mitigation Banks within the State of Missouri, including
but not limited to baseline information, determination of credits, mitigation work plan,
ecological performance standards, monitoring requirements, management plans, financial
assurances, credit release schedule, and default and closure provisions. An example letter
of credit that would be used as financial assurances is included in Appendix A. The
Corps and IRT will then have the opportunity to comment on the Draft Umbrella
Mitigation Banking Instrument. The Sponsor will then incorporate the comments into the
document and submit the Final Umbrella Banking Instrument for Corps and IRT review.
3
Swallow Tail, LLC
March 2016
Prospectus
Central Plains/Blackwater/Lamine EDU Wetland & Stream Umbrella Mitigation Bank
The main body of the Final Umbrella Banking Instrument will discuss how the Bank will
be established and operated and will include the following:
· Location
· Establishment and Operation
· Current and Long-Term Ownership Arrangements and Long-Term Management
Strategy
· Sponsor Qualifications
· Legal Responsibility for Compensatory Mitigation
· Watershed Approach
· Service Area
· Mitigation Plan Guidelines
o Objectives
o Site Selection (General Discussion of Prioritization Criteria)
o Site Protection Instrument
o Determination of Credits (Methodology)
o Operation and Maintenance Plan Guidelines
o Common Ecological Performance Standards (Wetland Hydrology,
Hydrophytic Vegetation, Hydric Soils, Desirable Vegetative Cover, Tree &
Shrub Survival, Invasive Species, etc.)
o Monitoring Requirement Guidelines
o Long-Term Management Plan Guidelines
o Adaptive Management Plan Guidelines
o Financial Assurance Guidelines
· Credit Release Schedule Guidelines
· Accounting Procedures
· Reporting
· Default and Closure
The mitigation plans for each mitigation site will be attachments to the Final Umbrella
Banking Instrument. These mitigation plans will include the following:
· Location (Including Map[s] and Shapefile)
· Objectives
· Site Selection (Including Descriptions of Existing Easements and Documentation
of Acquisition and Protection of Water Rights)
· Site Protection Instrument (If Different Than Instrument Main Body)
· Baseline Information
· Determination of Credits
· Mitigation Work Plan
· Operation and Maintenance Plan
4
Swallow Tail, LLC
March 2016
Prospectus
Central Plains/Blackwater/Lamine EDU Wetland & Stream Umbrella Mitigation Bank
· Site-Specific Ecological Performance Standards (If Different Than Instrument
Main Body)
· Site-Specific Monitoring Requirements (If Different Than Instrument Main Body)
· Site-Specific Long-term Management Plan (Including Legal Mechanism &
Responsible Party)
· Site-Specific Adaptive Management Plan
· Financial Assurances
· Credit Release Schedule
· Other Information Required by the Corps
B.
Initial Mitigation Site
The Sponsor has an initial mitigation site within the service area whose mitigation plan
will be included in the Bank's Draft Mitigation Banking Instrument. The initial
mitigation site is owned by Habitat Missouri, LLC and Terra Foundation Inc. The
proposed Blue Branch Wetland & Stream Mitigation Site is approximately 171.93 acres
in size and is located in Grain Valley, Jackson County, Missouri along Blue Branch, just
upstream from its confluence with Sni-A-Bar Creek. This mitigation site is divided into
three parcels that are separated by Sni A Bar Parkway and AA Highway. This location is
shown below in Figure 1 (ESRI, 2016). Figure 2 shows an aerial photograph of the Bank
along with its proposed boundaries (Google Earth, 2013).
5
Swallow Tail, LLC
March 2016
Prospectus
Central Plains/Blackwater/Lamine EDU Wetland & Stream Umbrella Mitigation Bank
Figure 1. Blue Branch Wetland & Stream Mitigation Site Location
N
Blue Branch
Sni-A-Bar
Creek
Mitigation Site
Typical
County
Boundary
6
Swallow Tail, LLC
March 2016
Prospectus
Central Plains/Blackwater/Lamine EDU Wetland & Stream Umbrella Mitigation Bank
Figure 2. Blue Branch Wetland & Stream Mitigation Site
Aerial Photograph with Approximate Boundaries
Approximate
Mitigation Site
Boundaries
Sni A Bar
Parkway
Blue
Branch
AA
Highway
Direction
of Flow
N
The Blue Branch Wetland and Stream Mitigation Site's position within the Blue Branch
floodplain at a location containing multiple tributary streams meant that the site's presettlement morphology and ecology were largely shaped by the alluvial processes of these
numerous streams, the foremost being Blue Branch itself. Frequent flooding created
poorly drained hydric soils throughout the bottomlands and wetland, riparian, and prairie
habitats likely dominated the site historically. Agricultural conversion and residential &
commercial development lessened the strong hydrologic influences on the mitigation site
through habitat replacement and the channelization of some of the tributary streams.
Additionally, a large farmed wetland complex exists in the eastern parcel of the mitigation
site. Restoration of this converted wetland to a natural wetland system will represent a
substantial ecological lift for the watershed. Also, changes in the surrounding land use
from prairie and woodlands to agriculture and developed land altered the watershed
hydrology of the onsite streams so that they received flows of greater magnitudes and
shorter durations. This change caused dramatic stream base incision and bank erosion
which in turn undoubtedly decreased these streams' natural connection with their
floodplains and moved large quantities of eroded sediments into downstream waters.
Today, these stream channels are deeply incised and the tops of the steep stream banks are
held by the exposed roots of the streamside trees, the eventual toppling of which will
further destabilize these stream systems. Blue Branch itself has multiple zones of
significant bank erosion due to past stream channelization activities as well as commercial
and residential development. The Sponsor is proposing to address the needs of this
property and of the watershed through wetland establishment, restoration and
enhancement; stream grade control and habitat enhancement; riparian habitat restoration
7
Swallow Tail, LLC
March 2016
Prospectus
Central Plains/Blackwater/Lamine EDU Wetland & Stream Umbrella Mitigation Bank
and enhancement; and stream bank stability. Additionally, in order to provide a
significant public benefit, the Sponsor is partnering with the City of Grain Valley Parks
and Recreation Department to establish a permanent trail system within the property. The
trail will be excluded from the mitigation site and no mitigation credit will be awarded for
the portions of the property where the trail is constructed.
For all of the reasons stated above, the Blue Branch Wetland & Stream Mitigation Site
has significant potential for wetland and stream mitigation and will provide a significant
public benefit. Additional details will be provided as a mitigation plan attachment to the
Bank's Draft Mitigation Banking Instrument.
IV.
SERVICE AREA
The proposed service area of the Bank is the portion of the Central Plains / Central
Plains/Blackwater/Lamine Ecological Drainage Unit (EDU) within Missouri. This
service area consists of the watershed of the Missouri River in the west-central portion of
the state. The primary tributaries to the Missouri River in this service area include the
Blue River, Crooked River, Blackwater River, and Lamine River. The boundaries of this
service area are shown below in Figure 3.
Figure 3. Service Area Boundaries
8
Swallow Tail, LLC
March 2016
Prospectus
Central Plains/Blackwater/Lamine EDU Wetland & Stream Umbrella Mitigation Bank
On a case-by-case basis the Corps, in consultation with the IRT, may approve mitigation
credits to be sold to offset impacts from Department of the Army permit impacts that
occur outside this service area. If determined appropriate, the Corps will determine the
number of credits needed to be purchased in order to adequately replace the aquatic
resources lost at the Department of the Army permit site.
The EDUs within Missouri generally consist of the state's major watersheds. They are
combinations of 8-digit Hydrologic Unit Code (HUC) watersheds grouped together
because of a common drainage area, geomorphology, and aquatic species assemblages.
As a result, all areas within an EDU contain aquatic species that are evolutionarily
divergent from those in neighboring EDUs because of the distinct aquatic habitats that are
unique to each EDU (Sowa et al., 2005). The concept of EDUs was originated by The
Nature Conservancy's Freshwater Initiative with the goal of creating a meaningful
geographic unit of ecologically similar drainage basins within which restoration and
conservation sites can be selected to guarantee that target species and habitats are
characterized across important environmental gradients. This commonality between the
aquatic habitats within each of these major drainages makes the EDU an appropriate
watershed boundary unit for centralized mitigation within Missouri.
V.
GENERAL NEED AND TECHNICAL FEASIBILITY
The service area is a Missouri watershed shown to be in need of restoration. All states
were required by the federal government to write a Unified Watershed Assessment in
order to formally measure and prioritize the restoration or protection need of water
resources within all eight-digit HUC watersheds in each state. The State of Missouri
Unified Watershed Assessment, which was created by a steering committee which
included as members MDNR, the Center for Applied Research and Environmental
Systems (CARES), the Natural Resources Conservation Service (NRCS), the U.S. Forest
Service, and the U.S. Department of Agriculture Farm Service Agency, ranked all of the
8-digit HUCs in Missouri in terms of restoration priorities with a specific focus on
watersheds in greatest need of restoration. The results of this analysis placed the Lower
Missouri Crooked subbasin (HUC 10240012) that contains the Bank as the 16th highest
restoration priority out of the 66 8-digit HUCs in Missouri and stated that this subbasin
had a severe biological impairment. The factors that influenced the prioritization of this
subbasin include urban non-point sources, agricultural non-point sources, channel
alterations, a TMDL 303(d) stream, severe biological impairment, point source pollutants,
sedimentation, stream bank/channel erosion, and a significant number of public drinking
water intakes (Missouri Unified Watershed Assessment Steering Committee, 1998).
The Missouri Resource Assessment Partnership (MoRAP), a collection of University of
Missouri employees who have produced a number of digital data and maps related to
9
Swallow Tail, LLC
March 2016
Prospectus
Central Plains/Blackwater/Lamine EDU Wetland & Stream Umbrella Mitigation Bank
natural resources, has undertaken a thorough analysis of the type and severity of threats to
aquatic resources throughout Missouri in order to create Human Stressor Index values for
each small drainage area (Aquatic Ecological System). This analysis characterized the
level of stress on riverine ecosystems across the state from eleven unique and fairly
uncorrelated factors: percent urban cover, percent agricultural cover, number of
introduced species, amount of hydrologic modification or fragmentation by major
impoundments, population change between 1990 and 2000, number of small
impoundments, density of stream road crossings, density of coal mines, density of
NPDES permitted discharges, density of lead mines, and density of confined animal
feeding operations (Sowa et al., 2005). While this analysis was focused solely on riverine
ecosystems, the results can be safely extrapolated to be applicable to all aquatic resources.
This is because the same stressors act similarly on stream, wetland, and open water
habitats due to the ecological parallels between these systems and the close physical,
chemical, and biological relationships between neighboring aquatic habitats.
Additionally, the results from each Aquatic Ecological System can be combined to
provide a thorough presentation of the type and severity of threats to aquatic resources
within each service area.
The aquatic resources in the proposed service area are highly stressed as almost all of the
Central Plains / Central Plains/Blackwater/Lamine EDU in Missouri is shown to be in the
upper two levels of the Human Stressor Index. The locations of greatest aquatic stress are
watersheds that are directly adjacent to the Missouri River. All of these areas are ranked
in the top level of overall Human Stressor Index (Sowa et al., 2005).
Assessing the service area as a whole, the median value for each stressor shows a
relatively high to moderate level of stress from agricultural activities and disturbance
from stream road crossings; a moderate to low level of stress from the number of
introduced species, population change (i.e., land development), large federally licensed
dams, density of coal mines, density of NPDES permitted discharges, and confined
animal feeding operations; and a relatively low level of stress from all other factors.
There was relatively little variation in the level of disturbance caused by each individual
aquatic threat across the service area as almost all of the service area was impacted by
agriculture at the highest or second highest level. The Clear Creek Aquatic Ecological
System that is located along US I-70 between Odessa and Sweet Springs is considered to
have the highest level of human stress within the EDU and has the highest level of
disturbance from agriculture and federally licensed impoundments. The Aquatic
Ecological Systems within the Kansas City metropolitan area portion of the service area
on average had the highest average possible rating for the density of stream road crossings
and also had a moderate to high amount of impacts from agricultural disturbance,
federally licensed impoundments, and NPDES permitted discharges (Missouri Resource
Assessment Partnership, 2005).
10
Swallow Tail, LLC
March 2016
Prospectus
Central Plains/Blackwater/Lamine EDU Wetland & Stream Umbrella Mitigation Bank
The conclusions of the MoRAP analysis are corroborated by those of MDC and MDNR.
In its watershed inventories and assessments for the Crooked, Lamine, and Blue Rivers,
MDC found that the main aquatic impairments in the Crooked river watershed are soil
erosion from agricultural uplands, urban areas, and stream banks; minimal riparian
buffers; and modified stream flow patterns because of agricultural conversion and
urbanization. Channelization and the creation of levees has been widespread in the
assessed watersheds (and throughout this service area), resulting in the direct loss of
aquatic habitat, downcutting, significant erosion, and the hydrologic disconnection of
rivers from their floodplains (Pitchford et. al., n.d., Horton & Kerns, n.d., & Brown et. al.,
n.d.). Additionally, according to MDNR (1996), the major water quality areas of concern
in this service area are:
· Most streams in the agricultural portions of the service area contain excessive
sediment resulting from runoff from agricultural fields
· Saline springs within the Blackwater watershed result in poor water quality within
those streams
· Most of the nitrogen, phosphorus and metals found in stormwater flows in the Blue
River were associated with suspended sediments from agricultural runoff
Based on the findings described above, the main threat to aquatic resources in this service
area is agriculture, followed by stream road crossings, and to a lesser degree introduced
species, small impoundments, and the density of NPDES permitted discharges, with a
relatively low level of disturbance from all other stressors at the watershed level. Impacts
to aquatic resources resulting from agricultural activities include insufficiently wide
riparian buffers; non-point source pollution of nutrients, herbicides and pesticides; the
conversion of wetlands; stream channelization, excessive sediment loads, and livestock
damage. In developed areas, aquatic resources are impacted by such threats as increases
in surface water flows and resulting erosion, stream channelization, wetland conversion,
and water pollution from point and nonpoint sources. The mitigation activities proposed
as part of the Bank will address these watershed needs by converting agricultural
ecosystems to the natural habitats that likely previously existed on the site; significantly
reducing invasive species cover; widening riparian buffers; establishing large wetland
areas that will treat nutrient, chemical, and sediment pollution; restoring natural stream
channel alignments and cross sections; and reducing soil erosion.
The proposed wetland and stream mitigation activities are technically feasible. As
described later in this document, the Sponsor has a history of selecting mitigation sites
that are ecologically suitable for stream and riparian buffer restoration. These locations
have contained stretches of perennial, intermittent and ephemeral streams that have
denuded and/or degraded riparian buffers and require in-stream restoration to re-establish
proper channel cross section, remedy bank instability, or reverse past channelization
11
Swallow Tail, LLC
March 2016
Prospectus
Central Plains/Blackwater/Lamine EDU Wetland & Stream Umbrella Mitigation Bank
efforts which present great potential for restoring in-stream and riparian buffer habitat. In
addition, the Sponsor's previously approved mitigation sites have had topography, soils,
and hydrology amenable to wetland restoration, establishment, rehabilitation and
enhancement.
VI.
CURRENT AND LONG-TERM OWNERSHIP
ARRANGEMENTS AND LONG-TERM MANAGEMENT
STRATEGY
Unless otherwise stated in the site-specific mitigation plan, The Flick Family Irrevocable
Trust will own the real estate containing each mitigation site, including the water rights
and mineral rights, and the Sponsor will develop mitigation plans to establish, restore,
rehabilitate, and enhance onsite streams, riparian buffers, wetlands, buffers, and/or
uplands at each mitigation site. It is the intention of the Sponsor to legally preserve the
property as open space habitat in accordance with the terms of the long-term management
plan included in the Final Umbrella Mitigation Banking Instrument and each mitigation
site conservation easement. Conservation easements will be the legal means to ensure
that each mitigation site remains as natural habitat in perpetuity. The conservation
easements shall prohibit any development of the site and shall stay with the mitigation site
property in the instance that the title to the property is transferred to another party. A
draft conservation easement is included in Appendix B. The terms of the easement will
be enforceable by the Corps and the Midwest Mitigation Oversight Association, a nonprofit group that will hold the conservation easement and will monitor the Sponsor's
compliance with the conditions of the easement. After the mitigation site is approved,
copies of the finalized and recorded conservation easement shall be provided to the Corps.
The Midwest Mitigation Oversight Association is a conservation-based non-profit
corporation established in 2007 with the sole purpose of holding and monitoring natural
resource mitigation conservation easements.
The Midwest Mitigation Oversight
Association has been approved by the Kansas City, St. Louis, and Little Rock Districts of
the U.S. Army Corps of Engineers as a legally-binding recipient of conservation
easements for mitigation sites and currently holds easements on thousands of acres of
federal mitigation parcels in Missouri and Kansas. The board of directors consists of
professionals whom all meet stringent requirements in order to be on the board, including
the possession of a broad scientific background related to natural resources, conservation
science, or applied ecology. These board members have more than fifty combined years
of professional natural resource experience in wetland and stream regulations, habitat
maintenance, and construction.
12
Swallow Tail, LLC
March 2016
Prospectus
Central Plains/Blackwater/Lamine EDU Wetland & Stream Umbrella Mitigation Bank
The long-term management strategy for each mitigation site is to provide limited
maintenance and management of the mitigation site as needed after all parties have
determined that the mitigation site is successful and that more intensive monitoring and
management is no longer necessary. Active management of each mitigation site will
continue for a minimum of fifteen (15) years after approval of the mitigation site or until
all credits from the mitigation site have been sold (unless the remaining credits are
indefinitely suspended or removed), whichever is later. At that point, the ecosystems
within the mitigation site will not require active management. Long-term management
will commence at the end of the active management phase of mitigation site operation and
will include continued maintenance of the mitigation site for purposes of such activities as
controlling invasive species, maintaining water control berms, prevention of trespassing
and removal of litter, as necessary. Costs associated with these activities will be paid for
by the revenues from credit sales. It is the intent of the Sponsor to oversee the long-term
management of each mitigation site in perpetuity, but should the Sponsor for any reason
decide to transfer the long-term management of a mitigation site to a currently unknown
entity, the Sponsor will notify the Corps prior to the transfer of the long-term management
responsibilities. At that time the appropriate funding mechanism for a mitigation site, as
outlined in the Mitigation Rule at 33 CFR 332.7(d), will be determined.
VII. SPONSOR QUALIFICATIONS
The Sponsor operates five existing approved wetland and stream mitigation banks within
the Kansas City District of the Corps. Project descriptions of these mitigation banks are
included in Appendix C. These approved wetland and stream mitigation banks together
encompass roughly 474 acres and include more than 150 acres of floodplain wetland
establishment, restoration and enhancement as well as many acres of wetlands established
within riparian buffers that function solely as stream mitigation. These approved
mitigation banks have also legally protected both sides of almost 4.7 miles of streams and
more than 3.25 miles of streams on one side and have expanded riparian buffers on these
streams with more than 223 acres of new riparian buffer plantings. The Sponsor also has
five proposed wetland and stream mitigation banks in the Corps' Kansas City District and
two proposed wetland and stream mitigation banks in the Corps' Little Rock District
under current review that are either entirely or partially constructed. The design,
construction, management, and monitoring of these proposed mitigation banks further
demonstrates the Sponsor's qualifications to perform mitigation related to wetland,
riparian, stream, and upland habitats.
Specific to the design and construction of stream channel restoration projects, the
Sponsor's approved Stranger Creek Wetland and Stream Mitigation Bank included the
restoration of more than a half mile of two highly degraded farm ditches to their natural
condition as intermittent stream channels with appropriate channel morphology and
13
Swallow Tail, LLC
March 2016
Prospectus
Central Plains/Blackwater/Lamine EDU Wetland & Stream Umbrella Mitigation Bank
riparian buffers. Also as part of that project, a longitudinal peak stone toe bank
stabilization was engineered and constructed along about 300 feet of Stranger Creek to
address an area experiencing extreme erosion. In addition, willow plantings along
perennial stream banks have been utilized at two of the Sponsor's approved mitigation
banks in order to stabilize eroding stream banks utilizing natural methods.
Services related to project planning and design as well as construction oversight and
monitoring of the Bank will be contracted to the scientists and engineers at Terra
Technologies, Inc. (Terra Technologies). Terra Technologies is an environmental
engineering company with offices in Overland Park, Kansas and St. Louis, Missouri. The
firm has significant experience with compensatory mitigation projects with approximately
600 successful mitigation sites in Kansas and Missouri since the company's founding in
1992. Additionally, Terra Technologies has extensive expertise in the planning, design,
and construction of large-scale wetland and stream mitigation projects as the firm has
designed and overseen construction of all of the Sponsor's approved and proposed
mitigation banks.
The licensed professional engineers and biologists at Terra Technologies have significant
experience in stream design, restoration, stabilization, and enhancement as they have
designed stream improvements for many waterways throughout Missouri and Kansas
including projects for the City of Leawood, Kansas; the City of Overland Park, Kansas;
the City of Merriam, Kansas; the City of Shawnee, Kansas; the City of Lawrence, Kansas;
the City of Independence, Missouri; the City of Blue Springs, Missouri; the City of St.
Charles, Missouri; the Metropolitan St. Louis Sewer District, and; the U.S. Army Corps
of Engineers Kansas City District among many others. In addition, Terra Technologies
was also awarded the Conservation Award in 1999 from the Kansas Department of
Wildlife and Parks Environmental Services Section for their work with municipalities and
private entities.
VIII. ECOLOGICAL SUITABILITY
Each mitigation site will be ecologically suitable as a large-scale wetland and/or stream
mitigation site because of its location, baseline conditions, and mitigation opportunities.
All of these aspects will be discussed in the mitigation plan for each mitigation site. Each
of the Sponsor's approved mitigation banks have been ecologically suitable for wetland
and stream mitigation based upon an assessment of such characteristics as each site's
stream mitigation priority status, proximity to existing protected natural areas,
topography, floodplain limits, soils, existing wetland and stream locations and boundaries,
degree of ecological degradation, and resulting mitigation opportunities. The same
factors will be evaluated for each of the Bank's mitigation sites.
14
Swallow Tail, LLC
March 2016
Prospectus
IX.
Central Plains/Blackwater/Lamine EDU Wetland & Stream Umbrella Mitigation Bank
WATER RIGHTS, MINERAL RIGHTS & EXISTING REAL
ESTATE ENCUMBRANCES
Missouri is a state governed by riparian doctrine water law. As such, river and stream
flows are not treated as property to be owned. Instead, riparian land owners have the right
to use and enjoy those waters in a reasonable manner. These water rights are inextricably
bound to the legal ownership of real estate property that borders or underlies waterways
or is located above groundwater. Consequently, those water rights cannot be legally
separated from the ownership of the riparian lands and sold to other entities as is the
policy in many western states which typically utilize the prior appropriation doctrine (i.e.,
first in time, first in right) (Gaffney & Hays, 2000).
The Flick Family Irrevocable Trust will hold the water rights on each mitigation site.
There is no plan for irrigation or mechanized distribution of water at any mitigation site.
All water necessary for wetland and/or stream mitigation will be attained by stream flows,
precipitation, overland sheet flow and overbank flood flows based on the Flick Family
Irrevocable Trust's water rights. In addition, the plant species proposed for each
mitigation site will be native species and therefore generally drought resistant.
The Flick Family Irrevocable Trust will also own all mineral rights on each mitigation
site. Consequently, the potential for future mineral exploration or extraction will not
threaten the long-term sustainability of each mitigation sites as the mitigation sites'
conservation easements will prohibit mineral extraction. Additionally, any existing real
estate encumbrances on each mitigation site will be disclosed to the Corps and IRT.
X.
REFERENCES
Brown, D. J., W. M. Turner, T. Priesendorf, and R. J. Dent. n.d. Lamine River
Watershed Inventory and Assessment. Missouri Department of Conservation. Retrieved
from:
http://mdc.mo.gov/landwater-care/stream-and-watershed-management/missouriwatersheds/lamine-river/pdf-version. Accessed on: March 25, 2016.
ESRI. 2016. Imagery Basemap. Using: ArcGIS Explorer 2500: ESRI, Redlands, CA.
Google
Inc.
2013.
Google
Earth
(Version
http://www.google.com/earth/download/ge/agree.html.
7.1.2.2041)
[Software].
Gaffney, R., and Hays, C. 2000. Missouri State Water Plan Series Volume VII, A
Summary of Missouri Water Laws. Missouri Department of Natural Resources' Division
of Geology and Land Survey, Water Resources Report No. 51. Available at:
http://www.dnr.mo.gov/pubs/WR51.pdf. Retrieved on March 25, 2016.
15
Swallow Tail, LLC
March 2016
Prospectus
Central Plains/Blackwater/Lamine EDU Wetland & Stream Umbrella Mitigation Bank
Horton, R., and H. Kerns. n.d. Crooked River Watershed Inventory and Assessment.
Missouri Department of Conservation. Retrieved from: http://mdc.mo.gov/yourproperty/greener-communities/missouri-watershed-inventory-and-assessment/crookedriver/pdf-vers. Accessed on: March 25, 2016.
Missouri Resource Assessment Partnership. 2005. Missouri Aquatic Ecological System
(AES) human stressor index (HSI) [Computer File]. Columbia, Missouri: University of
Missouri. Retrieved from: ftp://ftp.gap.uidaho.edu/products/Aquatic/MO_Aquatic/GIS/
Ancillary/aes_human_stressor_matrix_index.dbf. Accessed on: December 14, 2011.
Missouri Department of Natural Resources (MDNR). 1996. Missouri Water Quality
Report 1996. Missouri Department of Natural Resources, Jefferson City, Missouri.
Missouri Unified Watershed Assessment Steering Committee. 1998. State of Missouri
unified watershed assessment final report. United States Department of Agriculture
Natural Resources Conservation Service, Columbia, Missouri.
Pitchford, G. D., R. D. Pulliam, K. P. Sullivan, and P. J. Jefferies. n.d. Blue River
Watershed Inventory and Assessment. Missouri Department of Conservation. Retrieved
from:
http://mdc.mo.gov/your-property/greener-communities/missouri-watershedinventory-and-assessment/blue-river/pdf-version. Accessed on: March 25, 2016.
Sowa, S. P., D. D. Diamond, R. Abbitt, G. Annis, T. Gordon, M. E. Morey, G. R.
Sorensen, and D. True. 2005.
A Gap Analysis for Riverine Ecosystems of
Missouri. Final Report, submitted to the USGS National Gap Analysis Program. 1675 pp.
Retrieved from: http://morap.missouri.edu/index.php/aquatic-gap-pilot-project/
;
Fish
of
Missouri
associated
file
available
at:
http://www.cerc.usgs.gov/morap/Assets/UploadedFiles/Projects/Aquatic_GAP_Pilot_Proj
ect/Fish_of_Missouri.pdf
;
Mussels
of
Missouri
associated
file
available
at:
http://www.cerc.usgs.gov/morap/Assets/UploadedFiles/Projects/Aquatic_GAP_Pilot_Proj
ect/Mussels_of_Missouri.pdf.
Accessed on: March 4, 2016.
U.S. Army Corps of Engineers. 2013. Mitigation banking instrument outline for
proposed mitigation banks within the State of Missouri.
Retrieved from:
http://www.nwk.usace.army.mil/Portals/29/docs/regulatory/mitigation/MOBankOutline(A
pr2013).pdf. Accessed on: April 15, 2014.
16
Swallow Tail, LLC
March 2016
Prospectus
Central Plains/Blackwater/Lamine EDU Wetland & Stream Umbrella Mitigation Bank
U.S. Army Corps of Engineers. 2013a. State of Missouri Stream Mitigation Method.
Retrieved
from:
http://www.nwk.usace.army.mil/Portals/29/docs/regulatory/
mitigation/MSMM_May2013.pdf. Accessed on: May 16, 2014.
17
Swallow Tail, LLC
March 2016
PUBLIC NOTICE
Permit No. NWK-2015-02320
Issue Date: April 13, 2016
Expiration Date: May 13, 2016
US Army Corps
of Engineers
Kansas City District
30-Day Notice
______________________________________________________________________________
CENTRAL PLAINS/BLACKWATER/LAMINE WETLAND AND STREAM
UMBRELLA MITIGATION BANK INSTRUMENT
AND
THE BLUE BRANCH WETLAND
AND STREAM MITIGATION SITE #1
This notice is to announce the proposed establishment of the Central Plains/Blackwater/Lamine
Wetland and Stream Umbrella Mitigation Bank Instrument (Umbrella Bank Instrument). The
Kansas City District, Corps of Engineers, Regulatory Branch requests comments from the public
and from local government agencies and State and Federal resource agencies concerning the
proposed establishment of this Umbrella Bank Instrument. If approved by the District Engineer,
in consultation with the Interagency Review Team (IRT), the mitigation sites established under
this Umbrella Bank Instrument will be used to replace lost aquatic resources that result from
Department of the Army (DA) permits issued for the discharge of dredged or fill material into
waters of the United States. If a final Umbrella Bank Instrument is approved, the Corps of
Engineers will authorize the construction of this first mitigation site described below and all
subsequent mitigation project sites proposed by the sponsor in the service area described in the
Umbrella Bank Instrument using Nationwide Permit (NWP) No. 27, Aquatic Habitat
Restoration, Establishment and Enhancement Activities.
The Prospectus, for this proposed Umbrella Bank Instrument, is available for review at:
http://www.nwk.usace.army.mil/Media/PublicNotices.aspx. Please review the Prospectus for
this proposed Umbrella Bank Instrument and provide comments to: U.S. Army Corps of
Engineers, Kansas City District, Regulatory Branch, 601 East 12th Street, Room 402, Kansas
City, Missouri 64106, ATTN: Justin Hughes. Please include the Corps of Engineers permit
number (NWK-2015-02320) in your comment letter.
The first compensatory mitigation site proposed under the Umbrella Bank is the Blue Branch
Wetland and Stream Mitigation Site # 1 (Blue Branch Mitigation Site # 1).
APPLICANT/SPONSOR: Swallow Tail, LLC
24820 Miller Road
Harrisonville, Missouri 64701
UMBRELLA BANK SERVICE AREA: The proposed service area for the Umbrella Bank is
comprised of the Central Plains/Blackwater/Lamine Ecological Drainage Unit located entirely
within Missouri. The boundaries of the service area are shown in Figure 3 of the Umbrella Bank
Prospectus. The Blue Branch Mitigation Site # 1 service area will be the same as the Umbrella
Bank.
PROJECT LOCATION (As shown on the attached drawings): The first mitigation project site,
Blue Branch Mitigation Site #1, is located primarily within the floodplain of Blue Branch, in
Sections 33, 34 and 35, Township 49 North, Range 30 West and in Sections 2 and 3, Township
48 North, Range 30 West, in Jackson County, Missouri.
USGS 1:24K Quad MO-Oak Grove
Approximate Center - Latitude: 39.004491 -- Longitude: -94.204693
The bank sponsor may propose additional mitigation project sites within the boundary of this
proposed service area in order to continue to provide available mitigation credits to DA permit
recipients.
AUTHORITY: Section 404 of the Clean Water Act (33 USC 1344).
MITIGATION ACTIVITIES: Swallow Tail, LLC proposes to establish the first compensatory
mitigation project site, under this proposed Umbrella Bank Instrument, by establishing
(creating), restoring, enhancing and preserving aquatic resources and upland resources on
approximately 172 acres of land adjacent to Blue Branch. In addition, the stream channel grade
will be restored and accelerated bank erosion will be addressed in Blue Branch and other stream
channels on the property using various stream restoration methods. Most of the land area
consists of forested riparian corridor adjacent to Blue Branch. The eastern portion of the
property consists of approximately 36 acres of agricultural land which includes a large farmed
wetland which will be restored. The sponsor proposes to cease farming the agricultural land and
then maintain the constructed mitigation areas in perpetuity.
Mitigation Site #1 will be owned by Habitat Missouri, LLC and Terra Foundation, Inc. The
sponsor proposes to maintain the property, in perpetuity, as wildlife habitat for both aquatic and
for terrestrial species. The Sponsor, in partnership with the City of Grain Valley Parks and
Recreation Department, plans to create a permanent trail system within the property. The trail
will be excluded from the mitigation site and no mitigation credit will be awarded for portions of
the property where the trail is constructed.
The sponsor proposes to place a conservation easement on the property in order to restrict the
use and the activities that are allowed to take place on the mitigation land. The sponsor proposes
to grant the conservation easement to the Midwest Mitigation Oversight Association (MMOA)
in order to assure the sponsor and any subsequent owner complies with the easement
stipulations. The MMOA has been approved by the Kansas City District, Corps of Engineers, to
hold easements on compensatory mitigation sites. As a grantee, the MMOA is responsible for
enforcing the stipulations of the conservation easement in perpetuity. Any fees associated with
the perpetual easement are strictly negotiated between the sponsor and the easement grantee.
The sponsor will be responsible for the development and the implementation of the construction
work plan and the adaptive management plan, if necessary, to achieve performance standards.
When described performance standards are met at the mitigation project site, the mitigation
credits become eligible to be released and can then be sold to DA permit recipients. The sponsor
is also responsible for the long-term management plan and will maintain the created habitats in
perpetuity. Financial assurances, for construction and for long-term management, will be
provided by means of an irrevocable Letter of Credit (LOC) from an FDIC member financial
institution. The Corps must approve the monetary value of the LOC for both construction of the
project and for the long-term management of the site.
WETLANDS/AQUATIC HABITAT: The Corps of Engineers is in the process of preparing an
approved jurisdictional determination for the existing streams and wetlands located within Blue
Branch Mitigation Site #1. The attached jurisdictional assessment prepared by the delineation
consultant shows 11.69 acres of wetlands, 1,939 linear feet of ephemeral stream, 1,874 linear
feet of intermittent stream and 17,331 linear feet of perennial stream. The site also contains
approximately 9.38 acres of open water ponds. The surrounding area consists mostly of
residential development, a high school and a small amount of commercial development.
APPLICANT'S STATEMENT OF AVOIDANCE, MINIMIZATION, AND
COMPENSATORY MITIGATION FOR UNAVOIDABLE IMPACTS TO AQUATIC
RESOURCES: As part of the establishment and the operation of the Umbrella Bank, the
sponsor shall avoid and minimize all impacts to jurisdictional waters to the maximum extent
possible unless the impact is determined by the Corps to be necessary or desirable for habitat or
aquatic ecosystem function improvement. The overall purpose of the project is to restore aquatic
resources to serve as replacement of aquatic resources lost from the issuance of DA permits.
Should placement of fill material into jurisdictional waters be determined to be necessary, or
desirable, as part of the Bank's design, the sponsor shall submit a DA permit application to the
Corps for review. Mitigation activities within waters of the United States will be authorized by
Nationwide Permit No. 27.
ADDITIONAL INFORMATION: Additional information about this application may be
obtained by contacting Mr. Justin W. Hughes, U.S. Army Corps of Engineers, Kansas
City District, Regulatory Branch, 601 East 12th Street, Kansas City, Missouri 64106, telephone:
816-389-3211 or email: justin.w.hughes@usace.army.mil. All comments to this public notice
must be directed to Mr. Hughes and contain the project number (NWK-2015-02320).
CULTURAL RESOURCES: Kansas City District will comply with the National Historic
Preservation Act of 1966 and 36 CFR 800. We have checked the National Register of Historic
Places (NRHP) and the Federal Register and no property listed in the Register or proposed for
listing is located in the vicinity of Blue Branch Mitigation Site #1. The mitigation site has been
surveyed resulting in the discovery of one archeological site. It was the investigators
recommendation that the site was not eligible for listing on the NRHP. The report was
coordinated with the Missouri Department of Natural Resources State Historic Preservation
Office (SHPO Log Number (152-JA-13). This is the extent of our knowledge about historic
properties in the permit area at this time. However, we will evaluate input by the State Historic
Preservation Officer, Tribal Historic Preservation Officers (or Tribe designated representative)
and the public in response to this public notice, and we may require additional surveys of the
permit area to check for unknown historic properties, if warranted.
ENDANGERED SPECIES: In compliance with the Endangered Species Act, a preliminary
determination has been made that the described work will not affect species designated as
threatened or endangered or adversely affect critical habitat. In order to complete our evaluation
of this activity, comments are solicited from the U.S. Fish and Wildlife Service and other
interested agencies and individuals.
FLOODPLAINS: This activity is being reviewed in accordance with Executive Order 11988,
Floodplain Management, which discourages direct or indirect support of floodplain development
whenever there is a practicable alternative. By this public notice, comments are requested from
individuals and agencies that believe the described work will adversely impact the floodplain.
WATER QUALITY CERTIFICATION: Section 401 of the Clean Water Act (33 USC 1341)
requires that all discharges of dredged or fill material must be certified by the appropriate state
agency as complying with applicable effluent limitations and water quality standards. The
discharge must be certified before a Department of the Army permit can be issued. Certification,
if issued, expresses the state's opinion that the discharge will not violate applicable water quality
standards. Any activities within waters of the United States associated with construction of the
mitigation bank will be verified under NWP No. 27, Aquatic Habitat Restoration, Establishment
and Enhancement Activities. The Missouri Department of Natural Resources has issued water
quality certification for NWP No. 27.
PUBLIC INTEREST REVIEW: The decision to authorize the Umbrella Bank Instrument and
issue a permit authorizing construction of the Bank will be based on an evaluation of the
probable impact including the cumulative impacts of the proposed activity on the public interest.
That decision will reflect the national concern for both protection and utilization of important
resources. The benefits which reasonably may be expected to accrue from the proposal must be
balanced against its reasonably foreseeable detriments. All factors which may be relevant to the
proposal will be considered including the cumulative effects thereof; among those are
conservation, economics, esthetics, general environmental concerns, wetlands, cultural values,
fish and wildlife values, flood hazards, floodplain values, land use, navigation, shoreline erosion
and accretion, recreation, water supply and conservation, water quality, energy needs, safety,
food and fiber production, mineral needs and, in general, the needs and welfare of the people.
The evaluation of the impact of the activity on the public interest will include application of the
guidelines promulgated by the Administrator, Environmental Protection Agency under authority
of Section 404(b) of the Clean Water Act (33 USC 1344). The Corps of Engineers is soliciting
comments from the public; Federal, state, and local agencies and officials; Indian Tribes; and
other interested parties in order to consider and evaluate the impacts of this proposed activity.
Any comments received will be considered by the Corps of Engineers to determine whether to
issue, modify, condition or deny a permit for this proposal. To make this decision, comments are
used to assess impacts on endangered species, historic properties, water quality, general
environmental effects, and the other public interest factors listed above. Comments are used in
preparation of an Environmental Assessment and/or an Environmental Impact Statement
pursuant to the National Environmental Policy Act. Comments are also used to determine the
need for a public hearing and to determine the overall public interest of the proposed activity.
COMMENTS: This notice is provided to outline details of the above-described activity so this
District may consider all pertinent comments prior to determining if issuance of a permit would
be in the public interest. Any interested party is invited to submit to this office written facts or
objections relative to the activity on or before the public notice expiration date. Comments both
favorable and unfavorable will be accepted and made a part of the record and will receive full
consideration in determining whether it would be in the public interest to issue the Department of
the Army permit. Copies of all comments, including names and addresses of commenters, may
be provided to the applicant. Comments should be mailed to the address shown on page 3 of this
public notice.
PUBLIC HEARING: Any person may request, in writing, prior to the expiration date of this
public notice, that a public hearing be held to consider this application. Such requests shall state,
with particularity, the reasons for holding a public hearing.
APPLICATION NO. NWK-2015-2320
SWALLOW TAIL, LLC
BLUE BRANCH WETLAND AND STREAM MITIGATION SITE #1
JACKSON COUNTY, MISSOURI
SHEET 1 OF 4
DATED 13 APRIL 2016
APPLICATION NO. NWK-2015-2320
SWALLOW TAIL, LLC
BLUE BRANCH WETLAND AND STREAM MITIGATION SITE #1
JACKSON COUNTY, MISSOURI
SHEET 2 OF 4
DATED 13 APRIL 2016
APPLICATION NO. NWK-2015-2320
SWALLOW TAIL, LLC
BLUE BRANCH WETLAND AND STREAM MITIGATION SITE #1
JACKSON COUNTY, MISSOURI
SHEET 3 OF 4
DATED 13 APRIL 2016
APPLICATION NO. NWK-2015-2320
SWALLOW TAIL, LLC
BLUE BRANCH WETLAND AND STREAM MITIGATION SITE #1
JACKSON COUNTY, MISSOURI
SHEET 4 OF 4
DATED 13 APRIL 2016