Home

St. Louis District

Run scraper

Ed Zigorowicz

Basic information

Fill out these two fields at minimum.

— or —

How Big?

Where?

Links to source documents

Raw text

You can copy from here when filling out the rest of the page.

The applicant seeks authorization to conduct grading and piping operations within waters of the United States to enclose an unnamed intermittent and ephemeral tributary of the Meramec River, for the purpose of a residential development. The project site is on an 8.6-acre tract comprised of woodlands within an upland topography. The site contains two drainages which bisect the site, flowing from northeast to southwest, located in between Hawkins Fuchs Road and Interstate 55, in the City of St. Louis, Missouri. Project impacts include the piping enclosure of an unnamed intermittent and ephemeral tributary, consisting of 910 lineal feet of channel. This will facilitate residential lots, road crossings, and storm water discharge points. Written comments must be submitted by replying to this email or by mailing your comments to the address shown in the signature block, below. The Public Notice comment period opens on April 14, 2016, and closes on May 5, 2016.

The applicant seeks authorization to conduct grading and piping operations within waters of the United States to enclose an unnamed intermittent and ephemeral tributary of the Meramec River, for the purpose of a residential development. The project site is on an 8.6-acre tract comprised of woodlands within an upland topography. The site contains two drainages which bisect the site, flowing from northeast to southwest, located in between Hawkins Fuchs Road and Interstate 55, in the City of St. Louis, Missouri. Project impacts include the piping enclosure of an unnamed intermittent and ephemeral tributary, consisting of 910 lineal feet of channel. This will facilitate residential lots, road crossings, and storm water discharge points. Written comments must be submitted by replying to this email or by mailing your comments to the address shown in the signature block, below. The Public Notice comment period opens on April 14, 2016, and closes on May 5, 2016.

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas