The applicant proposes to construct two groins.
Full Public Notice Project Plans Work Plans
The applicant proposes to construct two groins, the East
groin and the West groin, and to increase beach fill retention while limiting
down drift impacts. The proposed East
groin structure would be constructed approximately 60 feet southwest of Texas
State Highway 332, and would extend 300 feet seaward of current mean sea level
(MSL) perpendicular to the natural shoreline.
The West groin would be constructed approximately 150 feet east of Texas
Street and would extend approximately 325 feet seaward of current MSL at an
angle of 22.5° west of shore normal. The
West groin would be constructed in conjunction with or after the completion of
the East groin. There will be 1,650
cubic yards of fill material, in the form of rock breakwaters, placed within
9,630 square feet of jurisdictional areas.
The total project footprint covers 1.7 acres, of which 64,745 square
feet is landward of the mean higher high water line.