DREDGING, BULKHEAD AND SLIP EXPANSION IN TERREBONNE PORT COMMISSION SLIP IN TERREBONNE PARISH

NAME OF APPLICANT: Terrebonne Port Commission, PO Box 6097, Houma, LA 70361

LOCATION OF WORK: In the Terrebonne Port Commission Slip off of the Houma Navigation Canal, Section 12, T17S-R17E, in Houma, Louisiana, in Terrebonne Parish, within the West Central Louisiana Coastal in hydrologic unit (HUC 08090302), as shown on the attached drawings (Latitude 29.561341 N, Longitude -90.698734 W).

CHARACTER OF WORK: The applicant has requested Department of the Army authorization to install 11,460 linear feet of bulkhead and dredge approx. 125,500 cubic yards of material from approx. 6.23 acres of Traditionally Navigable Waters of the US in order to improve and expand the Terrebonne Port Commission Slip. Suitable dredged material will be utilized on-site as backfill for the proposed and previously existing bulkhead. Excess dredged material will be placed at two on-site spoil bank locations totaling approx. 86.7 acres of jurisdictional wetlands which have been previously permitted for spoil placement and for which compensatory mitigation has been collected per MVN-1997-00175-CT. The proposed project is situated on an approximately 390 acres of which approx. 60 acres are Traditionally Navigable Waters of the US and approx. 105 acres are jurisdictional wetlands which have been previously authorized for the deposition of dredged material. It is anticipated that the proposed action would have minimal impact on adjacent wetlands.

It is presumed that the applicant has designed the project to avoid and minimize direct and secondary adverse impacts to the maximum extent practicable. All discharge of dredged material will be placed in previously authorized spoil placement locations. The applicant proposes to avoid additional direct impacts and minimize secondary impacts to wetlands by remaining within the footprint of the previously authorized project site.

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas