You can copy from here when filling out the rest of the page.
The purpose of this Public Notice is to inform the public that the Pennsylvania State Programmatic General Permit-5 (PASPGP-5) has been issued for a 5-year period. The PASPGP-5 will be implemented and in full effect in the applicable portions of the Commonwealth of Pennsylvania on July 1, 2016. POC Mrs. Patricia Strong, U.S. Army Corps of Engineers, Baltimore District, 10 South Howard Street, Baltimore, Maryland 21201 or by e-mail at pat.strong@usace.army.mil. NOTE: A State 401 Water Quality Certification and a Federal Coastal Zone Management Act Consistency Determination (for activities located within the designated Coastal Zone Management Area) issued by PADEP, are required pursuant to PASPGP-5, Part VI, A, 31, and must be obtained prior to commencing construction of the project.
Public Notice
U.S. Army Corps of Engineers
May 2, 2016
Special Public Notice # SPN 16-22
Baltimore District Philadelphia District Pittsburgh
District
This Public Notice is issued jointly by the
Baltimore, Philadelphia, and Pittsburgh Districts of the U.S. Army Corps of
Engineers and can be viewed on the Baltimore District's web page at: http://www.nab.usace.army.mil/Missions/Regulatory/PublicNotices.aspx
The
purpose of this Public Notice is to inform the public that the Pennsylvania
State Programmatic General Permit-5 (PASPGP-5) has been issued for a 5-year
period by Colonel Edward P. Chamberlayne, Lieutenant Colonel Michael A. Bliss,
and Colonel Bernard R. Lindstrom of the Baltimore, Philadelphia, and Pittsburgh
Districts respectively. The PASPGP-5
will be implemented and in full effect in the applicable portions of the
Commonwealth of Pennsylvania on July 1, 2016.
The
PASPGP-5 can be viewed on the Baltimore District's web page at http://www.nab.usace.army.mil/Missions/Regulatory/PermitTypesandProcess.aspx A hard copy of the proposed PASPGP-5 may be
obtained by contacting: Mrs. Patricia
Strong, U.S. Army Corps of Engineers, Baltimore District, 10 South Howard
Street, Baltimore, Maryland 21203, telephone (410) 962-1847, or by email at
Pat.Strong@usace.army.mil.
On
September 29, 2015, the Corps issued Special Public Notice 15-60 requesting
comments on whether to issue, for a 5-year period, the PASPGP-5. Following a thorough review of all comments
received in response to the Special Public Notice, the Corps has decided to
issue the PASPGP-5.
Below
is a list of some of the changes from the Pennsylvania State Programmatic
General Permit - 4 (PASPGP-4) to PASPGP-5:
In general, Category I and II
Activities under PASPGP-4 are called Non-Reporting Activities under PASPGP-5,
and Category III Activities under PASPGP-4 are called Reporting Activities
under PASPGP-5;
Activities NOT eligible for PASPGP-5:
Single and complete projects
that will result in a permanent loss of more than
1,000 linear feet of a stream
(Part Ill, (A)(3)); and
The Delaware River, downstream
of the U.S. Route 202 Bridge at New Hope, Pennsylvania (Part III, (A)(5). The limit of eligibility has been reduced;
The following Category III Activities under PASPGP-4 are Non-Reporting Activities
under PASPGP-5:
Some activities authorized by PADEP GP-1, Fish Habitat Enhancement Structures (Part IV,
(A)(1)); and
Some activities waived at 25 PA Code
§ 105.12(a)(2) – Waiver 2 – Water Obstructions in a Stream or Floodway With a
Drainage Area of 100 Acres or Less (250 linear feet of permanent impact to
streams and/or rivers must be submitted to the Corps
as a Reporting Activity)
(Part IV, (A)(13));
If PADEP determines that an application
is a Reporting Activity, and PADEP is processing other Non-Reporting
applications which are needed for the work associated with the reporting
application to function and meet its intended purpose, then all such related
applications are sent to the Corps as Reporting. Likewise, if the Corps is reviewing a
Reporting application and PADEP receives an application for related work that
relies on the activities being reviewed by the Corps to function and meet its
intended purpose, then the newly received application received by PADEP is a
Reporting Activity. (Part IV, (B)(16));
Reporting Activities – In most cases, applications for activities where a single and complete project involves one or
more of the of the following will be sent to the Corps as a
Reporting Activity:
Impacts to more than 0.50 acre of waters of the
United States, including jurisdictional wetlands. The 0.50 acre impact includes all attendant
features, both temporary and permanent (Part IV, (B)(2));
Permanent conversion of greater than 0.10 acre
of forested and/or scrub-shrub wetlands in association with the regulated
activity (Part IV, (B)(2));
A utility
line crossing of waters and/or wetlands that exceeds 500 linear feet (excluding overhead lines)
(Part IV, (B)(3));
A buried utility line placed within a jurisdictional area and the utility
line runs parallel
to or along the stream
located within that jurisdictional area (Part IV, (B)(3));
Activities
proposing temporary impacts for greater then a one year period (Part IV,
(B)(18)); and
Greater than 250 linear feet of permanent
stream impact, with the following exceptions (Part IV, (B)(2)):
500 linear feet or less threshold applies for those activities
that involve stream
bank stabilization, stream rehabilitation, stream protection and/or enhancement; and
No
linear threshold applies
for those activities verified under GP-1 for Fish and
Habitat Enhancement Structures) and/or activities waived at 25 PA Code § 105.12(a)(16) - Waiver 16 -
Restoration Activities), which have been reviewed and approved by the
Environmental Review Committee;
PADEP will review permit
application(s) and identify single and complete project(s) to determine if the
application/registration(s) is Reporting or Non-Reporting to the Corps. Threshold calculations to determine if a
Corps review is required are based on the impacts of a single and complete
project, and not on the overall project as utilized in the PASPGP-4. If an application consists of multiple single
and complete projects, and any one of the single and complete projects requires
a Corps review, then the entire application/registration is sent to the Corps
as a Reporting Activity, (Part IV, (B)(16));
Monitoring is required for temporary
impacts to wetlands that exceeds 0.10 acre (Part VI, (A)(23)). Monitoring would be completed using a
standardized monitoring form which will be available on the Corps website at: http://www.nab.usace.army.mil/Missions/Regulatory/PermitTypesandProcess.aspx The monitoring
requirement may be waived after Corps consideration of a written request from
the applicant; or the monitoring requirement may be superseded if the Corps
determines more stringent monitoring is required and incorporates the
requirement as a Special Condition of a PASPGP-5 verification;
A list of waterways requiring
time-of-year restrictions has been added (Part VI, (A)(34));
Conservation measures for the
Atlantic and Shortnose Sturgeon have been added (Part VI, (A)(35)); and
Grandfathered Activities (Part IV,
(A)(30)):
All activities previously authorized as a
Category I or II Activity under
PASPGP-4 that meet the PASPGP-5 Non-Reporting criteria and comply with all
terms, conditions, limits, and best management practices identified and
required by PASPGP-5 and the applicable PADEP authorizations, are reauthorized
by the PASPGP-5 without further notice to the applicable Corps District. The duration of these authorizations will be for
the term of PASPGP-5 (June 30, 2021) or applicable PADEP Chapter 105
authorization, whichever is less.
All activities previously authorized as a
Category I or II Activity under
PASPGP-4 that do not meet the
PASPGP-5 Non-Reporting criteria, or do not
comply with all terms, conditions, limits, and best management practices
identified and
required by
the PASPGP-5, are not automatically authorized by the PASPGP-5. These projects must be submitted to the
applicable Corps District to determine if the project qualifies for the
PASPGP-5.
All activities previously verified as a
Category III Activity under PASPGP-4 that comply with all terms, conditions,
limits, and best management practices identified and required by the PASPGP-5
and the applicable PADEP authorizations, are authorized by the PASPGP-5 without
further notice to the applicable Corps District. In addition, all special conditions attached
to the original PASPGP-4 verification are special conditions for the PASPGP-5
authorization. The duration of the
authorization is for five years from issuance of the PASPGP-4 verification or
when the applicable PADEP Chapter 105 authorization expires, whichever is less.
Please note, any request for
modification of the authorized work and/or special conditions must be submitted
in writing to the applicable Corps District. Previous PASPGP-4 verifications, identified in
Non-Reporting Activity 30 (c), will only be considered a Reporting Activity
under Part IV, B, 5(d) and 17.
Due to changes in Reporting/Non-Reporting
Activities (Category I, II, and III under PASPGP-4) and eligibility limitations
(greater than 1000 linear feet of permanent loss of stream channel(s), work in
Delaware River downstream of the U.S. 202 Bridge at New Hope, PA., etc.) in the
PASPGP-5, it is recommended that permittees contact their appropriate Corps
District for further guidance regarding the applicability of the Grandfathered
Activities.
The decision to issue the PASPGP-5, with
the above modifications, was made after a thorough evaluation of the probable
impacts including cumulative impacts of the proposed PASPGP-5 on the public
interest. This decision reflects the
national concern for the protection and utilization of important resources. The benefit which reasonably may be expected
to accrue from the proposal was balanced against its reasonably foreseeable
detriments. All factors which may be
relevant to the proposal were considered, including the cumulative effects
thereof; conservation, economics, aesthetics, general environmental concerns,
wetlands, cultural resources, fish and wildlife resources, flood hazards,
floodplain functions, land use, navigation, shoreline erosion and accretion,
recreation, water supply and conservation, water quality, energy needs, safety,
food and fiber production, and, in general, the needs and welfare of the
people.
A Water Quality Certification (WQC) from
the Pennsylvania Department of Environmental Protection is required, in
accordance with Section 401 of the Clean Water Act, for any activity that would
be authorized by PASPGP-5 and involves the discharge of dredged and/or fill
material into waters of United States, including wetlands. The Corps has requested WQC for activities
authorized by the PASPGP-5 from PADEP and is awaiting their decision.
Coastal Zone Certification, in accordance
with the Pennsylvania Coastal Zone Program, is required for activities to be
authorized by the PASPGP-5. The Corps
has requested Coastal Zone Management consistency for activities authorized by
the PASPGP-5 from PADEP and is awaiting their decision.
The PASPGP-5 processing procedures and
conditions ensure that potential impacts on the public interest, resulting from
the work authorized by the PASPGP-5, include implementation of the guidelines
promulgated by the Administrator, U.S. Environmental Protection Agency, under
authority of Section 404 of the Clean Water Act.
State authorization under PADEP’s Chapter
105 regulations is required for most activities to be authorized by the
PASPGP-5.
The PASPGP-5 processing procedures and
conditions ensure compliance with Section 7 of the Endangered Species Act, as
amended, and with Section 106 of the National Historic Preservation Act.
The PASPGP-5 processing procedures and
conditions ensure compliance with Executive Order 13175, through coordination
with Tribal Nations. Such coordination
shall be performed in accordance with the applicable Corps District's tribal
coordination procedures.
Section 7(a) of the Wild and Scenic Rivers
Act (16 U.S.C. 1278 et seq.) provides that no department or agency of the
United States shall assist by loan, grant, license, or otherwise in the
construction of any water resources project that would have a direct and
adverse effect on the values for which such river was established, as
determined by the Secretary charged with its administration. PASPGP-5 processing procedures and conditions
ensure that authorized work will result in no more than minimal adverse effects
on any designated Wild and Scenic River pursuant to the Wild and Scenic Rivers
Act, as amended.
The Magnuson-Stevens Fishery Conservation
and Management Act, as amended by the Sustainable Fisheries Act 1996 (Public
Law 104-267), requires all Federal agencies to consult with the National Marine
Fisheries Service on all actions, or proposed actions, permitted, funded, or
undertaken by the agency that may adversely affect Essential Fish Habitat
(EFH). PASPGP-5 processing procedures
and conditions ensure that the required consultation procedures are completed,
or that the authorized work will result in no more than minimal adverse effects
on EFH pursuant to the Magnuson-Stevens Fishery Conservation and Management Act
as amended.
Since the PASPGP-5 is duplicative of some
Nationwide Permits (NWPs) and offers a more simplified and streamlined
regulatory process, those NWPs suspended in Baltimore District’s Special Public
Notice 12-32, dated March 19, 2012, remain suspended. This Public Notice is available on the
Baltimore District website at http://www.nab.usace.army.mil/Missions/Regulatory/PublicNotices.aspx
If
you have any questions concerning this matter, please call Mr. Wade Chandler,
Chief Pennsylvania Section, Regulatory Branch at telephone number (814)
235-0572.
Beth
Bachur
Acting
Chief, Regulatory Branch
Baltimore District