Home

Galveston District

Run scraper

Hilcorp Energy Company

Basic information

Fill out these two fields at minimum.

— or —

How Big?

Where?

Links to source documents

Raw text

You can copy from here when filling out the rest of the page.

The applicant proposes to drill multiple carbon dioxide injection and secondary recovery oil and gas wells from 8 pad locations.

Full Public Notice Project Plans

The applicant proposes to drill multiple carbon dioxide injection and secondary recovery oil and gas wells from 8 pad locations. Well pads will be constructed in 3 phases. Each construction phase includes a proposed road, refurbishment, and the installation of 12-foot elevated pipe racks above the marsh, alongside existing roads. Phase 1 would result in the displacement of approximately 2 acres of tidally-influenced wetlands and 5.84 acres of open water. Phase 2 would result in the displacement of approximately 2.2 acres of tidally-influenced wetlands and 1.89 acres of open water. Phase 3 would result in the displacement of approximately 1.63 acres of wetlands and 0.29 acre of open water.

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas