Proposed Reissuance of General Permit GP-38M - Shoreline Development Activities - Lake of the Ozarks
In accordance with Title 33 CFR 325.2 and 325.7(e), as published in the November 13, 1986, Federal Register; the U.S. Army Corps of Engineers, Kansas City District, in cooperation with Ameren Missouri, proposes to reissue existing general permit GP-38M. The general permit authorizes various shoreline development activities including excavation, dredging, construction and fill activities, structures, bank stabilization, and additional work.
Proposed Reissuance of General Permit GP-38M - Shoreline Development Activities - Lake of the Ozarks
In accordance with Title 33 CFR 325.2 and 325.7(e), as published in the November 13, 1986, Federal Register; the U.S. Army Corps of Engineers, Kansas City District, in cooperation with Ameren Missouri, proposes to reissue existing general permit GP-38M. The general permit authorizes various shoreline development activities including excavation, dredging, construction and fill activities, structures, bank stabilization, and additional work.
PUBLIC NOTICE
Permit No. NWK-GP-38M
(2005-1994)
Issue Date: May 11, 2016
Expiration Date: June 1, 2016
US Army Corps
of Engineers
Kansas City District
21-Day Notice
LAKE OF THE OZARKS
PROPOSED REISSUANCE OF GENERAL PERMIT 38M
SHORELINE DEVELOPMENT ACTIVITIES
In accordance with Title 33 CFR 325.2 and 325.7(e), as published in the November 13, 1986,
Federal Register; the U.S. Army Corps of Engineers, Kansas City District, in cooperation
with Ameren Missouri, proposes to reissue existing General Permit 38 Missouri, (GP-38M,
GP). The reissuance would extend the GP authorization for an additional 5 years; from
July 1, 2016 until June 30, 2021. Changes to the permit include minor formatting and
clarification. During the current 5 year authorization period from July l, 2011 to present,
4,198 GP verifications have been issued.
This public notice is issued jointly with the Missouri Department of Natural Resources, Water
Protection Program (MDNR, WPP). The MDNR, WPP will use the comments to this notice
in deciding whether to grant Section 401 water quality certification. Commenters are
requested to furnish a copy of their comments to the Missouri Department of Natural
Resources, Water Protection Program, P.O. Box 176, Jefferson City, Missouri 65102.
AMEREN MISSOURI: Ameren Missouri, under Article 41 of its Federal Energy
Regulatory Commission (FERC) license, issues permits for use and occupancy of project
lands and waters. Ameren Missouri owns the majority of the shoreline property around the
lake and in most locations possesses flowage easements extending beyond the property line.
Commenters are requested to furnish a copy of their comments to Ameren Missouri,
Shoreline Management Office, 3 Willmore Lane, P.O. Box 993, Lake Ozark, Missouri
65049.
APPLICANT: General Public.
PROJECT LOCATION: Lake of the Ozarks (Lake), lakeward of the ordinary high water
mark (OHWM), elevation 658.5 feet, Union Electric Datum (UED); in Benton, Camden,
Miller, and Morgan Counties, Missouri. Work in adjacent wetlands and in tributaries of the
Lake, landward/upstream of elevation 662 feet, UED is not authorized by this GP.
AUTHORITY: Section 10 of the Rivers and Harbors Act of 1899 (33 USC 403) and Section
404 of the Clean Water Act (33 USC 1344).
ACTIVITY: The GP authorizes various shoreline development activities including
excavation, dredging, construction and fill activities, structures, bank stabilization, and
additional work as stated in the enclosed GP.
ADDITIONAL INFORMATION: Additional information about the proposed reissuance of
the GP may be obtained by contacting Mr. Mel B. Stanford, U.S. Army Corps of Engineers,
Truman Regulatory Satellite Office, 15837 Truman Road, Warsaw, Missouri 65355; telephone
816-389-3981, FAX 660-438-6909, or e-mail at mel.b.stanford@usace.army.mil. All comments
to this public notice should be directed to the above address.
APPLICATION PROCEDURE AND CRITERIA FOR AUTHORIZATION: Under the
provisions of GP-38M, applications should be sent only to Ameren Missouri. Ameren
Missouri will review each application on a case-by-case basis, and where the proposed project
meets the limits and conditions of the GP, Ameren Missouri will provide written verification.
While there is no fee for a Corps of Engineers (Corps) GP verification, Ameren Missouri will
collect a fee for its permit approval under the provisions of its FERC license. If a proposed
project exceeds the limits of the GP, Ameren Missouri will forward the application to the
Corps for individual permit review. Persons wishing to conduct various shoreline
development activities including excavation, place fill material, or perform other construction
activities in the Lake, depending upon the scope of the project, may be required to submit
written applications and obtain written approval in advance, individually, from the Corps,
Ameren Missouri, and MDNR, WPP.
The Corps and Ameren Missouri have developed a Standard Operating Procedure (SOP) for
the implementation of the GP. The SOP includes a list of all information that must be
provided by applicants requesting authorization under the GP. Under the SOP, no authority
reserved exclusively for the Corps under Federal regulations 33 CRR 320-331, will be
delegated to Ameren Missouri.
PUBLIC INTEREST REVIEW: The decision to reissue this GP will be based on an
evaluation of the probable impact including the cumulative impacts of the proposed activity
on the public interest. That decision will reflect the national concern for both protection and
utilization of important resources. The benefits which reasonably may be expected to accrue
from the proposal must be balanced against its reasonably foreseeable detriments. All factors
which may be relevant to the proposal will be considered including the cumulative effects
thereof; among those are conservation, economics, esthetics, general environmental concerns,
wetlands, cultural values, fish and wildlife values, flood hazards, floodplain values, land use,
navigation, shoreline erosion and accretion, recreation, water supply and conservation, water
quality, energy needs, safety, food and fiber production, mineral needs and, in general, the
needs and welfare of the people.
COMMENTS: This notice is provided to outline details of the above-described GP
reissuance so this District may consider all pertinent comments prior to determining if the
proposed actions would be in the public interest. Any interested party is invited to submit to
this office written facts or objections relative to the proposed actions on or before the public
notice expiration date. Comments both favorable and unfavorable will be accepted and made a
part of the record and will receive full consideration in determining whether it would be in the
public interest to reissue the GP. All comments in response to the public notice should be
forwarded to the addresses provided above.
PUBLIC HEARING: Any person may request, in writing, prior to the expiration date of this
public notice, that a public hearing be held to consider the proposed reissuance of the GP.
Such requests shall state, with particularity, the reasons for holding a public hearing.
Enclosure
DEPARTMENT OF THE ARMY PERMIT
Permittee General Public
Permit No. NWKGP-38M, Shoreline Development Activities
Issuing Office U.S. Army Engineer District, Kansas City
NOTE: The term "you" and its derivatives, as used in this permit, means the permittee or any future transferee. The
term "this office" refers to the appropriate district or division office of the Corps of Engineers having jurisdiction
over the permitted activity or the appropriate official of that office acting under the authority of the commanding
officer.
You are authorized to perform work in accordance with the terms and conditions specified below, and with the plans
and drawings attached hereto which are incorporated in and made a part of this permit.
Project Description; Proposed and/or Completed Work: The excavation and/or discharge of dredged or
fill material for the following structures or projects, including the structures, subject to the general and
special conditions of this General Permit (GP), and the criteria in the attached appendices: Bulkheads/Sea
Walls and Bank Stabilization (Appendix I); Boat Ramps (Appendix II); Miscellaneous Structures and
Activities (Appendix III); Dredging/Excavation for Docks, Access Channels, and Structures (Appendix
IV); Utilities (Appendix V); Fish Habitat (Appendix VI); Sediment and Debris Removal (Appendix VII).
Project Location: Lake of the Ozarks (Lake), lakeward of the ordinary high water mark (OHWM),
elevation 658.5 feet Union Electric datum (UED); in Benton, Camden, Miller, and Morgan Counties,
Missouri. Work in adjacent wetlands and in tributaries of the Lake, landward/upstream of elevation
662 feet UED, is not authorized by this GP.
Permit Conditions:
General Conditions:
1. The time limit for completing the work authorized ends on 2 years from each permit verification. If you find that
you need more time to complete the authorized activity, submit your request for a time extension to this office for
consideration at least one month before the above date is reached.
2. You must maintain the activity authorized by this permit in conformance with the terms and conditions of this
permit. You are not relieved of this requirement if you abandon the permitted activity, although you may make a
good faith transfer to a third party in compliance with General Condition 4 below. Should you wish to cease to
maintain the authorized activity or should you desire to abandon it without a good faith transfer, you must obtain a
modification of this permit from this office, which may require restoration of the area.
3. If you discover any previously unknown historic or archeological remains while accomplishing the activity
authorized by this permit, you must immediately notify this office of what you have found. We will initiate the
Federal and state coordination required to determine if the remains warrant a recovery effort or if the site is eligible
for listing in the National Register of Historic Places.
ENG FORM 1721, Nov 86
EDITION OF SEP 82 IS OBSOLETE
(33 CFR 325 (Appendix A))
4. If you sell the property associated with this permit, you must obtain the signature of the new owner in the space
provided and forward a copy of the permit to this office to validate the transfer of this authorization.
5. If a conditioned water quality certification has been issued for your project, you must comply with the
conditions specified in the certification as special conditions to this permit. For your convenience, a copy of the
certification is attached if it contains such conditions.
6. You must allow representatives from this office to inspect the authorized activity at any time deemed necessary
to ensure that it is being or has been accomplished in accordance with the terms and conditions of your permit.
Special Conditions: See continuation sheets, pages 4, 5 and 6 of this document.
Further Information:
1. Congressional Authorities: You have been authorized to undertake the activity described above pursuant to:
(X) Section 10 of the Rivers and Harbors Act of 1899 (33 U.S.C. 403).
(X) Section 404 of the Clean Water Act (33 U.S.C. 1344).
( ) Section 103 of the Marine Protection, Research and Sanctuaries Act of 1972 (33 U.S.C. 1413).
2. Limits of this authorization.
a. This permit does not obviate the need to obtain other Federal, state, or local authorization required by law.
b. This permit does not grant any property rights or exclusive privileges.
c. This permit does not authorize any injury to the property or rights of others.
d. This permit does not authorize interference with any existing or proposed Federal project.
3. Limits of Federal Liability. In issuing this permit, the Federal Government does not assume any liability for
the following:
a. Damages to the permitted project or uses thereof as a result of other permitted or unpermitted activities or
from natural causes.
b. Damages to the permitted project or uses thereof as a result of current or future activities undertaken by or on
behalf of the United States in the public interest.
c. Damages to persons, property, or to other permitted or unpermitted activities or structures caused by the
activity authorized by this permit.
d. Design or construction deficiencies associated with the permitted work.
e. Damage claims associated with any future modification, suspension, or revocation of this permit.
4. Reliance on Applicant's Data: The determination of this office that issuance of this permit is not contrary to the
public interest was made in reliance on the information you provided.
5. Reevaluation of Permit Decision. This office may reevaluate its decision on this permit at any time the
circumstances warrant. Circumstances that could require a reevaluation include, but are not limited to, the
following:
a. You fail to comply with the terms and conditions of this permit.
b. The information provided by you in support of your permit application proves to have been false, incomplete,
or inaccurate (See 4 above).
c. Significant new information surfaces which this office did not consider in reaching the original public interest
decision.
Such a reevaluation may result in a determination that it is appropriate to use the suspension, modification, and
revocation procedures contained in 33 CFR 325.7 or enforcement procedures such as those contained in 33 CFR
326.4 and 326.5. The referenced enforcement procedures provide for the issuance of an administrative order
requiring you to comply with the terms and conditions of your permit and for the initiation of legal action where
appropriate. You will be required to pay for any corrective measures ordered by this office, and if you fail to
comply with such directive, this office may in certain situations (such as those specified in 33 CFR 209.170)
accomplish the corrective measures by contract or otherwise and bill you for the cost.
6. Extensions. General condition 1 establishes a time limit for the completion of the activity authorized by this
permit. Unless there are circumstances requiring either a prompt completion of the authorized activity or a
reevaluation of the public interest decision, the Corps will normally give favorable consideration to a request for
an extension of this time limit.
Your signature below, as permittee, indicates that you accept and agree to comply with the terms and
conditions of this permit.
GENERAL PUBLIC- SIGNATURE NOT REQUIRED _________________________________
(PERMITTEE)
(DATE)
This permit becomes effective when the Federal official, designated to act for the Secretary of the Army,
has signed below.
__________________________________________ __________________________________
(DISTRICT COMMANDER)
(DATE)
BY: MARK. D. FRAZIER
Chief, Regulatory Branch
When the structures or work authorized by this permit are still in existence at the time the property is transferred,
the terms and conditions of this permit will continue to be binding on the new owner(s) of the property. To
validate the transfer of this permit and the associated liabilities associated with compliance with its terms and
conditions, have the transferee sign and date below.
__________________________________________ __________________________________
(TRANSFEREE)
(DATE)
3
Special Conditions:
a. You must complete, sign and return the attached "Compliance Certification" to the Corps of Engineers
(Corps) after you complete the authorized work and any required mitigation. Your signature will certify that you
completed the work in accordance with this General Permit (GP), including general and specific conditions, and
that any required mitigation was completed in accordance with the GP conditions. If the work completed is less
than that authorized, you must provide a drawing describing the extent of the work completed.
b. If any part of the authorized work is performed by a contractor, before starting work you must discuss the terms
and conditions of this GP with the contractor; and, you must give a copy of this entire GP to the contractor. The
permittee remains responsible for ensuring compliance with all aspects of this GP.
c. You must use clean, uncontaminated materials for fill in order to minimize excessive turbidity by leaching of
fines, as well as to preclude the entrance of deleterious and/or toxic materials into the waters of the United States
by natural runoff or by leaching. Placement of unprotected earthen and gravel fill, broken concrete where more
than 25 percent is 12 inches in diameter or less, concrete rubble with exposed rebar, tires, railroad ties,
vehicles/vehicle bodies, construction/demolition debris, asphalt, and similar materials are not authorized by this
GP.
d. You must dispose of excess concrete and wash water from concrete trucks and other concrete mixing
equipment in a non-wetland area above the ordinary high water mark (OHWM) and at a location where the
concrete and wash water cannot enter the water body or an adjacent wetland area. Excess concrete may not be
used to grout existing riprap or to pave existing shoreline, lakeward of the OHWM, under this GP authorization.
e. You must excavate, dredge and/or fill in the watercourse in a manner that will minimize increases in suspended
solids and turbidity which may degrade water quality and damage aquatic life outside the immediate area of
operation. Also, care must be taken to keep machinery out of the Lake to the maximum extent practicable.
f. You must immediately remove and properly dispose of all debris during every phase of the project in order to
prevent the accumulation of unsightly, deleterious and/or toxic materials in or near the water body.
g. You must not dispose of any construction debris or waste materials below the OHWM, in a wetland area, or at
any location where the materials could be introduced into the water body or an adjacent wetland as a result of
runoff, flooding, wind, or other natural forces. All excavated lakebed sediments must be placed and stabilized at a
location landward of elevation 662.0 feet UED, where the material cannot enter any water body, including
wetlands, by erosion.
h. You must store all construction materials, equipment, and/or petroleum products, when not in use, above
anticipated high water levels, and in such a way that they shall not enter waters of the United States.
i. You must restrict the clearing of timber and other vegetation to the absolute minimum required to accomplish
the work. Clearing, grading and replanting should be planned and timed so that only the smallest area necessary
is in a disturbed, unstable or unvegetated condition.
4
Special Conditions (continued):
j. You must not excavate or discharge fill or dredged material lakeward of the OHWM from March 15 to June 15
unless you obtain written approval in advance from the Corps, Regulatory Branch or Ameren Missouri, as
specified in condition "r" below. In addition, you must excavate during periods of low water levels.
Note: Placement of riprap as a bank stabilization technique (without excavation) is exempted from this rule
unless specifically stated on the project verification sheet.
k. Upon completion of earthwork operations, you must seed, replant or otherwise protect from erosion all fills in
the water or on shore, and other areas on shore disturbed during construction. If seeding does not successfully
vegetate the disturbed areas by the end of the first growing season, you must implement alternate measures, such
as placing riprap, slope terracing with untreated timbers, gabions or concrete blocks, or additional vegetative
plantings, to protect the disturbed areas from further erosion. You must contact the Corps or Ameren Missouri, as
specified in condition "r" below, prior to beginning work on any additional erosion control measures so that a
determination can be made whether further authorization is required.
l. You must not use lumber products treated with pentachlorophenol, creosote, chromate copper arsenate (CCA),
or any similar chemically treated lumber for the construction of any structure in or over the Lake. When
conducting maintenance or repair activities, you must replace any existing wood treated with these products
where there is contact with the lake waters from inundation, wave action or runoff, or encase the material in
concrete such that contact with water is excluded.
m. You must not use the backfill area of the bulkhead/seawall, or any other authorized fill area, for on-site sewage
disposal structures. You must contact the Missouri Department of Natural Resources for current laws and
regulations regarding sewer and septic system installation which may refer you to a local agency for details.
n. All work must be conducted such that it does not interfere with access to and use of any existing authorized
structure. Structures that obstruct or that constitute a hazard to navigation are not authorized by this GP.
o. An Ameren Missouri permit must be obtained for any structure/fill/excavation on projects lands. This GP does
not authorize any structure/fill/excavation for which the Corps or Ameren Missouri previously denied
authorization or for which the structure/fill/excavation is not in compliance with the conditions of a Department
of the Army (DA) permit authorization or verification (Nationwide permit (NWP), GP, Letter of Permission
(LOP), or Standard permit (SP)), or an Ameren Missouri approval (in accordance with Ameren Missouri's
Shoreline Management Guidelines). Such structures/fills/excavations may be subject to enforcement action in
accordance with Ameren Missouri realty rights. Structures/fills/excavations that otherwise would be authorized by
this GP, but that were constructed on the same property in association with, and integral to, any other
unauthorized work (violation), such as unpermitted excavation in the Lake, are not authorized by this GP until the
violation is resolved.
p. No activity is authorized under this GP which is likely to jeopardize the continued existence of a threatened or
endangered species or a species proposed for such designation, as identified under the Federal Endangered
Species Act (ESA), or which is likely to destroy or adversely modify the habitat of such species. Permittees shall
notify the Corps if any listed species or designated critical habitat might be affected or is in the vicinity of the
project, or is located in the designated critical habitat. Authorization of an activity by this GP does not authorize
the "take" of a threatened or endangered species as defined under the ESA. In the absence of a separate
authorization from the U.S. Fish and Wildlife Service, both lethal and non-lethal "takes" of protected species are
in violation of the ESA.
5
Special Conditions (continued):
q. No activity which may affect Historic properties listed, or eligible for listing in the National Register of
Historic Places is authorized, until the District Commander has complied with the provisions of 33 CFR 325,
Appendix C. All prospective permittees must notify the Corps if the activity may have the potential to affect any
historic properties listed, determined to be eligible to be listed, or which the prospective permittee has reason to
believe may be eligible for listing on the National Register of Historic Places, and shall not begin the activity until
notified by the Corps that the requirements of the National Historic Preservation Act have been satisfied and that
the activity is authorized. Information on the location and existence of historic resources can be obtained from the
State Historic Preservation Office and the National Register of Historic Places.
r. You must provide written notification to Ameren Missouri or the Corps, and receive written verification of
authorization by this GP, before you begin any work in the Lake. No existing work is authorized until written
verification is provided by Ameren Missouri or the Corps.
s. Variances from permit conditions and construction criteria may be authorized by this GP at the issuing
authority's discretion, subject to both Ameren Missouri and Corps concurrence to accommodate factors, including
but not limited to, rock outcrops, smooth transitions to adjacent authorized structures or other special site
circumstances. This applies to all appendices.
t. In accordance with the Water Resources Development Act of 1976, the Corps does not regulate floating and
fixed, private and commercial boat docks, and dock mooring cables and access walkways, on the Lake, provided
the docks were placed so as not to interfere with navigation. However, Ameren Missouri approval is required for
all docks at the Lake.
u. Bridges over navigable waters of the United States, such as the Lake, are not regulated under Section 10 of the
Rivers and Harbors Act. However, the discharge of fill material in any water of the United States for bridges
requires Corps authorization under Section 404 of the Clean Water Act. Ameren Missouri approval is required
for all bridges in or over the Lake.
v. The maintenance, repair, and restoration of existing and proposed structures or fill is authorized, including
minor deviations, provided there is no significant change in the structure.
w. Structures completed prior to December 18, 1968, and discharges of dredged or fill material in waters of the
United States prior to July 1, 1977, are authorized by a Nationwide Permit as cited under Activities Occurring
Before Certain Dates (33 CFR 330.3).
x. The permittee understands and agrees that, if future operations by the United States require the removal, relocation,
or other alteration, of the structure or work herein authorized, or if, in the opinion of the Secretary of the Army or his
authorized representative, said structure or work shall cause unreasonable obstruction to the free navigation of the
navigable waters, the permittee will be required, upon due notice from the Corps of Engineers, to remove, relocate, or
alter the structural work or obstructions caused thereby, without expense to the United States. No claim shall be made
against the United States on account of any such removal or alteration.
6
COMPLIANCE CERTIFICATION
Special condition "a" of this permit document requires that you submit a signed certification regarding the
completed work and any required mitigation. This certification page satisfies this condition if it is provided to
the Kansas City District at the address shown at the bottom of this page upon completion of the project.
APPLICATION NUMBER (assigned by Kansas City District or Ameren Missouri): ____________________
APPLICANT NAME: ________________________________________________________________
ADDRESS: _________________________________________________________________________
____________________________________________________________________________________
PROJECT LOCATION: In the Lake of the Ozarks, at lake mile
, Cove/Arm
,
subdivision and lot
; in the NE NW SE SW (CIRCLE ONE) of Section
, Township
north,
Range
west,
County, Missouri.
PRIMARY CONTRACTOR NAME/ADDRESS: _________________________________________
____________________________________________________________________________________
a. I certify that the authorized work was done in accordance with the Corps GP authorization, including any
general or specific conditions.
b. I certify that any required mitigation was completed in accordance with the permit conditions.
c. I certify that I have obtained the required permit(s) from Ameren Missouri.
d. Your signature below, as permittee, indicates that you have completed the authorized project as certified in
paragraphs a and b above.
_______________________________________
(PERMITTEE)
______________________________
(DATE)
List the Name, Address and Telephone No. of all other contractors involved in the project below:
Return this certification to both of the following offices:
U.S. Army Corps of Engineers
Truman Regulatory Satellite Office
15837 Truman Road
Warsaw, Missouri 65355
Ameren Missouri
Shoreline Management Office
3 Willmore Lane, P.O. Box 993
Lake Ozark, Missouri 65049
7
APPENDIX I
Bulkheads/Seawalls and Bank Stabilization
A. EXISTING STRUCTURES and FILL, including but not limited to:
1. The Corps, at its discretion, may investigate any bulkhead/seawall, or other structure or fill that was
placed in the Lake that is unauthorized and resolve the violation according to rules in 33 CFR 326. The
resolution may include in some cases an after-the-fact authorization, area restoration, corrective or
mitigative measures, or legal action. The Corps may also conduct compliance inspections of the project
area.
2. The previous placement of clean rock or riprap in a revetment for bank stabilization, of a size and
quality capable of withstanding expected erosional forces, including minor excavation or grading to
prepare a base for the revetment, is authorized by this GP, provided the work did not fill, drain, or prevent
the flow of water into any adjacent wetlands. Clean concrete rubble that has been broken to a well-graded
mix of pieces with all exposed reinforcing metal removed may be used with or instead of rock.
B. PROPOSED STRUCTURES and FILL, including but not limited to:
1. The proposed placement of clean rock or riprap in a revetment for bank stabilization, of a suitable size
to withstand expected erosional forces, including minor excavation or grading to prepare a base for the
revetment, is authorized by this GP, provided the work will not fill, drain, or prevent the flow of water
into any adjacent wetlands. Clean concrete rubble that has been broken to a well-graded mix of pieces
with all exposed reinforcing metal removed may be used with or instead of rock.
2. Proposed bulkheads/seawalls require a minimum of 24 inches of vertical erosion, constructed such that
the most lakeward face of the footing or wall is no more than 3 feet lakeward of the toe of the bank, and
where the construction will not fill, drain or prevent the flow of water into any adjacent wetlands, are
authorized by this GP.
3. This GP does not authorize any bulkheads/seawalls lakeward of the OHWM, where the walls could be,
using standard construction methods, constructed such that the lakeward toe of the footing is at or above
the OHWM.
4. Minor deviations from criteria 2 and 3 above may be authorized by this GP at the issuing authority's
discretion, subject to both Ameren Missouri and Corps concurrence, to accommodate rock outcrops,
smooth transitions to adjacent authorized structures or other special site circumstances.
5. All approved encroachments lakeward of the OHWM may be subject to the completion of mitigative
measures such as rock blankets, anchored cedar trees or other fish habitat, and/or utilize an approved
mitigation provider as required on the project verification sheet.
APPENDIX II
Boat Ramps
EXISTING and PROPOSED, including but not limited to:
1. Boat ramps or launching tracks constructed of concrete, brick, stone, gravel, and/or similar materials
are authorized by this GP subject to the following criteria:
a. The discharge of fill material or structural components lakeward of the OHWM does not exceed
50 cubic yards of concrete, rock, crushed stone or gravel into forms; precast concrete slabs or
bricks; steel rods, rails, and other approved construction materials. A variance may be authorized.
b. The boat ramp does not exceed 30 feet-wide.
c. No more than one boat ramp is constructed per single family residence or for any single
property having 4 housing units or less (e.g., apartments, condominiums, and extended family
complexes). For larger developments, no more than one boat ramp per 100 linear feet of Lake
frontage is authorized.
d. Excavation is limited to the area necessary for site preparation and all excavated material is
disposed of in an upland area landward of an authorized bulkhead/seawall on the subject property,
or placed and stabilized at a location landward of elevation 662.0 feet UED, such that the material
cannot enter any water body, including wetlands, by erosion.
e. No material is placed in wetlands or shallow water areas of the Lake that typically support
aquatic vegetation for any part of the year.
f. Dredging/excavation to provide access to deeper water from a proposed boat ramp may be
authorized by this GP. Criteria for authorization of dredging/excavation to restore access to
existing boat ramps are in Appendix IV.
g. The boat ramp must be well maintained and monitored for erosive undermining to ensure safe
use. Boat ramps determined to be a hazard must be repaired or removed from the Lake and the
shoreline restored.
h. A variance may be authorized for existing and proposed boat ramps, including but not limited to
consideration for private or commercial use, size, location, and construction materials.
2. All approved encroachments lakeward of the OHWM may be subject to the completion of mitigative
measures such as rock blankets, anchored cedar trees or other fish habitat, and/or utilize an approved
mitigation provider as required on the project verification sheet.
APPENDIX III
Miscellaneous Structures and Activities
EXISTING and PROPOSED, including but not limited to:
1. EXISTING: This GP authorizes, including but not limited to, existing recreational decks, fixed docks,
wharfs, fishing piers/docks, approved handicap accessible structures, breakwaters, bulkhead/seawall
supports, mooring piles, small pedestrian/recreational bridges, steps, sidewalks/walkways, walkway piers,
sand beaches with retaining structures; minor recreational, ornamental, other similar and associated
structures, roads and road crossings. The Corps, at its discretion, may investigate any bulkhead/seawall,
or other structure or fill that was placed in the Lake that is unauthorized and resolve the violation
according to rules in 33 CFR 326. The resolution may include in some cases an after-the-fact
authorization, area restoration, corrective or mitigative measures, or legal action.
2. PROPOSED: This GP authorizes, including but not limited to, the proposed construction of fixed
docks, fishing piers/docks, handicap accessible structures (subject to an approved variance of the
conditions below), breakwaters, bulkhead/seawall supports, mooring piles, small pedestrian/recreational
bridges, steps, dock walkways, walkways perpendicular to the shoreline, walkway piers, sand beaches
with retaining structures; minor recreational, ornamental, and other similar and associated structures; are
subject to the following conditions:
a. For concrete or solid-fill structures, including but not limited to; anchors, walkways, wharfs and
associated structures; the volume of fill placed below the OHWM must not exceed 10 cubic yards,
and the structure must be no more than 8 feet-wide.
b. For structures on piles, including but not limited to; fixed docks, walkways, wharfs and
associated structures; or otherwise cantilevered over the Lake, the bottom surface of the structure
must be at elevation 660.0 feet UED, or higher.
c. Fishing piers must be 6 feet or less in width, and must not extend more than 30 feet lakeward of
the OHWM perpendicular from the shoreline.
d. Sand beaches may be maintained as needed including the placement of additional sand. Sand
lost lakeward from a beach may be recovered and replaced on the beach.
e. The size, extent, and location of all structures on a single property must be in conformance with
this GP and approved by Ameren Missouri in accordance with the Ameren Missouri Shoreline
Management Permit requirements.
f. Breakwaters, constructed as an integral part of an Ameren Missouri approved boat dock, are
considered part of the dock and do not require Corps permit authorization. For other breakwaters,
approval must be obtained from the joint Ameren Missouri/Corps permit in accordance with
Ameren Missouri Shoreline Management Permit requirements.
g. Bridges must be constructed in such a way that they do not impede navigation, prohibit boat
passage or restrict anglers.
3. Permittees must install and maintain lighting, signage, or buoys as recommended or required by the
Missouri State Water Patrol, Ameren Missouri Shoreline Management Permit requirements, and other
agencies with jurisdiction as applicable.
APPENDIX III (continued)
Miscellaneous Structures and Activities
4. Utility connections to approved structures must be in accordance with applicable building codes and
industry standards in accordance with Ameren Missouri Shoreline Management Permit requirements and
other agencies with jurisdiction as applicable.
5. All structures must be well maintained, and must be repaired or removed from the Lake within 6
months of damage by storm, high or low water, ice, collision or other event.
6. This GP does not authorize construction lakeward of the OHWM or the permanent mooring in the
Lake of the Ozarks, of any structure that will be used as living quarters or for overnight habitation.
7. Fences constructed lakeward of the OHWM are not authorized by this GP.
APPENDIX IV
Dredging/Excavation for Docks, Access Channels, and Structures
EXISTING and PROPOSED, including but not limited to:
1. Restoring use of or access to authorized boat ramps and boat docks existing prior to March 30, 2007:
Excavation is limited to the exact authorized foot print of the dock. The sides of excavation area must be
graded to have a final slope of 1 vertical (V) on 3 horizontal (H). Variances in the requirement for side
slopes of 1V on 3H will be granted or required where completion of the grading would undermine the
structural integrity of any permitted structure such as bulkheads/seawalls and piers, or to prevent the
encroachment into or erosion of wetlands, vegetated shallows or other environmentally sensitive areas.
2. Dredging/excavation associated with authorized boat ramps and boat docks permitted or installed after
March 30, 2007 (see attached typical plan view and cross sectional drawing): Excavation for docks
permitted or installed after 2007 is limited to 900 square feet, in an area where the existing lakebed for the
entire proposed excavation area is elevation 655.5 feet UED or deeper, and in areas where the excavation
may be accomplished such that the excavation, including required side slopes of 1V on 3H, will occur no
closer than 25 feet to the OHWM. An approved variance to the 900 square feet limit is allowed for
community docks.
3. Excavation must not be conducted any deeper than elevation 652.0 feet UED, except when approved
on the GP verification sheet for the operation of a boat lift. Variances for boat lift operation will allow
excavation to a bottom limit of 650.0 feet UED, and are limited to the absolute minimum area required for
normal lift operation.
4. Access channel excavation for access to docks is limited to a single channel in any narrow cove, and
no permittee shall have exclusive use of any excavated access channel. Where possible, the channel must
be centered over the deepest existing channel in the cove. Channel width is limited to 15 feet-wide with a
channel bottom elevation of 652.0 feet UED. Channel side slopes must be graded to have a final slope of
between 1V on 2H and 1V on 3H. The transition zone between the 15 foot wide channel and authorized
docks must be no longer than the width of the dock. Variances in location or alignment may be granted
or required where the variance would address substantial public interests or where the variance would
minimize adverse impacts to the aquatic ecosystem.
5. Access channel excavation for access to boat ramps must be no deeper than the lowest elevation of the
boat ramp, or elevation 652.0 feet UED, whichever is higher. This GP does not authorize the excavation
of access channels for boat ramps constructed after the issuance of this GP, where the preconstruction
lakebed elevation is 655.5 feet UED, or higher. Channel width is limited to the width of the boat ramp, or
15 feet, whichever is narrower. Channel side slopes must be graded to have a final slope of between 1V
on 2H and 1V on 3H. A variance to these conditions may be approved depending upon site conditions.
6. All dredged or excavated material must be placed in an upland area, above the elevation 662 feet UED
contour, where and in such a manner that it will not re-enter the Lake. Large woody debris providing
aquatic habitat should not be removed unless it poses a navigational or other safety hazard. The proposed
excavation or disposal of dredged material must not promote the erosion of wetland areas and excavation
is prohibited in wetlands and vegetated shallows.
APPENDIX IV (continued)
Dredging/Excavation for Docks, Access Channels, and Structures
7. Placement of fill in the Lake, adjacent wetlands, or any tributary to the Lake, for the construction of an
access road to the excavation area may be authorized. Where the lakebed sediments will not support the
excavation equipment, removable mats may be used. Mat use is recommended for all excavation projects
to minimize adverse impacts to the lakebed habitat. Only the minimum amount of excavation and fill
necessary to construct the temporary road is authorized, the fill must be removed upon completion of the
project and the area returned to previous contours. The use of rock fill is authorized for temporary access
road provided it is removed following the excavation activity or spread out over the existing contours to
provide shallow water habitat.
8. Each verification of this GP authorizes the one-time excavation of the area on the verification sheet.
This GP does not authorize excavation of the same work area within three years following the completion
of any authorized excavation project.
9. All approved structures and encroachments lakeward of the OHWM may be subject to the completion
of mitigative measures such as rock blankets, anchored cedar trees, or other fish habitat, and/or utilize an
approved mitigation provider as required on the project verification sheet. Mitigation requirements for
dredging projects may include the installation of a single anchored cedar tree or other fish attraction
device for each 10 cubic yards of excavation material removed from the Lake. The trees mush have an
approximately four-inch diameter trunk, anchored with a noncorrosive material of concrete or rock, and
placed as close to the impact area as possible, where the lakebed is at or lower than elevation 647.0 feet
UED. If there are no suitably deep areas near the impact area, the permittee must contact the Fisheries
Management Staff of the Missouri Department of Conservation, Camdenton Service Center (telephone
573-346-2210) for alternative locations. Alternate mitigation measures to replace or augment may be
required, as noted on the project verification sheet.
APPENDIX IV
Dredging and/or Excavation
Boat Dock, Boat Hoist, and Access Channel
BOAT DOCK AREA
BOAT HOIST AREA
SIDE SLOPES
25'
ACCESS CHANNEL
MIN
B
OHWM
A
A
B
LAKE OF THE OZARKS
TYPICAL PLAN VIEW
BOAT DOCK, HOIST, AND ACCESS CHANNEL EXCAVATION AREAS
OHWM
EL 655.5' MAX
EL 650.0' MAX
EL 652.0' MAX
LAKE BED
25'
MIN
BOAT HOIST AREA
BOAT DOCK AREA
SIDE SLOPES
1V ON 3H
CROSS SECTION A - A
BOAT DOCK AND BOAT HOIST EXCAVATION AREAS
LAKE BED
15' MAX
SIDE SLOPES
1V ON 2-3H
EL 655.5' MAX
EL 652.0' MAX
CROSS SECTION B - B
BOAT DOCK ACCESS CHANNEL EXCAVATION AREA
NOTE: Drawings Not-To-Scale
KEY: EL ELEVATION, UNION ELECTRIC DATUM (UED)
OHWM ORDINARY HIGH WATER MARK, ELEVATION 658.5' UED
MAX MAXIMUM
MIN - MINIMUM
APPENDIX V
Utilities
EXISTING and PROPOSED, including but not limited to:
1. Water intake structures, including fixed and portable pumps, and intake lines attached to floating
platforms. The pump system and installation must be in accordance with Ameren Missouri Shoreline
Management Permit Requirements, including electrical installation, specified screen mesh size, maximum
water velocity at the screen to minimize impingement and entrainment of fish at pump intakes, and annual
water usage. Pump systems must be designed to preclude the spillage of fuel and lubricants or the arcing
of electricity into the Lake. Proposed submersible pumps are not authorized by this permit. Portable
pumps must be removed from the Lake when not in use.
2. Dry hydrants for fire protection shall have screened intakes, be permanently fixed by burying in the
lakebed and bank, and located adjacent to boat ramps or roads accessible without crossing wetlands.
3. Heat pump coils and lines containing liquid for the dissipation or pickup of thermal energy
permanently installed with the coils on or supported off the lakebed. System antifreeze must be non-toxic
to aquatic life. The supply lines shall lay on the lakebed and must be buried or otherwise protected from
damage entering and exiting the Lake. The coils and lines must be of sufficient depth to avoid being a
hazard to navigation during times of low lake levels. The system and installation, including any electrical
device installed in the Lake for circulation, must be in accordance with Ameren Missouri Shoreline
Permitting requirements.
4. Submerged utility lines that are buried (including placement by directional boring) or laid on the
bottom of the waterway, provided the entering and exiting portions of the line are secured or trenched into
the bottom and the bank to avoid damage to the line. On-shore alignment markers may be required, as
shown on the verification page.
5. Aerial transmission lines by commercial utility companies for telephone, cable television, and
electrical power transmission lines require pre-application notification to Ameren Missouri, the Corps and
the Missouri State Water Patrol, prior to authorization by this GP and will be installed in accordance with
Ameren Missouri Shoreline Management Permit requirements.
APPENDIX VI
Fish Habitat
EXISTING and PROPOSED, including but not limited to:
1. The placement of anchored brush piles or cedar trees; or natural or man-made fish attraction devices;
rock blankets lakeward of existing approved bulkheads/seawalls, or other structures constructed of
materials consistent with the special conditions of this GP, for the purpose of providing fish habitat, are
authorized.
2. No structures are to be placed in areas that are known to support emergent or submergent vegetation
during the growing season.
3. Anchoring systems must be designed to prevent the structure from floating into the normal motor boat
propeller zone, and to prevent less buoyant structures from moving along the lakebed by lake currents.
Anchoring cables/lines must be of a material that will not decompose before the structure decomposes.
APPENDIX VII
Sediment and Debris Removal
EXISTING and PROPOSED, including but not limited to:
1. Excavation of accumulated sediments and debris (e.g., soil, rock, gravels, upland vegetation and
debris, and lake drift debris) from the Lake deposited as a result of a discrete event or natural occurrences
which negatively impact shallow and deep water habitat. The removal of materials is limited to the
minimum necessary to restore the area to previous condition/contours; to restore the integrity and natural
functions of the waterway, shallow or deep water habitat, or lakebed; and to maintain the pool
configuration and capacity of the Lake from siltation.
2. Each project verification by this GP authorizes a one-time excavation of the area only as specified on
the permit verification sheet. The length, width, and depth of the excavation area shall be identified and
marked on-site. Excavation shall be confined to that area between the property lines as extended
lakeward onto Ameren Missouri property and not extend beyond center-line of the cove. Excavation
depth will be restricted to approximately elevation 652.0 feet UED. Minor variances may be authorized.
The permit document will contain project area drawings with site dimensions and corresponding
elevations. You must restrict the excavation to the authorized area only as specified in the permit.
3. Excavation of sediment and debris in the vicinity of and within existing structures (e.g., bridges,
culverted road crossings, water intake structures, and boat ramps) for maintenance purposes to restore use
or access. Sediment/debris removal may not extend more than 200 feet from an existing structure. The
200 foot limit does not apply to maintenance dredging to remove accumulated sediments blocking or
restricting outfall and intake structures or maintenance dredging to remove accumulated sediments from
channels associated with outfall and intake structures. The placement of new or additional riprap, or
similar approved stabilization measures may be authorized as necessary to protect the structure and/or
lessen the probability of future sediment deposition into the Lake. Any bank stabilization measures or
other work below the OHWM not directly associated with a structure will require a separate
authorization.
4. All dredged or excavated material must be placed in an upland area, above the elevation 662 feet UED
contour, where and in such a manner that it will not re-enter the Lake. Large woody debris providing
aquatic habitat should not be removed unless it poses a navigational or other safety hazard.
5. You must take preventative measures to minimize future deposition into the Lake. Such measures
may include temporary and permanent sediment and erosion controls such as bank stabilization, rock
check dams, armoring drainage channels and roadside ditches, or approved bioengineered solutions.
6. Sand from beaches may be recaptured and re-deposited to restore beaches. See Appendix III, 4. d.
NWKGP-38M PROJECT AUTHORIZATION/VERIFICATION SHEET
KANSAS CITY DISTRICT - CORPS OF ENGINEERS
1. Verification No. (Corps use only)
2. Verification date:
3. Permittee and mailing address:
4. Agent/Contractor and mailing address:
Phone:
Phone:
5. Project location: In the Lake of the Ozarks, at lake mile __________________, Cove/Arm____________________, subdivision and
lot ______________________ _____________ ; in the NE NW SE SW (circle one) of Section _______, Township _______, Range
_______, _______________ County, Missouri.
Coordinates ( __UTM, __Lat./Long., __Decidegrees):
6. Authorized work (As shown on attached drawing(s)):
(Cite applicable GP appendices and list dimensions.)
7. Special conditions/cautions:
8. Verification by :
(Name, signature and title)
Ameren Missouri project ID number : _____________________________