The applicant requests an extension of time and an amendment.
Full Public Notice Project Plans
PROJECT DESCRIPTION: The applicant requests an extension of time
and an amendment to its previously authorized permit for dredging activities in
the LQC and a 10-year maintenance dredging program. The applicant is currently authorized to
dredge approximately 1.4 million cubic yards of material within a 20-acre area
at the junction of the CCSC and LQC to a depth of -45 feet mean low tide (MLT)
with an additional -2 feet of advanced maintenance and up to -2 feet of
allowable overdepth for a total possible depth of -49 feet MLT. The applicant proposes to add two dredging
areas (Northern and Southern Dredge Areas) and two dredged material placement
areas (DMPA), the existing Good Hope DMPA and a new private Copano DMPA, to its
project. The Southern Dredge Area has an
approximate size of 15.11 acres, which includes 8.57 acres that overlap the
currently authorized dredge area and 6.54 acres of new area. The southern modification would widen the
existing 400-foot-wide channel variably from approximately CE Station 32+15.62
to Station 60+00 up to an approximate 550-foot width on a 1V:2H side slope with
a depth of -52 feet MLT plus -2 feet allowable overdepth (for a total possible
depth of -54 feet MLT) to match the existing federal template in this reach. This would result in dredging approximately
157,500 cubic yards of additional material.
The Northern Dredge Area is an approximate 14.87-acre area, and the
modification would widen the existing 400-foot-wide channel variably between CE
Station 230+00 to Station 280+00 up to an approximate 500-foot width on a 1V:2H
side slope and the required depth of -47 feet MLT plus up to 2 feet of
allowable overdepth (for a total possible depth of -49 feet MLT) to match the
existing federal template in this reach.
This would result in dredging approximately 557,500 cubic yards of
material. Dredging would be conducted by
either hydraulic or mechanical methods with dredged material placed in DMPAs 9,
10, and 13 as well as the additional DMPAs Good Hope and Copano. The proposed Copano DMPA consists of three
existing bauxite residue drying beds located near Copano Bay, in Aransas
County, Texas. The existing
infrastructure and pipelines to hydraulically transport the dredged material
extend from the LQC shoreline to the Copano DMPA and is currently
serviceable. The dredged material would
be contained by existing levees surrounding the DMPA. The applicant’s stated purpose of the
proposed work is to improve navigational safety and general maneuvering
effectiveness for a variety of vessels representing multiple waterway users
within the CCSC and transiting the LQC to access existing and new facilities on
the LQC and LQC Extension.