CONSTRUCTION OF AN INTERCHANGE AT I-10 AND PECUE LANE
NAME OF APPLICANT:
City of Baton Rouge, c/o Shread-Kuyrkendall
& Associates, Inc., 13016 Justice Avenue, Baton Rouge, Louisiana 70816.
LOCATION OF WORK:
The project is located at the intersection of
Interstate 10 and Pecue Lane, in Sections 5, 48 and 49, Township 8 South, Range
2 East, in Baton Rouge, Louisiana, in East Baton Rouge Parish, as shown on the
enclosed drawings (Latitude 30.36825° N, Longitude 91.04681° W). This project
is located in Lake Ponchartrain watershed basin within the Amite River USGS Catalog
Unit 08070202.
CHARACTER OF WORK:
The applicant has requested Department of the Army authorization to
clear, grade, excavate and deposit fill and/or aggregate material to construct a
highway interchange. The proposed project
would impact approximately 6.3 acres of jurisdictional wetlands and 0.9 acre of
“other waters of the US”. The applicant has claimed that the project has been designed to avoid and
minimize impacts as much as possible. Approximately 72,225 cubic yards of earthen
fill material would be hauled in and deposited in jurisdictional wetlands to
achieve required grade elevation. As compensation for unavoidable wetland impacts, the applicant proposes
to use a Corps approved mitigation bank within the watershed of impact.