Anita Andazola is the Regulatory point-of-contact for this permit application from Key Line Construction to conduct work impacting the North Fork Roberts Creek in Roseburg, Oregon.
PUBLIC NOTICE for Permit Application
Issue Date: May 20, 2016
Expiration Date: June 20, 2016
US Army Corps of Engineers No: NWP-2016-130
30 Day Notice Oregon Department of State Lands No: 58931-RF
Interested parties are hereby notified the U.S. Army Corps of Engineers, Portland District (Corps) has received an application for a Department of the Army permit for certain work in waters of the United States, as described below and shown on the attached plans. The Corps is soliciting comments on the proposed work.
Applicant: Key Line Construction
Attention: Mr. Tank Parrish
P.O. Box 518
Myrtle Point, Oregon 97458
Email: tank@rogueline.com
Telephone: (541) 559-1085
Applicant’s Agent: Mr. Adam Heberly
Heberly Engineering
1298 Wolf Valley Drive
Umpqua, Oregon 97486
Email: heberlyengineering@gmail.com
Telephone: (541) 459-6195
Location:The project site is near the intersection of Ingram Drive and Grant Smith Road, Roseburg, Oregon and is adjacent to North Fork Roberts Creek, mile 1.0 from its confluence with Roberts Creek. The site is in Section 12, Township 28 South, Range 6 West. Latitude and Longitude: 43.149438 North, -123.363137 West
Waterway:Approximately 1.86 acres of palustrine wetlands and 0.01 acre of other water are adjacent to Robert’s Creek.
Project Purpose: The applicant’s stated purpose is to develop facilities for an industrial park.
Project Description: The applicant would fill a minimum of 1.86 acres of palustrine wetland discharging approximately 300 cubic yards of base and finish aggregate to construct shop and office space, approximately 4.02 acres of heavy equipment parking, and associated facilities on the five-acre site. The proposed project would include two bio-swales along the project perimeter to treat stormwater runoff from 4.5 acres of impervious surface. The north bio-swale would be 420 feet long by two feet deep by eight feet wide and the south bio-swale would be 315 feet long by two deep wide by 8 feet wide respectively. The outfall for the bio-swales would run parallel to Interstate 5 and discharge to 7.88 acres of abutting wetland. Each bio-swale would be constructed at a 1:4 percent slope.
Mitigation: The applicant has proposed to use compensatory wetland mitigation credits from the Umpqua Interior Foothills site from the In Lieu Fee program for compensatory mitigation in the permit application. If a permit is issued, the Corps will determine the type and amount of compensatory mitigation necessary to offset environmental losses from the proposed project.
Drawings: Nine (9) drawings are attached and labeled Corps No. NWP-2016-130. Copies of this public notice, which have been mailed or otherwise physically distributed, feature project drawings in black and white. The electronic version features those drawings in color, which we think more accurately illustrates the proposed project. To access the electronic version of this public notice, go to the Portland District website at http://www.nwp.usace.army.mil/ and select Regulatory Branch Permit Information. At the Regulatory page select Regulatory Public Notices.
Additional Information: The proposed project location is immediately north of an estimated 4.6 acre mitigation site and south of 7.88 acres of wetland delineated in 2005.
Authority: The proposed project will be evaluated under the following:
Section 404, Clean Water Act (33 U.S.C. 1344), for discharge of dredged or fill material into waters of the United States.
Clean Water Act Section 404(b)(1) Guidelines: The described discharge will be evaluated for compliance with guidelines promulgated by the U.S. Environmental Protection Agency under authority of Section 404(b)(1) of the Clean Water Act. The 404(b)(1) Guidelines are the substantive criteria used in evaluating discharges of dredged or fill material into waters of the United States. Should a permit be issued, the Corps will evaluate the fill material source (i.e., borrow site) prior to the start of construction.
Water Quality Certification: Section 401 of the Clean Water Act (33 U.S.C. 1341) requires applicants to obtain a water quality certification for proposed discharges into waters of the United States. A permit for the described work will not be issued until certification has been issued or is waived from the certifying state. Attached is the state's notice for a water quality certification.
Endangered Species: Section 7 of the Endangered Species Act (ESA) (16 U.S.C 1536) requires federal agencies to consult with the National Marine Fisheries Service (NMFS) and/or U.S. Fish and Wildlife Service (USFWS) on all actions that may affect a species listed (or proposed for listing) under the ESA as threatened or endangered or that may adversely modify designated critical habitat. The Corps’ preliminary review indicates the described activity may affect an endangered or threatened species or designated critical habitat. The Corps will initiate consultation under Section 7 of the ESA. The Corps will complete the required consultation prior to finalizing a permit decision.
Essential Fish Habitat: Section 305(b)(2) of the Magnuson-Stevens Fishery Conservation and Management Act (MSA) as amended (16 U.S.C 1855), requires Federal agencies to consult with the NMFS on all actions, or proposed actions, permitted, funded, or undertaken by the agency, that may adversely affect Essential Fish Habitat (EFH). The Corps’ preliminary review indicates the described activity would adversely affect EFH at the project location or in the vicinity. The Corps will initiate consultation under Section 305(b)(2) of the MSA. The Corps will complete the required consultation prior to finalizing a permit decision.
Historic Properties/Cultural Resources: Section 106 of the National Historic Preservation Act of 1966, as amended (16 U.S.C. 470), requires Federal agencies to consult with the appropriate State and/or Tribal Historic Preservation Officer to take into account the effects of actions they undertake or permit on historic properties listed in or eligible for listing in the National Register of Historic Places. The Corps’ preliminary review indicates an historic properties investigation has been conducted within the permit area. No sites determined eligible for or listed on the National Register of Historic Places were found to exist within the permit area.
This notice has been provided to the State Historic Preservation Office (SHPO), interested Native American Indian Tribes, and other interested parties. If you have information pertaining to cultural resources within the permit area, please provide this information to the Corps’ project manager identified at the end of this notice to assist in a complete evaluation of potential effects.
State and Local Authorizations: The proposed project is not regulated by the Douglas County comprehensive plan and land use regulations. The applicant will be applying for the following additional governmental authorizations for the project: Department of State Lands Removal-Fill permit and Department of Environmental Quality individual water quality permit.
Public Hearing: Any person may request in writing within the comment period specified in this notice that a public hearing be held to consider this application. Requests for public hearings shall state with particularity the reasons for holding a public hearing.
Evaluation: The decision whether to issue a permit will be based on an evaluation of the probable impact, including cumulative impacts, of the described activity on the public interest. That decision will reflect the national concern for both protection and utilization of important resources. The benefit, which reasonably may be expected to accrue from the described activity, must be balanced against its reasonably foreseeable detriments. All factors, which may be relevant to the described activity will be considered including the cumulative effects thereof; among those are conservation, economics, aesthetics, general environmental concerns, wetlands, historic properties, fish and wildlife values, flood hazards, floodplain values, land use, navigation, shoreline erosion and accretion, recreation, water supply and conservation, water quality, energy needs, safety, food and fiber production, mineral needs, consideration of property ownership and, in general, the needs and welfare of the people.
The Corps is soliciting comments from the public; Federal, state, and local agencies and officials; Indian Tribes; and other interested parties in order to consider and evaluate the impacts of the proposed project. Comments received will be considered by the Corps to determine whether to issue, modify, condition or deny a permit for this proposal. Comments are used in the preparation of an Environmental Assessment and/or an Environmental Impact Statement pursuant to the National Environmental Policy Act. Comments are also used to determine the need for a public hearing.
Submitting Comments: Interested parties are invited to provide comments on the proposed project. Comments may be submitted by conventional mail or email. All comments received will be considered in determining whether authorizing the work would be contrary to the public interest.
Either conventional mail or e-mail comments must include the Corps reference number as shown on page 1 and include the commenter’s name and address. In order to be accepted, e-mail comments must originate from the author’s e-mail account and must include on the subject line of the e-mail message the Corps reference number. All comments received will become part of the administrative record and are subject to public release under the Freedom of Information Act including any personally identifiable information such as names, phone numbers, and addresses.
Additional information about the proposed project may be obtained from the Corps Project Manager listed below. All comments, whether by conventional mail or email, must be received no later than the expiration date of this public notice to ensure consideration. Comments should be submitted to the following mailing address or email address:
U.S. Army Corps of Engineers
Ms. Anita Andazola
Eugene Field Office
211 E. 7th Avenue, Suite 105
Eugene, Oregon 97401-2722
Email: anita.m.andazola@usace.army.mil
Telephone: (541) 465-6894
PUBLIC NOTICE
Oregon Department of Environmental Quality (DEQ)
Water Quality 401 Certification
Notice Issued: May 20, 2016
Written Comments Due: June 20, 2016
Corps of Engineers No: NWP-2016-130
Oregon Department of State Lands No: 58931-RF
WHO IS THE APPLICANT:Key Line Construction
LOCATION OF CERTIFICATION ACTIVITY:See attached U.S. Army Corps of Engineers public notice.
WHAT IS PROPOSED: See attached U.S. Army Corps of Engineers public notice on the proposed project.
NEED FOR CERTIFICATION: Section 401 of the Federal Clean Water Act requires applicants for Federal permits or licenses to provide the Federal agency a water quality certification from the State of Oregon if the proposed activity may result in a discharge to waters of the state.
DESCRIPTION OF DISCHARGES: See attached U.S. Army Corps of Engineers public notice on the proposed project.
WHERE TO FIND DOCUMENTS: Documents and materials related to water quality issues as a result of the proposal are available for examination and copying at Oregon Department of Environmental Quality, 401 Water Quality Certification Coordinator, Northwest Region,700 NE Multnomah Street, Suite 600, Portland, Oregon 97232. Other project materials are available by contacting the Corps per the attached public notice.
Scheduling an appointment will ensure that water quality documents are readily accessible during your visit. To schedule an appointment please call DEQ Water Quality at Northwest Region at (503) 229-5263.
Any questions on the water quality certification process may be addressed to the 401 Program Coordinator at (503) 229-6030 or toll free within Oregon at (800) 452-4011. People with hearing impairments may call the Oregon Telecommunications Relay Service at 1-800-735-2900.
PUBLIC PARTICIPATION:
Public Hearing: Oregon Administrative Rule (OAR) 340-48-0032 (2) states that “The Corps provides public notice of and opportunity to comment on the applications, including the application for certification, provided that the department (DEQ), in its discretion, may provide additional opportunity for public comment, including public hearing.”
Written comments:
Written comments on project elements related to water quality must be received at the Oregon Department of Environmental Quality by 5 p.m. on the date specified in the upper right section on page one of this notice. Written comments may be emailed, mailed or faxed as described below:
Email - 401publiccomments@deq.state.or.us
Mail - Oregon Department of Environmental Quality, Northwest Region
700 NE Multnomah Street, Suite 600
Portland, Oregon 97232
Attn: 401 Water Quality Certification Coordinator
Fax - (503) 229-6957
WHAT HAPPENS NEXT:DEQ will review and consider all comments received during the public comment period. Following this review, certification of the proposal may be issued as proposed, issued with conditions, or denied. You will be notified of DEQ's final decision if you submit comments during the comment period. Otherwise, if you wish to receive notification, please call or write DEQ at the above address.
ACCESSIBILITY INFORMATION:This publication is available in alternate format (e.g. large print, Braille) upon request. Please contact DEQ Office of Communications and Outreach at (503) 229-5317 or toll free within Oregon at 1-800-452-4011 to request an alternate format. People with a hearing impairment can receive help by calling the Oregon Telecommunications Relay Service at 1-800-735-2900.
INDEX OF SHEETS
SHEET NO.
TS!
NTJ-2
Pll-4
EC!
DES CRI PTION
IPTitle Sheet
Eroston Control Notes & Specifications
Site Plans
Eroston Control Plans
PLANS FOR PROPOSED PROJECT
Oak Creek Industrial Park:
201 Ingram Drive Roseburg, OR , 97470
ATTENTION·
Oreoon Low Requires You To Follow Rules
Adopted By The Oreoon Utility Notlficotron
Center, Those Rules Are Set Forth In
OAR 952· 001 · 0010 Throu<;ih OAR 952· 001·0090.
You t.Aoy Obtoin Coples Of The Rules By Collino
The Center. !Notes The Telephone Number For
The Oreoon Utlllty Center Is 1503! 232·!987.l
DOUGLAS COUNTY OREGON
March 201 6
v
36
I r /
(
\
I'
(
6
:
PROJECT LOCATIONS
__/
/
r - - - -/ ;/t-----~_," l, lI
/'
'\,..
,
/,
i
'
"-,
i
' I
'
'
,/,/,.
(/
OAK CREEK INDUSTRIAL PARK
I
I
201 INGRAM DRIVE ROSEBURG, OR, 97-470
\
I
J
j
'
'
I
HEBERLY ENG INEER ING
Cr.rr..--cr1
~e·H·J
lnc:,.,..ir1r.';I.
Cr e ll'J ~ olu1l cns
O~ . ';ti~&~
~l l·:n1-" """ .1Ef\i:RL r rn .:. 1.-.r;_i>;~;:.ri:: 1 J
OAK CREEK INDUSTRl!l PARK
20l lnQra>1 Or" lv o Ao.sebl.W' Q. Ol'I, ',IHTO
C·OUCUS COWlr CffECON
Oulon-db7·.ldo:.N
Orafndb1··-N
TITLE SHEET
D:\Adom\Eng i nee r i ng Projects \ 20 16\Porrosh Ingram Dr 5 oc\P l ons\Rogue L i ne P i on Sh t _ 1 .dgn
NWP-2016-130
T it I e Deto i Is
3 / 17/2016
-·...
TSI
I : 5 5: 03 PM Ro t ot .4dom Bi§berSbj'J I e: I " = I 00'
Enclosure 1
Native Grass Seed l\1ixture For M'lintenance Use:
Klamath Mmntain Eco-region
Elevation Range: 6()(}.l,200 M>te1-s (2,000 m peaks}: 1"bisture Range: 60-12o+ cm/year
DEVELOPER:
t<.ey Line Construction I nc.
P.O. Box 518
Myrtle Point, OR 97458
Contact: Tank Parrish
Phone: 541 - 218-5854
Sped"'
Festuro oocldr!lllolis (\\b.1,em fcscue)
Festuc:a ntbm r Krn FestU:)
Fcstuca mina (Sir.ct> Fescu:)
PoasaJKb:N!ii('............._,Bl·~.,1
Sitanlonlmrtrix 1......... .il'T'Pl-tail C''llUSS)
F.1}1m.s R/(11.tOIS (\M.ld Bl·~)
Brom is cw111<.tlus (c.olifania Brare)
ENGINEER:
HEBERLY ENGINEERING
1298 Wolf Valley Dr.
Umpqua,OR, 97486
Contact: Adam Heberly PE
Phone 541 - 391 - 4813
NoD.ou.1
'\\ildlifc Vnluc
l\klture
(YIN)
(Co,.cr/Fomgc)
Udght
y
y
y
y
y
N
N
N
N
N
N
N
y
y
c
c
c
c
-
Can)
30-40
3().6()
3().6()
3().6()
3().6()
OF
c
60+
3().6(}t
Ufc
C,i'\'le
#Purclivc
Sttd.Vm'
Scaling
Sa.'tfing Rntc l.bs/ac.
Rate
er.un\l'ha
p
p
p
p
p
p
p
25
100
50
75
75
100
75
500
13,11111
ScaWnr
Qams
(by ..........
flSll ..
315
l,Q';()
436
SD
2,370
37l!6
"'"n
Ul8111.0az.l
Cl94 07.0 oz.l
Cl40US3oz.l
Cl48(18.8oz.)
2.11183.602.l
3.4011.1J.S oz.l
4.75CJ87oz.l
113
U..l'L'illl<.
RSuggcstcll Site Pren:tr.1ti on nnd Annlication:
· On gmdcs greater thnn 40°/omay bcnpplied in combinntion \\ith SOll..rGUARIYMor cdlulosc mulch ,.,ith tnckifier then apply@200"/o o f recommended seeding
rate l~ of fcrtilUcr l'i not reconuncmJetl "itl1 this mixture.
Inspector: Adam Heberly PE
Phone 541-391 - 4813
ODOT Inspection Certifications: #40253 EC
Tcmnorary Seeding Dates:
\\NARRITIVE DESCRIPTIONS
Existing Site Conditions: Mildly Sloped or Flat Field
The owner will initially develop the site as a gated and fenced gravel parking lot.
Jn time, we will add office and shop buildings.
Pcrmment Sea.ling n1tcs·
\\bst of the Cnscades - AugutiTIAd> Sqterrher 15 undFclnmy I ~ Apil 30
EnstoftheCnscades - 0.icl= I tl.tside the pamnnt seOOing dat"' in atjudian \\ith penmnat m:lching lo stubifue exposed soils cmµe1ed to linislw:d grade shill be
o.nsiden:d tcnµrwy lI1ti1 tlne \\eeks irto 010 r=t pa< s=ling~
Developed Condition: To develop office/ shop / parking facilities
for Applicants construction company 13/12 t<.ey Line Construction, Inc.
(
Nnth--c
(YIN)
Compatible Tempor:uy* Erosion Control
Cellulose fiber \\ith tockificr i:q::picd \\ilh hjtlro-soxh.
ESTIMATED START DATES
Clearing & Grading: App. May 1
Haul & Place Baserock: App. July 1I TBD
Final Soil Stabilization: Fa/12016, or as needed per general notes
Total Dist. Area: 4.9 AC, 213,444 SF
Total Site Area: 5.0 AC, 217,800 SF
See bnck for map
SITE SOIL CLASSIFICATION:
48C- Curtin clay, 3 to 12 percent slopes
RECEIVING WATER BODY
Nearest: North Fork Roberts Creek
......
.
' f. UI ,
"
..
·
1
·
,
,
·
,,,
,,
··
1. «\: I~
c.~.ir.n.;;
SITE INSPECTION FREQUENCY
SITE CONDIT ION
1 Active Period
MINIMUM FREQUENCY
Daily when stormwater runoff,
including r unoff from snow melt is occurring.
At least once every two !2) weeks regardless
of whether storm water runoff is occurring.
I
+-
r
(_.. ti
I
2 Prior to the site becoming inactive or in
anticipation of site inaccessibility.
Once to ensure that erosion and sediment
control measures are in working order.
Any necessary maintenance and repair must
be mode prior to leaving the site.
3 Inactive periods greater than fourteen rJ 4J
consecutive calendar days.
Once every two !2J weeks.
4 Periods dur ing which the site is inaccessible
due to inclement weather.
If practical, inspections must occur daily at
a relevant and accessible discharge point or
down stream location.
~- 1::: '1'-- ~ __: :_ - - - - -
__ ,_,______
-,..-....-m--_- - - - - -1
./ IJ
J J
-;t-
'1
'1
I
~ ~ ~r___.!'., !2- ·~ ~ = -
'1
iJIJ J
I '1
'1 - ~ l-t--..._-+--1--1--+-+- I
'
11e::c«11S :.m. l).l
HEBERL V ENGINEER ING
~~~=======i:=t::i~==~t~~.~r.
,.,. . .&~~
-- .s~t:11:.1~1.::~t:-=-t-=-t-=1i::~~-=-1=-=-t-=1~
l r !>Jo s..ii&J 1
\ '-·f>. I O.;o lo ~..-., C'kJ ,._. ,"1lon n \ r;>,,... 1~1 ·,,. I
CGr.J:......., ~er.H l l' O'.f·:c''tr \r.?. Creo l! ~o '.Sl'l utl.:r.:;
1/l t \'cl l r. ~ l'r. l!f:'o"JQ. 0'1. 'iHbG !;U · 311 · C61.3
?lll.... H:::IUA.L 1 £1.Gl :;tlP i ~;l . n'.: !.t
I
'V
'V
·'V
IV
OAK CRE EK IHDUITRIAL PlRl
201tn70'l'I Ot'l1 · Ro.!t'bu-Q.Olt ,1 100
OCOCUS COC1'11T
~(C-0'4
Oulpd by· A.SO. M
Ora1Ud by · J.dEAO SIOH COHTROL HOTEi
D:\Adom\ En g in eering Pro j ec t s \ 20 16\Porrosh I ngram Dr 5 oc\Plo ns\Rogue L i ne P i on Sh L I "dgn
NWP-2016-130
EC T it l e
3/17/2016
1 :53:"15
PM
~ dcbrn t fil e b ~r
(]) )'
-·...
NTI
Seo l e : " - 100'
Enclosure 1
(
(
General Notes:
J. SCOPE: The General Notes and typical details ore general and apply to the entire project unless other wise specified to the contrary.
2. APPLICABLE SPECIFICATIONS AND CODES : Construction shall conform to the Oregon Standard Specification for Construction, 2008 by Oregon Deportment of Transportation
WDOTJ and American Public Works Assoclotion !APWAI.
3. ALTERNATIVE DESIGN: The systems and details shown on the drawings ore the priority design. Alternative systems and details may be considered if the Contractor
submits plans with substantiating data, and if the alternative plans ore accepted by the owner 's Engineer. Details and substantiating data shall be complete prior
to consideration.
4. DIMENSIONS AND SURVEY I NG: The location and dimensions on the plans shall be verified by the Contractor prior to construction: this is a Contractor surveying project.
Field verify all existing construction, dimensions, and conditions.
5.COORDINATION WITH UTILITIES:
A. The location and description of utilities shown ore approximate. Not all utilities hove be shown.
B. The contractor shall comply with all requirement of ORS 757.57 J. The Contractor shall notify each of the underground utilities at least 48 business day hours
prior to excavating or potholing. All utilities crossings shall be scheduled as necessary prior to excavating or boring to allow the Contractor to prevent grade
of alignment conflicts.
C. Provisions shall be mode by the Contractor to keep all existing utilities in service and protect them during construction.
D. Utilities, or interfering portions of utilities. that ore abandoned in place shall be removed by the Contractor to the extent necessary to accomplish the work
the contractor shall plug the remaining exposed ends of exposed utilities prior to backfilling.
E. Contractor shall schedule work with activities to be performed by utilities.
6. PUBLIC RIGHT OF WAY PERMITS
A. Contractor responsible for obtaining all required permits for working in Public Right of Ways( OOOT, CITY, COUNTY).
7.CORDINATION WITH RESIDENCES
A. Contractor shall coordinate with local residences for interruption of sewer service. Provide residences with 24 hour notice prior to disruption of service.
At no time shall a residence hove their sewer service interrupted for any extended period. Work for the day or week will not end until all r esidences hove been reconnected to sewer service.
8. EXCAVATIONS
A. Protect open excavations curing non-working hours with metal plates or other approved methods.
9. SHOP DRAWINGS
A. Submit shop drawings for precost manholes to the engineer prior to costing the base.
JO. TESTING
A. test all piping and manholes in accordance with the specifications.
EC LEGEND
UTILITIES LEGEND
+
Fill slope
Cut slope
~
+
Inlet protection
.....---.-
Sediment fence
.
Orange plastic fence fno work oreoJ
·- ·-
lSIZISIZI
Sediment barrier, straw wattle
~ Bioftlter bogs
~
'V'-
POWER POLE
LIGHT POLE
~
TELEPHONE POLE
ANCHOR
---7BURl ED ELECTRIC CABLE
--u E-OVERHEAD ELECTRIC CABLE - - A E - ELECTRIC MANHOLE
@
TELEPHONE PEDESTAL
0
BURIED TELEPHONE CABLE
--u T-OVERHEAD TELEPHONE CABLE - - A T - TELEPHONE MANHOLE
(§)
SANITARY SEWER
·--------WATER LINE
- - - u w-- WATER CLEANOUT
0
WATER VALVE
0
FIRE HYDRANT
WATER METER
GAS LINE
GAS METER
)j
GAS VALVE
0
BURIED CABLE TELEVISION
- - u TV-OVERHEAD CABLE TELEVISION - -A TV- -
Construction entrance
Flow direction
t
- --G - --
EROSION CONTROL NOTES:
J. Hold a pre-construction meeting of project construction personnel that includes the inspector to discuss erosion and sediment control measures and construction limits. (Schedule A.8.c.i.f3JJ
2. All inspections must be mode in accordance with DEQ J200-C permit requirements. (Schedule A. J2.b ond Schedule B. JI
3. Inspection logs must be kept in accordance with DEQs J200-C permit requirements. (Schedule B.J.c and B.2J
4. Retain a copy of the ESCP and all revisions on site and make it available on request to DEQ, Agent, or the local municipality.
During inactive periods of greater than seven f71 consecutive calendar days. the above records must be retained by the permit registrant but do not need to be at the construction site. (Schedule B.2.cJ
5. All permit registrants must implement the ESCP. F oilure to implement any of the control measures or practices described in the ESCP is a violation of the permit. (Schedule A 8.ol
6. The ESCP must be accurate and reflect site conditions. (Schedule A.J2.c.iJ
7. Submission of all ESCP revisions is not required. Submittal of the ESCP revisions is only under specific conditions. Submit all necessary revision to DEQ or Agent within JO days. fSchedule A.J2.c.iv. and vJ
8. Phase clearing and grading to the maximum extent practical to prevent exposed inactive areas from becoming a source of erosion. (Schedule A.7.o.iiiJ
9. Identify, mark, and protect fby construction fencing or other means) critical riparian areas and vegetation including important trees and associated rooting zones, and vegetation areas to be preserved. Identify vegetative buffer zones between the site and
sensitive areas (e.g .. wetlands!, and other areas to be preserved, especially in perimeter areas. fSchedule A.8.c.i.f JJ and f21J
JO. Preserve existing vegetation when practical and re-vegetate open areas. Re-vegetate open areas when practicable before and ofter grading or construction. Identify the type of vegetative seed mix used. (Schedule A.7.o.vl
J J. Maintain and delineate any existing natural buffer within the 50-feet of waters of the state. (Schedule A.7.b.i.ond f2foXblJ
J2. I nstoll perimeter sediment control, including storm drain inlet protection as well as all sediment basins, traps, and barriers prior to land disturbance. (Schedule A.8.c.i.f5JJ
J3. Control both peak flow rotes and total stormwoter volume, to minimize erosion of outlets and downstream channels and streombonks. (Schedule A.7.cl
J4. Control sediment as needed along the site perimeter and at all operational internal storm drain inlets at all times during construction, both internally and at the site boundary. (Schedule A.7.d.il
J5. Establish concrete truck and other concrete equipment washout areas before beginning concrete work. (Schedule A.8.c.i.f6JJ
J6. Apply temporary and/or permanent soil stobillzotion measures immediately on all disturbed areas as grading progresses.
Temporary or permanent stabilizations measures ore not required for areas that ore intended to be left unvegetoted, such as dirt access roods or utility pole pods.fSchedule A.8.c.ii.f31J
J7. Establish material and waste storage areas. and other non-stormwoter controls. fSchedule A.8.c.i.f711
J8. Prevent tracking of sediment onto public or private roods using BMPs such as: construction entrance, groveled for paved! exits and parking areas. grovel all unpaved roods located onsite, or use on exit tire wash. These BMPs must be in place prior to land- disturbing activities.
(Schedule A 7.d.ii and A.8.c.if4JI
J9. When trucking saturated soils from the site, either use water-tight trucks or drain loads on site. (Schedule A.7.d.ii.f5JJ
20. Control prohibited discharges from leaving the construction site. i.e .. concrete wash-out, wastewater from cleonout of stucco, point and curing compounds. (Schedule A.61
2 J. Use BMPs to prevent or minimize stormwoter exposure to pollutants from spills; vehicle and equipment fueling, maintenance, and storage; other cleaning and maintenance activities; and waste handling activities. These pollutants include fuel, hydraulic fluid, and other olls
from vehicles and machinery, as well as debris. fertilizer, pesticides and herbicides. points. solvents, curing compounds and adhesives from construction operations. (Schedule A.7.e.i.f2JI
22. Implement the following BMPs when applicable: written spill pr evention and response procedures, employee training on spill prevention and proper disposal procedures, spill kits in all vehicles, regular maintenance schedule for vehicles and machinery,
material delivery and storage controls, training and signoge, and covered storage areas for waste and supplies. (Schedule A. 7.e.iii.I
23. Use water, soil-binding agent or other dust control technique as needed to ovoid wind-blown soil. fSchedule A 7.o.ivJ
24. The application rote of fer tilizers used to reestablish vegetation must follow manufacturers recommendations to minimize nutrient releases to surface waters. Exercise caution when using time-release fertilizers within any waterway riparian zone. (Schedule A.9.b.iiiJ
25. If on active treatment system ff or example, electro-coagulation, flocculation, filtration, etc.I for sediment or other pollutant removal is employed, submit on operation and maintenance pion (including system schematic, location of system, location of inlet, location of discharge,
discharge dispersion device design, and a sampling pion and frequency) before operating the treatment system. Obtain pion approval before operating the treatment system. Operate and maintain the treatment system according to monufocturer5h2s specifications. (Schedule A.9.dl
26. Tempororlly stabilize soils at the end of the shift before holidays and weekends, if needed. The registrant is responsible for ensuring that soils ore stable during rain events at all times of the year. (Schedule A 7.bl
27. As needed based on weather conditions, of the end of each workday soil stockpiles must be stabilized or covered, or other BMPs must be implemented to prevent discharges to surface waters or conveyance systems leading to surface waters. (Schedule A 7.e.ii.f2JJ
28. Construction activities must ovoid or minimize excavation and bore ground activities during wet weather. (Schedule A.7.o.iJ
29. Sediment fence: remove trapped sediment before it reaches one third of the above ground fence height and before fence removal. (Schedule A.9.c.iJ
30. Other sediment barriers fsuch as biobogsJ: remove sediment before it reaches two inches depth above ground height and before BMP removal. (Schedule A.9.c.iJ
3 J. Catch basins: clean before retention capacity hos been reduced by fifty percent. Sediment basins and sediment traps: remove trapped sediments before design capacity hos been reduced by f iffy percent and at completion of project.rSchedule A.9.c.iii & iv!
32. Within 24 hours, significant sediment that hos left the construction site, must be remedioted. I nvestigote the cause of the
HEBERLY ENG IN EER IN G
Ci;m;-.cn
Eno:r,l' ·t r lr.';. Crea llv (I
sediment release and implement steps to prevent a recurrence of the discharge within the some 24 hours. Any in-stream clean-up of sediment shall be performed according to the Oregon Division of State Lands required timefrome. (Schedule A.9.b.il
1na li...tf vc 11,, , Cr.
o r..
11
·r £!i\:. I ;:p l!; t .1 ·C!l
33. The intentional washing of sediment into storm sewers or drainage ways must not occur. Vacuuming or dry sweeping and material pickup must be used to cleanup released sediments. !Schedule A.9.b.iil
34. The entire site must be temporarily stabilized using vegetation or a heavy mulch layer, temporary seeding, or other method should all construction activities cease for 30 days or more. (Schedule A.7.f.iJ
OAK CREEK IHDUITR IAL PARK
201 ln ¥an'I Ot"l v· fto s~Q. OA , ''HO
35. Provide temporary stabilization for that portion of the site where construction activities cease for J4 days or more with a covering of blown straw and a tockifier. loose straw, or on adequate covering of compost mulch
COUCUS CCU"1lr Cil' ( (.()11
until work resumes on that portion of the site. (Schedule A.7.f.iil
Du lgnedby ·A«- 11
36. Do not remove temporary sediment control practices until permanent vegetation or other cover of exposed areas is established.
O..oft·d by · .l~Gl 1.1f l.;n s
l!!ri:>'l"J 'J ,
~'It' . ~ !'.fllL
'J 1 ~~ G
GEHERl.L I EROSIOll CONTROL
NOTES
D:\A d om\ Eng i neer ing Pr o j ec t s \ 20 16\Po rr osh l ngro m Dr 5 oc\P I ons\ Rogue L ine PI on Sht _ 1 . dgn
NWP-2016-130
EC Titl e
3/17/20 16
1 :53: 15 PM
~ dcbrntHI e b ~r ID)'
$4 1 ·J11·( ~ \J
~>f
NT2
Sca l e :
100'
Enclosure 1
(
~ · ~~~=~-~-=-~--~=~=~=~-~·~~~~~~-~~~~~~··~'~~~~~~-~7-!~~~~~~=y--~-~ -~1-~7- --1--
==:= 1
~~=====:::::::::::=--=======--=-~-----:_:..:_~::_::,_~ --- - ----------I
'
I
I
I
I
\
\.
I
I·
I
I
Tax Lof:xxx
5 AC
(
HEBERL Y ENG INEER ING
C-:.~·i;-on .!,~on E n c1,·.~ ··rlr. 7, Cr e Q t l~o
2J Contour data obtained from OC public works
same data as shown in Jones and Stocks
deliniatton exhibit dated May 27, 2006.
3J Wetland C Amended 2011
..,__
_ :z_
ll'Ja ll"ul t 'lcl l L/ Cr. L'l'fpo:,,
OAK CREEK INDUSTRIAL PARK
201 ln;)l'OJI Qr lvo RO!ebu'°Q. OR , 9! 410
COUtU S c ru1Tr
C~ [Gl))t
OUIQntdb)·AdcBIC
Drafted br · oldca M
100
D:\Ad o m \Eng ine erin~
NWP-2016-130
Projec t s\2016\Porrosh In gram Di- 5 oc\P l ons\Rogue Line Pion Sht _\ .dgn
Ti t l e De:toi Is
50
3/ 17/20 16
100
~cl.itl.... n.s
'if~f>O ~~1 · 3) ! ·~~1.I
i'l l'o11' .l-C'.R[ll.i 1Er.<.1:,HPJW.\'C!J
!ITE PLAN ·EXIST IHQ CONTOUR!
......,
PLI
I : 55: 30 PM Ro t otAdorn 8E3berSb:yJ I e: 1" =100'
Enclosure 1
~---------------------- -- - ~--------------- ~ --------- - - ~ -~ --!
PRELllllHARY COPY
(
IHFORMA TIOH ONLY
I
0
Wetlands 8,C and D will be impacted
®
Conceptual building footprint & cone. slob
0
Existing entrance to be upgraded to current
std width sidewalk and driveway approach
Some minor grading will be needed to
flatten site, so approximately 12"
of base rock con be placed with geotextile fabric
Fill slopes ore approximately 1:3 or flatter
WETLAND 1.1/TIGATION SITE
4.6 AC
®
Construct 6' fence around perimeter
®
Avoid existing wetlands, see erosion control
plans for silt fence and orange fence
placement.
0
Construct 4' flat bottom ditch. l =700' @1%-1.5%
slope for storm water runoff filtration
For planting details see shf. xxx
®
Projected difused flow from 4' flat bottom
ditch. Flow to be naturally filterd by existing
grosses and other.
(
N
N
N
0
N
N
VJ
I
//
//
ING RAM DRIV E
#
-- -1
3 9 6 ----+--"-~---i>
//
//
//
0
0
L_~---:z:-Note:
1J Proposed Coun tours 1' Jntervol(top boserockJ
2J Intent of plans ore for Joint
Army Corp. & DSL Permit
plans to be finalized before cons!.
HEBERL Y ENG INEER ING
Cr.rrl;'.._..., St'1!iJ ~ n.:; , ..,..,,·1r.-:i. Crt: at/"" Sd u tl..n s
1na .,;... 1~ VoJo. o::.. 'HU& ~ ~ · ·l) i ·~~ll
l'llillf.H~ll£~L 1 £rOAK CREEK IHDUITRIAI PARK
201 tnQr" a11 O.- h o
A os~Q.
oA , un o
COUCl AS COl.fi l Y CR EGO»
0Ul""9d b7 ·A«- N
OrafUdt>y ·f.dc:m M
100
50
loo
lllE PLAH·PROPOSEO CONTOUR!
D:\Ado m\Engineeri ng Projects \ 2016\Por ro sh I ngram Dr 5 oc\P l ons\Rogue L i ne P i on Sh t _ 1 .dgn
NWP-2016-130
T it l e Deta i ls
3/ 17/20 16
: 56: I 4 · PM Ro t otA do m
.......
PL2
I e: 1" =100'
Enclosure 1
B§ b erSc~
PRELllllHARY COPY
(
INFORYATION ONLY
(j)
Wetlands 8,C and D will be impacted
®
Conceptual building footprint & cone. slob
0
Existing entrance to be upgraded to current
std width sidewalk and driveway approach
Some minor grading will be needed to
flatten site, so approximately 12"
of base rock con be placed with geotextile fabric
Fill slopes ore approximately 1:3 or flatter
®
®
Construct 6' fence around perimeter
0
Construct 4' flat bottom ditch, L =700' @1%-1.5%
slope for storm water runoff filtration
For pion ting details see sht. xxx
®
Projected diffused flow from 4' flat bottom
ditch. Flow to be naturally filtered by existing
grosses and other existing vegetation.
Avoid existing wetlands, see erosion control
plans for silt fence and orange fence
placement.
Note:
11 Proposed Countours 1' /ntervof(top boserockJ
21 Intent of plans ore for Joint
Army Corp. & DSL Permit
plans to be finalized before canst.
HEBERL Y ENG INEER ING
C ~r.-~~~
1r;a lli,.H
~t·U ·J
lo;::,·,'l'·:rlr.7. Cre <1tr"'o S:::utl.:n::;
VnlltJ/ {'r. l 'l'f,.lf.ftllf ltL 1 Erfu t:.~t? J s<. f C !.1
OAK CREEK INDUSTR IAL PARK
?Ol lni)'all
~ 1 ... 0
Ro.Srillr9-0A . '9 "410
OOIJGUS C OLr~f r C>f(COH
1
0UfV!tdbJ·AOCJoaN
Crofltdby·A~N
100
50
100
!
llTE PLAH ·PROPOSEO COllTOUR!
D:\Adom\ Engin eer in g Projects \2016\ Porro s h Ingram Dr 5 oc\P l ons\R og ue L ine Pion Sh t _ l .dgn
NWP-2016-130
Tit I e Deto i Is
3/17/ 20 16
2 : 32 :44 PM Rotot.4.dom
"='
PL2
1'1 =100'
Enclosure 1
8lberS~le :
PRELllllNARY COPY
INFORMATION OHL Y
r
~------------ - --- ---- -------------------------------- - ------ - ------ --- -------- --- ---- - ----- - - - - - --------- - --------------------- - --- - ---- - --- ,
560
~
~
~
I
560 1
MINOR GRADING TO FLATTEN
LOT SEE X-SECTION 16+00
FOR AREA TO BE EXCAVATED
fNO FILL WILL BE I MPORTED
EXCEPT BASEROCKJ
12" BASEROCK
SUBGRADE
GEOTEXTILE
"'0
r---: ~
'"'"'
'+- >
'+- ~
,._ v
550
:::
0
'+- >
'+- ~
'+-
0
UJ
0
UJ
· · · · · .. . .. ... ··· · · · · · · · · · · · ·
.. · ··· ·· · ·· · ···· ·· ······· · · · . .. ·· · ·· · ·
-
······· · ··········· · ·
Sip L 378.45
SI . -1.0%
FENCE AT PROPERTY LINE
$
UJ
···· · ·· · ·· ··· · · · · · · ·· ·· ··
----
$
UJ
Si p L 70.71
SI . -0.8%
· 0
"' '°
~~ SILT
· ~
;;;u;
,_"'
'"'
0
I
"'"'
' "'
'+- >
"'"'
. "'
"'..!
.,- 0
... . .. f · .. .. . . . ... . . . . . .. . .. . ... .
I
ssol
I
I
V'
540
-sso
'
-soo
-450
- 400
-3so
I
I
'
'
-300
-2so
-200
-1 so
-1 oo
-5o
o
so
540 I
1
L --- -- ------------- ---- ------------------ --- ----------- -- ----- - ----ST~~~+OQ_,J)Q _________ ____ ________ ____ ______ __ __ _______________________________ J
,---------------------- ----- - ---- - - ---------- --- -------- - ------ - ------ - -- --- - - ------- - --- - --- - ------ -- - -- -- - --- - ---- -- --- - --- - --------------~
I
I
I
I
I
1s10 ,....-~~~~~~~-.--~~~~~~~-,-~~~~~~~-.-~~~~~~~--.~~~~~~~~.,-~~~~~~~--.-~~~~~~~-.--~~~~~~~--,~~~~~~~~.--~~~~~~~.,-~~~~~~~--.-~~~~~~~-.
1
r:;.
MINOR GRADING TO FLATTEN
I
~
LOT SEE X-SECTION 19+00
FOR AREA TO BE FILLED
fNO FILL WILL BE IMPORTED
EXCEPT BASEROCKJ
"'N
"' rJ
"' ~
~
I
s1ol
I
I
I
!
~
I
0
o_·
5
.
~
12" BASEROCK
T Tl
SUBGRADE GEO EX LE
"';;,
1560
I
SILT FENCE AT PROPERTY LINE
NORTH FORK
ROBERTS CREEK
- - - - - - - . . fNO WORK ZONEJ
I
lsso
I
~
. ..,.
:~
~
·
§
"' "'
7 ~
.,_ ,
LO
~~
"' "'
'f' ::::
i
::: ~
'i- m
..;iii
'I-
:
:t: ...,~
6
0
oW
I
7
>
I
I
I
s6o l
'+--
~
6
11.~03'.Ls1ip~L,'.Csl_~~~~~~~~~~~~~~ !
~,c::-:::':=~~::::::::::::~=::'';;:':ijfu"====:=:==;c=;c=c°"~o~w'..,~~:;z~~-::~-:-:--:-:-~bp·L~~....1:-~s,1p~L~2
· · ····
b~
1 SI . - 1.16 1.8
Sip L 35.50
2
-1.0%
.. .. ......... · ·· ·· · · · · ····· · · ·· · ······ · · ·· ·
· ···· · · · .. . ·· ·· ·· · · ··· · · · · · · ··· · · · · · · ..
· · ·· · · · ··· · ·· ···
19
SI. -l. 3'l.
9
1
SI . - 1,3%
.. .. ... . . . ..·
1
II
I
5501
I
I
I
I
I
I1540-sso
- soo
-4so
-400
-3so
-300
-2so
-200
-1 so
-1 oo
-so
o
so
I
5401
I
1
1----- -------------- --------------- - ------ --- --------- - ---- --- ----- ~ TA_J.li±QP~O~-- -- --- -- ----------- - -- - --- - - -- ---- - ---- - ---- -- --- - -- --- ---- -- --- J
Note:
lJSTATIONING PER EXISTING COUNTY
RD.STATIONING.SEE PLAN SHTS FOR
EXACT LOCATION.
2J X-SECTION VERT EXAGERATION X4.
3JBASEROCK WILL BE ONLY IMPORTED
MATERIAL.
HEBER LY ENG INE ERING
C<:.tr~tnn ln cif·~~dr.~.
Ci-1;011.,.., Sol<;tl .. ns
llJil 1'1.H VcllL / r.-. \.ll:p<)JO. o·.
'il~bt ~~!·J)i-~~tJ
liltfJlf.H~ fl£RL 1 Ei:c..1~.HP j ·;,'.n:v
OAK CREEK IHD UITR IAL PARK
lOI ln Q' Ol!'O Orlvo A1u t0u- o. OA · 'J1 410
OOUGl.IS C0t.r1 Tr CR[GO>t
Oulgnedb7·t.,.,..M
Oro1t·db7·4~M
CROISECTIOH I
D:\Adom\Eng in eer i ng Pro j ec t s\2016\Porros h I ngram Dr 5 oc\P l ons\Rogue Li ne Pion Sht _ l .dgn
NWP-2016-130
T i tle De toi l.s
3/ 17/201 6
.......
Pl 3
2 :03 :50 PM Ro t otAd om B§ berStJ'.] I e: 1"= 100'
Enclosure 1
1---- -- ----- - --- - --- - --- - ~ c--- ~
i
I
PRELllllHARY COPY
~~~~~~~~----===
J~ 1f-±-~=-=-=-=-=-=-=-=-=--=---=--=--=-=--=--=--=--=--=--=--=--==~
-=~~~
1- 1
1- - -
INFORllATION ONLY
0
0
0
0
Const. aggregate constructlon entrance -1
fSee drg. no. RDIOOOJ
Const. lnlet protectlon, Type 4, Orange -2
fSee drg.no.RDIOISJ
Const. unsuported sedlment fence - J,800'
fSee drg. no. RD1040J
Const. Concrete truck wash out - 1
Move as opproprlote for constructlon octMtles
(See drg. no. RDJ070J
®
After aggregate base and grodlng ls performed
Seed all exposed sol! prlor to Foll per general notes
Seed mlx :ODOT Klamath Mountoln RongefKMJ
or Coastal Range fCRJ or approved equal
®
Inst. Orange plostlc (no work zoneJfence
Use T post and zlp tles or approved equal
LEGEND
Fl/I slope
Cut slope
[!]
.,.............
··-·-
(
ISIZISl2I
Inlet protectlon
Sedlment fence
Orange plostlc fence (no work oreoJ
Sedlment borrler, straw wattle
~ Blofliter bogs
555
ft ---~
~
'V'-
Constructlon entrance
Flow dlrectlon
STANDARD DRAWINGS
DETENTION
FILTRATION
PONO
RD/006
RD/010
RD/015
RD/030
RDJ03J
RD/032
Constructlon Entrances
Check Dams Type J, 3 and 4
Check Dams Type 2 and 6
Inlet Protectlon Type 2, 3, 6 and 7
Inlet Protectlon Type 4
Sedlment Borrler Type 2, 3 and 4
Temporary Borrler (Aggregate or Brush)
Sedlment Borrler Type 8
Compost Fl/fer Berm Sedlment Borrler Type 9
Sedlment Fence
Temporary Slope Droln Wlth Energy Dlsslpotor
Temporary Scour Bosln
Slope and Channel Mottlng
Tlre Wash Foclllty Type 1 and 2
Temporary Sedlment Trap
Concrete Truck Washout
..-~~~~~~~~~--1
=--- z D:\Adam\Eng i neer i ng Pr ojec t s \ 2016\Pa rrash I ngram Dr 5
NWP-2016-130
ac ~ P lans\Rogue
L i ne P l an Sht _ 1 .dgn
T it l e De t ai Is
HEBERL Y ENG INEER ING
Note:
1J Propose.d Countours J' Interval
2J Intent of plans ore for Jolnt
Army Corp. & DSL Permlt
plans to be flnollzed before canst.
Note: Areas bounded by temporary orange fence
denote protected no work areas such as trees,
wetlands, cultural resources, etc.
C ~ 1r ('.;.'f 1
.!.en .s·J
E r> ~l ,., ·~·11·!r.:;.
Cr ea lJ vo St'lu t l... n.1
lt')J W.,>t : V';H h~
OAK CREEK IHOUITRIAl PAR K
101 1n;ir-03 O..h10 ltout>urQ. OR ,
·«-
N
Or<:ifl tdby· Ad50
3 / 17/2016
0
·u oo
C-OUCU S C.WtH' Clittc.GU
Ou l'T"d ti1 ·
100
~ ll ·J)l·f~ l.l
100
1 : 5 7: 14 PM 1Kota t 4dom
EROSION COHTRO L PLAHS
.......
PL4
I e: 1" = 100'
Enclosure 1
B ~ b erS~
NWP-2016-130
Enclosure 1
NWP-2016-130
Enclosure 1
NWP-2016-130
Enclosure 1
NWP-2016-130
Enclosure 1
NWP-2016-130
Enclosure 1
NWP-2016-130
Enclosure 1
NWP-2016-130
Enclosure 1
NWP-2016-130
Enclosure 1
NWP-2016-130
Enclosure 1
NWP-2016-130
Enclosure 1
NWP-2016-130
Enclosure 1
NWP-2016-130
Enclosure 1
NWP-2016-130
Enclosure 1
NWP-2016-130
Enclosure 1
NWP-2016-130
Enclosure 1
NWP-2016-130
Enclosure 1
NWP-2016-130
Enclosure 1
NWP-2016-130
Enclosure 1
PUBLIC NOTICE
Application for Permit
Issue Date: May 20, 2016
Expiration Date: June 20, 2016
US Army Corps of Engineers No: NWP-2016-130
Oregon Department of State Lands No: 58931-RF
30 Day Notice
Interested parties are hereby notified the U.S. Army Corps of Engineers, Portland District
(Corps) has received an application for a Department of the Army permit for certain work in
waters of the United States, as described below and shown on the attached plans. The Corps
is soliciting comments on the proposed work.
Applicant:
Key Line Construction
Attention: Mr. Tank Parrish
P.O. Box 518
Myrtle Point, Oregon 97458
Email: tank@rogueline.com
Telephone: (541) 559-1085
Applicant's Agent: Mr. Adam Heberly
Heberly Engineering
1298 Wolf Valley Drive
Umpqua, Oregon 97486
Email: heberlyengineering@gmail.com
Telephone: (541) 459-6195
Location: The project site is near the intersection of Ingram Drive and Grant Smith Road,
Roseburg, Oregon and is adjacent to North Fork Roberts Creek, mile 1.0 from its confluence
with Roberts Creek. The site is in Section 12, Township 28 South, Range 6 West.
Latitude and Longitude: 43.149438 North, -123.363137 West
Waterway: Approximately 1.86 acres of palustrine wetlands and 0.01 acre of other water are
adjacent to Robert's Creek.
Project Purpose: The applicant's stated purpose is to develop facilities for an industrial park.
Project Description: The applicant would fill a minimum of 1.86 acres of palustrine wetland
discharging approximately 300 cubic yards of base and finish aggregate to construct shop and
office space, approximately 4.02 acres of heavy equipment parking, and associated facilities
on the five-acre site. The proposed project would include two bio-swales along the project
perimeter to treat stormwater runoff from 4.5 acres of impervious surface. The north bio-swale
Corps No. NWP-2016-130
Page 1 of 6
would be 420 feet long by two feet deep by eight feet wide and the south bio-swale would be
315 feet long by two deep wide by 8 feet wide respectively. The outfall for the bio-swales would
run parallel to Interstate 5 and discharge to 7.88 acres of abutting wetland. Each bio-swale
would be constructed at a 1:4 percent slope.
Mitigation: The applicant has proposed to use compensatory wetland mitigation credits from
the Umpqua Interior Foothills site from the In Lieu Fee program for compensatory mitigation in
the permit application. If a permit is issued, the Corps will determine the type and amount of
compensatory mitigation necessary to offset environmental losses from the proposed project.
Drawings: Nine (9) drawings are attached and labeled Corps No. NWP-2016-130. Copies of
this public notice, which have been mailed or otherwise physically distributed, feature project
drawings in black and white. The electronic version features those drawings in color, which we
think more accurately illustrates the proposed project. To access the electronic version of this
public notice, go to the Portland District website at http://www.nwp.usace.army.mil/ and select
Regulatory Branch Permit Information. At the Regulatory page select Regulatory Public
Notices.
Additional Information: The proposed project location is immediately north of an estimated
4.6 acre mitigation site and south of 7.88 acres of wetland delineated in 2005.
Authority: The proposed project will be evaluated under the following:
Section 404, Clean Water Act (33 U.S.C. 1344), for discharge of dredged or fill material
into waters of the United States.
Clean Water Act Section 404(b)(1) Guidelines: The described discharge will be evaluated
for compliance with guidelines promulgated by the U.S. Environmental Protection Agency
under authority of Section 404(b)(1) of the Clean Water Act. The 404(b)(1) Guidelines are the
substantive criteria used in evaluating discharges of dredged or fill material into waters of the
United States. Should a permit be issued, the Corps will evaluate the fill material source (i.e.,
borrow site) prior to the start of construction.
Water Quality Certification: Section 401 of the Clean Water Act (33 U.S.C. 1341) requires
applicants to obtain a water quality certification for proposed discharges into waters of the
United States. A permit for the described work will not be issued until certification has been
issued or is waived from the certifying state. Attached is the state's notice for a water quality
certification.
Endangered Species: Section 7 of the Endangered Species Act (ESA) (16 U.S.C 1536)
requires federal agencies to consult with the National Marine Fisheries Service (NMFS) and/or
U.S. Fish and Wildlife Service (USFWS) on all actions that may affect a species listed (or
proposed for listing) under the ESA as threatened or endangered or that may adversely modify
designated critical habitat. The Corps' preliminary review indicates the described activity may
affect an endangered or threatened species or designated critical habitat. The Corps will
initiate consultation under Section 7 of the ESA. The Corps will complete the required
consultation prior to finalizing a permit decision.
Corps No. NWP-2016-130
Page 2 of 6
Essential Fish Habitat: Section 305(b)(2) of the Magnuson-Stevens Fishery Conservation
and Management Act (MSA) as amended (16 U.S.C 1855), requires Federal agencies to
consult with the NMFS on all actions, or proposed actions, permitted, funded, or undertaken by
the agency, that may adversely affect Essential Fish Habitat (EFH). The Corps' preliminary
review indicates the described activity would adversely affect EFH at the project location or in
the vicinity. The Corps will initiate consultation under Section 305(b)(2) of the MSA. The Corps
will complete the required consultation prior to finalizing a permit decision.
Historic Properties/Cultural Resources: Section 106 of the National Historic Preservation
Act of 1966, as amended (16 U.S.C. 470), requires Federal agencies to consult with the
appropriate State and/or Tribal Historic Preservation Officer to take into account the effects of
actions they undertake or permit on historic properties listed in or eligible for listing in the
National Register of Historic Places. The Corps' preliminary review indicates an historic
properties investigation has been conducted within the permit area. No sites determined
eligible for or listed on the National Register of Historic Places were found to exist within the
permit area.
This notice has been provided to the State Historic Preservation Office (SHPO), interested
Native American Indian Tribes, and other interested parties. If you have information pertaining
to cultural resources within the permit area, please provide this information to the Corps' project
manager identified at the end of this notice to assist in a complete evaluation of potential
effects.
State and Local Authorizations: The proposed project is not regulated by the Douglas
County comprehensive plan and land use regulations. The applicant will be applying for the
following additional governmental authorizations for the project: Department of State Lands
Removal-Fill permit and Department of Environmental Quality individual water quality permit.
Public Hearing: Any person may request in writing within the comment period specified in this
notice that a public hearing be held to consider this application. Requests for public hearings
shall state with particularity the reasons for holding a public hearing.
Evaluation: The decision whether to issue a permit will be based on an evaluation of the
probable impact, including cumulative impacts, of the described activity on the public interest.
That decision will reflect the national concern for both protection and utilization of important
resources. The benefit, which reasonably may be expected to accrue from the described
activity, must be balanced against its reasonably foreseeable detriments. All factors, which
may be relevant to the described activity will be considered including the cumulative effects
thereof; among those are conservation, economics, aesthetics, general environmental
concerns, wetlands, historic properties, fish and wildlife values, flood hazards, floodplain
values, land use, navigation, shoreline erosion and accretion, recreation, water supply and
conservation, water quality, energy needs, safety, food and fiber production, mineral needs,
consideration of property ownership and, in general, the needs and welfare of the people.
The Corps is soliciting comments from the public; Federal, state, and local agencies and
officials; Indian Tribes; and other interested parties in order to consider and evaluate the
impacts of the proposed project. Comments received will be considered by the Corps to
determine whether to issue, modify, condition or deny a permit for this proposal. Comments
are used in the preparation of an Environmental Assessment and/or an Environmental Impact
Corps No. NWP-2016-130
Page 3 of 6
Statement pursuant to the National Environmental Policy Act. Comments are also used to
determine the need for a public hearing.
Submitting Comments: Interested parties are invited to provide comments on the proposed
project. Comments may be submitted by conventional mail or email. All comments received
will be considered in determining whether authorizing the work would be contrary to the public
interest.
Either conventional mail or e-mail comments must include the Corps reference number as
shown on page 1 and include the commenter's name and address. In order to be accepted, email comments must originate from the author's e-mail account and must include on the subject
line of the e-mail message the Corps reference number. All comments received will become
part of the administrative record and are subject to public release under the Freedom of
Information Act including any personally identifiable information such as names, phone
numbers, and addresses.
Additional information about the proposed project may be obtained from the Corps Project
Manager listed below. All comments, whether by conventional mail or email, must be received
no later than the expiration date of this public notice to ensure consideration. Comments should
be submitted to the following mailing address or email address:
U.S. Army Corps of Engineers
Ms. Anita Andazola
Eugene Field Office
211 E. 7th Avenue, Suite 105
Eugene, Oregon 97401-2722
Email: anita.m.andazola@usace.army.mil
Telephone: (541) 465-6894
Corps No. NWP-2016-130
Page 4 of 6
PUBLIC NOTICE
Oregon Department of Environmental Quality (DEQ)
Water Quality 401 Certification
Notice Issued: May 20, 2016
Written Comments Due: June 20, 2016
Corps of Engineers No: NWP-2016-130
Oregon Department of State Lands No: 58931-RF
WHO IS THE APPLICANT: Key Line Construction
LOCATION OF CERTIFICATION ACTIVITY: See attached U.S. Army Corps of Engineers
public notice.
WHAT IS PROPOSED: See attached U.S. Army Corps of Engineers public notice on the
proposed project.
NEED FOR CERTIFICATION: Section 401 of the Federal Clean Water Act requires applicants
for Federal permits or licenses to provide the Federal agency a water quality certification from
the State of Oregon if the proposed activity may result in a discharge to waters of the state.
DESCRIPTION OF DISCHARGES: See attached U.S. Army Corps of Engineers public notice
on the proposed project.
WHERE TO FIND DOCUMENTS: Documents and materials related to water quality issues as
a result of the proposal are available for examination and copying at Oregon Department of
Environmental Quality, 401 Water Quality Certification Coordinator, Northwest Region,
700 NE Multnomah Street, Suite 600, Portland, Oregon 97232. Other project materials are
available by contacting the Corps per the attached public notice.
Scheduling an appointment will ensure that water quality documents are readily accessible
during your visit. To schedule an appointment please call DEQ Water Quality at Northwest
Region at (503) 229-5263.
Any questions on the water quality certification process may be addressed to the 401 Program
Coordinator at (503) 229-6030 or toll free within Oregon at (800) 452-4011. People with
hearing impairments may call the Oregon Telecommunications Relay Service at 1-800-7352900.
Corps No. NWP-2016-130
Page 5 of 6
PUBLIC PARTICIPATION:
Public Hearing: Oregon Administrative Rule (OAR) 340-48-0032 (2) states that "The Corps
provides public notice of and opportunity to comment on the applications, including the
application for certification, provided that the department (DEQ), in its discretion, may provide
additional opportunity for public comment, including public hearing."
Written comments:
Written comments on project elements related to water quality must be received at the Oregon
Department of Environmental Quality by 5 p.m. on the date specified in the upper right section
on page one of this notice. Written comments may be emailed, mailed or faxed as described
below:
Email - 401publiccomments@deq.state.or.us
Mail - Oregon Department of Environmental Quality, Northwest Region
700 NE Multnomah Street, Suite 600
Portland, Oregon 97232
Attn: 401 Water Quality Certification Coordinator
Fax - (503) 229-6957
WHAT HAPPENS NEXT: DEQ will review and consider all comments received during the
public comment period. Following this review, certification of the proposal may be issued as
proposed, issued with conditions, or denied. You will be notified of DEQ's final decision if you
submit comments during the comment period. Otherwise, if you wish to receive notification,
please call or write DEQ at the above address.
ACCESSIBILITY INFORMATION: This publication is available in alternate format (e.g. large
print, Braille) upon request. Please contact DEQ Office of Communications and Outreach at
(503) 229-5317 or toll free within Oregon at 1-800-452-4011 to request an alternate format.
People with a hearing impairment can receive help by calling the Oregon Telecommunications
Relay Service at 1-800-735-2900.
Corps No. NWP-2016-130
Page 6 of 6