DREDGING FOR ACCESS AND WELL LOCATION IN TERREBONNE PARISH
NAME OF APPLICANT: Apache Corporation, c/o T. Baker Smith, 107 Global Circle, Lafayette, LA 70503
LOCATION OF WORK: Within the Terrebonne Basin, in the West-Central Louisiana Coastal hydrologic unit (HUC 08090302); T17S-R15E, Sections 32, 33, 34, 41, and 42; beginning at the Gulf Intracoastal Waterway and ending in Northwest Gibson Field, approximately 14 miles south of Morgan City, Louisiana, in Terrebonne Parish.
CHARACTER OF WORK: Apache Corporation proposes to drill the Bagby 32-1 well location. To access the site, approximately 7,825 linear feet of open water will be dredged with a bucket dredge to obtain suitable depths for access. An additional 787 linear feet will be propwashed near the Gulf Intracoastal Waterway. Approximately 1.2 acres and 14.1 acres of non-vegetated waterbottoms will impacted by propwashing and bucket dredging, respectively. The spoil material will be spread over 8,917 linear feet at heights conducive to marsh establishment, which will impact 11.1 acres of open water. Due to the lack of impacts to vegetated wetlands, mitigation will likely not be required. Should it be determined that mitigation is needed, the applicant proposes to purchase wetland credits from a Corps approved mitigation bank located in the watershed.