Run scraper

MVN-2015-01796-WLL

Basic information

Fill out these two fields at minimum.

— or —

How Big?

Where?

Links to source documents

Raw text

You can copy from here when filling out the rest of the page.

WATER QUALITY ENHANCEMENT PROJECT IN ST MARTIN PARISH

Name of Applicant: St Martin Parish Government, c/o: Sellers & Associates, Inc., 148-B Easy Street, Lafayette, LA 70506. Location of Work: Beau Bayou Water Management Unit, approximately 14 miles downstream from Butte Larose, Louisiana in St. Martin Parish, (Lat 30.145N, Long -91.595W), as shown on the attached drawings. Project is located in the Atchafalaya Basin Watershed H.U.C. 08080101. Character of Work: Conduct mechanized clearing, snagging, excavation and placement of spoil material along 9 miles of existing channels within the Beau Bayou Water Management Unit. Vegetative debris and excessive overgrowth of woody vegetation and trees will be removed all for the purpose of restoring and opening channels for the purpose of restoring water quality, sheetflow, and circulation within the surrounding swamp and opening existing spoil banks to reduce un-natural ponding. The proposed project will impact the following: Total Direct Wetland Impacts (Fill, Excavation & Clearing): 51.6 acres Total Excavation of Wetlands: 10.9 acres; 67,939 Cubic Yards Total Excavation of Waterbottoms: 27.0 acres; 68,592 cubic yards Total Fill in Wetlands: 34.1 acres; 102,515 cubic yards Total Clearing of Forested Wetlands: 6.6 acres; 1,287 cubic yards The applicant proposes to compensate for all unavoidable, project related impacts to jurisdictional wetlands through the purchase of mitigation credits from a Corps approved mitigation bank.

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits