PROPOSED DRAINAGE DITCH AND MAINTENANCE ACCESS ROAD ALONG LA HIGHWAY 1032 (4H CLUB ROAD) NEAR DENHAM SPRINGS

Basic information

Fill out these two fields at minimum.

— or —

How Big?

Where?

Links to source documents

Raw text

You can copy from here when filling out the rest of the page.

PROPOSED DRAINAGE DITCH AND MAINTENANCE ACCESS ROAD ALONG LA HIGHWAY 1032 (4H CLUB ROAD) NEAR DENHAM SPRINGS, LOUISIANA IN LIVINGSTON PARISH

NAME OF APPLICANT: Livingston Parish Gravity Drainage District No. 1, c/o Geosyntec Consultants, Inc., Attn: Mr. Spencer Varnado, 5420 Corporate Blvd., Suite 22, Baton Rouge, Louisiana 70808. LOCATION OF WORK: Located along and northeast LA Highway 1032 (4H Club Road), in Section 44, Township 7 South, Range 3 East, within the Amite River hydrologic unit (HUC 08090302), near Denham Springs, Louisiana, in LIVINGSTON Parish, as shown on the enclosed drawings (Latitude 30.41405 N Longitude -90.94444 W). The levee point of beginning starts adjacent to LA Highway 1032 and continue northeasterly for approximately 1100 feet. CHARACTER OF WORK: The applicant has requested a Department of the Army authorization to clear, grade, excavate, and deposit fill material to construct an approximate 1,100-foot drainage ditch to alleviate flooding and improve drainage in a growing residential area of Denham Springs. The proposed ditch will tie into an existing culvert at LA Highway 1032 and flow away from residential areas. An access road which is to be utilized in future maintenance of the ditch is also proposed to be constructed immediately adjacent to the proposed drainage ditch. Approximately 408 cubic yards of excavated native soil and 23 cubic yards of hauled in aggregate material are to be placed in jurisdictional forested wetlands. The proposed project proposes to directly impact approximately 0.6 acre of jurisdictional forested wetlands. The applicant has designed the project to avoid and minimize direct and secondary adverse impacts to the maximum extent practicable. As compensation for unavoidable wetland impacts, the applicant proposes to use a Corps approved mitigation bank within the watershed of impact.

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits