You can copy from here when filling out the rest of the page.
PERFORM LEVEE IMPROVEMENTS TO EXISTING LOWER DULARGE EAST LEVEE SYSTEM NEAR THERIOT, LOUISIANA IN TERREBONNE PARISH
NAME OF APPLICANT: Terrebonne Levee and Conservation District, c/o CB&I, Attn: Ms. Charlotte Liner, 197 Elysian Drive, Houma, Louisiana 70363.
LOCATION OF WORK: Located along an existing approximate 38,700-linear foot levee along LA Highway 315, proceeding southerly from its intersection with Falgout Canal Road, in Sections 24, 25, 35, 36, Township 19 South, Range 16 East, and in Sections 2, 3, 9, 10, 16, 17, Township 20 South, Range 16 East, within the West Central Louisiana Coastal hydrologic unit (HUC 08090302), located south of Falgout Canal, near Theriot, Louisiana, in TERREBONNE Parish, as shown on the enclosed drawings (Latitude 29.40917 N Longitude -90.77943 W).
CHARACTER OF WORK: Perform levee improvements to the existing Lower Dularge East Levee System. The proposed project will recontour the existing levee system by raising the elevation from a +6.0 foot elevation to a +12 foot elevation with a +10 foot settlement. Approximately 1,085,000 cubic yards of native material are proposed to be placed on site as fill during construction activities. Approximately 970,000 cubic yards of native fill material is to be hauled in and 115,000 cubic yards of native material is to be excavated from the existing levee and placed as fill for the proposed levee improvements. Approximately 28 acres of potentially jurisdictional non-vegetated waterbottoms, and 44 acres of potentially jurisdictional wetlands would be directly impacted as a result of project implementation. A jurisdictional determination request is currently pending. The applicant has designed the project to avoid and minimize direct and secondary adverse impacts to the maximum extent practicable and is proposing to utilize the existing levee to the maximum extent practicable. The applicant has proposing to mitigate for project impacts by purchasing credits at a Corps approved bank or by submitting a permittee responsible mitigation plan (PRMP). If the applicant submits a PRMP to offset project related impacts, an addendum Public Notice will be issued for review.