PERFORM LEVEE IMPROVEMENTS TO EXISTING LOWER DULARGE WEST LEVEE SYSTEM NEAR THERIOT

Basic information

Fill out these two fields at minimum.

— or —

How Big?

Where?

Links to source documents

Raw text

You can copy from here when filling out the rest of the page.

PERFORM LEVEE IMPROVEMENTS TO EXISTING LOWER DULARGE WEST LEVEE SYSTEM NEAR THERIOT, LOUISIANA IN TERREBONNE PARISH

NAME OF APPLICANT: Terrebonne Levee and Conservation District, c/o CB&I, Attn: Ms. Charlotte Liner, 197 Elysian Drive, Houma, Louisiana 70363. LOCATION OF WORK: NAME OF APPLICANT: Terrebonne Levee and Conservation District, c/o CB&I, Attn: Ms. Charlotte Liner, 197 Elysian Drive, Houma, Louisiana 70363. LOCATION OF WORK: Located along an existing approximate 32,600-linear foot levee along the west side of LA Highway 315, proceeding southerly from its intersection with Falgout Canal Road, in Sections 23, 24, 26, 35, 34, Township 19 South, Range 16 East, and in Sections 3, 4, 9, 16, 17, Township 20 South, Range 16 East, within the West Central Louisiana Coastal hydrologic unit (HUC 08090302), located south of Falgout Canal, near Theriot, Louisiana, in TERREBONNE Parish, as shown on the enclosed drawings (Latitude 29.40751 N Longitude -90.78887 W). The levee point of beginning starts at the beginning of Brady Road and continues south to its ending point at the Bayou Dularge Structure. CHARACTER OF WORK: The applicant has requested a Department of the Army authorization to perform levee improvements to the existing Lower Dularge East Levee System. The proposed project will recontour the existing levee system by raising the elevation from an average elevation ranging from + 5.6 foot to + 8.5 foot elevation to a + 12 foot elevation. Approximately 475,000 cubic yards of native material are proposed to be excavated from the adjacent borrow canal and placed on site as fill during construction activities. Approximately 56 acres of potentially jurisdictional waterbottoms and 17 acres of potentially jurisdictional wetlands would be directly impacted as a result of project implementation. A jurisdictional determination request is currently pending. The project is located in a previously authorized right-of-way that has been previously mitigated for under MVN-2003-1180-CY (P20021319). The applicant has designed the project to avoid and minimize direct and secondary adverse impacts to the maximum extent practicable and is proposing to utilize the existing levee to the maximum extent practicable.

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas