Home

San Francisco District

Run scraper

Basic information

Fill out these two fields at minimum.

— or —

How Big?

Where?

Links to source documents

Raw text

You can copy from here when filling out the rest of the page.

San Francisco-Oakland Bay Bridge East Span Seismic Safety Project Permit Modification – Pier E4 – E18 Demolition

The California Department of Transportation has applied to the U.S. Army Corps of Engineers, San Francisco District, for a modification to a Department of the Army Individual Permit to replace the original east span of the San Francisco-Oakland Bay Bridge with a new bridge immediately to the north. This modification would allow for the controlled implosion instead of the mechanical demolition of Piers E4 - E18 of the original bridge.

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas