The application is for the placement of fill material related to the proposed replacement of the Kiamichi River Bridge

Basic information

Fill out these two fields at minimum.

— or —

How Big?

Where?

Links to source documents

Raw text

You can copy from here when filling out the rest of the page.

The application is for the placement of fill material related to the proposed replacement of the Kiamichi River Bridge, overflow bridge, and widening of US 271 in Pushmataha County.

US 271 is a two-lane highway running north from the town of Antlers in southeast Oklahoma. This section of highway was constructed in 1934 and does not meet the current highway standards for safety and design. Two bridges would be replaced. Bridge A over Kiamichi River is only 25 feet wide with no shoulders and is considered structurally deficient with deteriorating superstructure. This bridge is 519 feet long. The overflow bridge (Bridge B) is only 27 feet wide with no shoulders, 289 feet long and is also considered functionally obsolete due to the narrow width. The proposed federal-aid action will consist of the replacement of the bridges over the Kiamichi River and its overflow channel with at least 38 feet wide bridges as well as grading, drainage, and surfacing activities associated with the bridge replacement on an offset alignment to the east of the present facility. Concrete for piers would be placed below 0.005 acre of the Ordinary High Water Mark of the Kiamichi River. The new adjacent alignment of US 271 project would result in discharge of fill material (soil) into jurisdictional forested and emergent wetlands resulting in 3.52 acres (2.11 acres of forested wetland impacts and 1.41 acres of emergent wetland impacts) of permanent loss of waters of the United States. The existing highway will remain open to through traffic during construction, with both directions of traffic carried on existing westbound lanes. No new permanent rights-of-way would be required to construct the proposed bridges and approaches.

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas