On June 1

Basic information

Fill out these two fields at minimum.

— or —

How Big?

Where?

Links to source documents

Raw text

You can copy from here when filling out the rest of the page.

On June 1, 2016, the U.S. Army Corps of Engineers published in the Federal Register its proposal to reissue the 50 existing nationwide permits (NWPs) and issue two new NWPs. On June 7, 2016, the Wilmington District proposed renewal of and revision to the regional general conditions added to the Nationwide Permits, for work in federal waters in NC, to ensure that no more than minimal impacts occur to the aquatic environment, as intended by this program. The District set up a web page to track the re-authorization process.

Please download PDF of Notice for formatting and completeness. INITIAL PUBLIC NOTICE

NATIONWIDE PERMIT REISSUANCE REQUEST FOR COMMENTS

On June 1, 2016, the U.S. Army Corps of Engineers published in the Federal Register its proposal to reissue the 50 existing nationwide permits (NWPs) and issue two new NWPs.

Nationwide permits are general permits issued on a nationwide basis to streamline the authorization of activities that result in no more than minimal individual and cumulative adverse environmental effects. Many of the proposed NWPs require notification to the district engineer before commencing those activities, to ensure that the activities authorized by those NWPs cause no more than minimal individual and cumulative adverse environmental effects.

National Issues Concerning the Proposed NWPs: The Federal Register notice is the public’s opportunity to comment on the proposed NWPs, general conditions, and definitions. Comments on national issues relating to these NWPs should be submitted to docket number COE-2015-0017 at www.regulations.gov, or by email to NWP2017@usace.army.mil or by mail to Headquarters, U.S. Army Corps of Engineers, Directorate of Civil Works, ATTN: CECW-CO-R, 441 G Street, N.W., Washington, D.C. 20314-1000. Instructions for submitting comments are provided in the June 1, 2016 Federal Register notice. Comments on the proposed NWPs are due by August 1, 2016.

Regional Issues Concerning the Proposed NWPs, Including Regional Conditioning: Division engineers are authorized to add regional conditions specific to the needs and/or requirements of a particular region or state. Regional conditions are important mechanisms to ensure that the adverse environmental effects of activities authorized by the NWPs are no more than minimal, both individually and cumulatively. Division engineers may also suspend or revoke specific NWPs in certain geographic areas (e.g., states or watersheds) or high-value aquatic systems where the adverse environmental effects caused by activities authorized by those NWPs may be more than minimal. An enclosure for this public notice (Enclosure A) lists the proposed regional conditions currently under consideration by the Wilmington District for the State of North Carolina. This public notice and the proposed regional conditions can also be viewed on the Districts Website at http://www.saw.usace.army.mil/Missions/RegulatoryPermitProgram/Permits/NationwidePermits/2017NWP.aspx. The Wilmington District is seeking comments on the proposed regional conditions and seeking comments on the need for additional regional conditions to help ensure that the adverse environmental effects of activities authorized by the proposed NWPs are no more than minimal, individually and cumulatively. Unless otherwise noted, all proposed regional conditions listed on this enclosure are applicable for activities in North Carolina. Comments on regional issues relating to the proposed NWPs and proposed regional conditions should be sent by mail to Mr. Ronnie Smith, Regulatory Division, U.S. Army Corps of Engineers, 69 Darlington Avenue, Wilmington, North Carolina 28403 or by email to Ronnie.D.Smith@usace.army.mil. Comments relating to regional conditions are due by August 1, 2016. Similar public notices proposing regional conditions in other regions or States are being published concurrently by other division or district offices.

After the final NWPs are issued, the final regional conditions will be issued after they are approved by the Division Commander. After the final NWP are issued, States and Tribes will make their Clean Water Act Section 401 (401) water quality certification and States will make their Coastal Zone Management Act (CZMA) consistency determination decisions. The 401/CZMA decisions must be made within 90 days of the Federal Register notice announcing the issuance of the NWPs. The final NWPs will go into effect on March 19, 2017.

Draft decision documents for each of the proposed NWPs, which include environmental documentation prepared for the purposes of the National Environmental Policy Act, have been written by Corps Headquarters. The decision documents will address compliance of the NWPs with the requirements for issuance under the Corps general permit authority. These documents, as well as the proposed NWPs, are available for viewing at www.regulations.gov, docket number COE-2015-0017. Final decision documents will be prepared for the NWPs that are issued. In addition, the final national NWP decision documents will be supplemented by division engineers to address their decisions concerning regional conditions for the NWPs.

Below is an index of the proposed NWPs and conditions. Anyone wishing to provide comments may obtain a full text copy of the NWPs through the Corps Home Page at http://www.usace.army.mil/Missions/CivilWorks/RegulatoryProgramandPermits/NationwidePermits.aspx , at www.regulations.gov in docket number COE-2015-0017, or at the Federal Register at https://www.gpo.gov/fdsys/pkg/FR-2016-06-01/pdf/2016-12083.pdf.

Index of Proposed Nationwide Permits, Conditions, and Definitions

Nationwide Permits

1. Aids to Navigation

2. Structures in Artificial Canals

3. Maintenance

4. Fish and Wildlife Harvesting, Enhancement, and Attraction Devices and Activities

5. Scientific Measurement Devices

6. Survey Activities

7. Outfall Structures and Associated Intake Structures

8. Oil and Gas Structures on the Outer Continental Shelf

9. Structures in Fleeting and Anchorage Areas

10. Mooring Buoys

11. Temporary Recreational Structures

12. Utility Line Activities

13. Bank Stabilization

14. Linear Transportation Projects

15. U.S. Coast Guard Approved Bridges

16. Return Water From Upland Contained Disposal Areas

17. Hydropower Projects

18. Minor Discharges

19. Minor Dredging

20. Response Operations for Oil or Hazardous Substances

21. Surface Coal Mining Activities

22. Removal of Vessels

23. Approved Categorical Exclusions

24. Indian Tribe or State Administered Section 404 Programs

25. Structural Discharges

26. [Reserved]

27. Aquatic Habitat Restoration, Establishment, and Enhancement Activities

28. Modifications of Existing Marinas

29. Residential Developments

30. Moist Soil Management for Wildlife

31. Maintenance of Existing Flood Control Facilities

32. Completed Enforcement Actions

33. Temporary Construction, Access, and Dewatering

34. Cranberry Production Activities

35. Maintenance Dredging of Existing Basins

36. Boat Ramps

37. Emergency Watershed Protection and Rehabilitation

38. Cleanup of Hazardous and Toxic Waste

39. Commercial and Institutional Developments

40. Agricultural Activities

41. Reshaping Existing Drainage Ditches

42. Recreational Facilities

43. Stormwater Management Facilities

44. Mining Activities

45. Repair of Uplands Damaged by Discrete Events

46. Discharges in Ditches

47. [Reserved]

48. Commercial Shellfish Aquaculture Activities

49. Coal Remining Activities

50. Underground Coal Mining Activities

51. Land-Based Renewable Energy Generation Facilities

52. Water-Based Renewable Energy Generation Pilot Projects

A. Removal of Low-Head Dams

B. Living Shorelines

Nationwide Permit General Conditions

1. Navigation

2. Aquatic Life Movements

3. Spawning Areas

4. Migratory Bird Breeding Areas

5. Shellfish Beds

6. Suitable Material

7. Water Supply Intakes

8. Adverse Effects from Impoundments

9. Management of Water Flows

10. Fills Within 100-Year Floodplains

11. Equipment

12. Soil Erosion and Sediment Controls

13. Removal of Temporary Fills

14. Proper Maintenance

15. Single and Complete Project

16. Wild and Scenic Rivers

17. Tribal Rights

18. Endangered Species

19. Migratory Bird and Bald and Golden Eagle Permits

20. Historic Properties

21. Discovery of Previously Unknown Remains and Artifacts

22. Designated Critical Resource Waters

23. Mitigation

24. Safety of Impoundment Structures

25. Water Quality

26. Coastal Zone Management

27. Regional and Case-by-Case Conditions

28. Use of Multiple Nationwide Permits

29. Transfer of Nationwide Permit Verifications

30. Compliance Certification

31. Activities Affecting Structures or Works Built by the United States

32. Pre-Construction Notification

District Engineer’s Decision

Further Information

Definitions

Best management practices (BMPs)

Compensatory mitigation

Currently serviceable

Direct effects

Discharge

Enhancement

Ephemeral stream

Establishment (creation)

High Tide Line

Historic property

Independent utility

Indirect effects

Intermittent stream

Loss of waters of the United States

Non-tidal wetland

Open water

Ordinary high water mark

Perennial stream

Practicable

Pre-construction notification

Preservation

Re-establishment

Rehabilitation

Restoration

Riffle and pool complex

Riparian areas

Shellfish seeding

Single and complete linear project

Single and complete non-linear project

Stormwater management

Stormwater management facilities

Stream bed

Stream channelization

Structure

Tidal wetland

Vegetated shallows

Waterbody

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas