Home

Kansas City District

Run scraper

On June 1

Basic information

Fill out these two fields at minimum.

— or —

How Big?

Where?

Links to source documents

Raw text

You can copy from here when filling out the rest of the page.

On June 1, 2016, the U.S. Army Corps of Engineers published in the Federal Register its proposal to reissue the 50 existing nationwide permits (NWPs) and issue two new NWPs.

Comments on the proposed NWPs are due by August 1, 2016.

Separate public notices for the State of Missouri and the State of Kansas announcing the proposed reissuance and request for comments are posted below. Comments relating to the Missouri and Kansas regional conditions are due by July 22, 2016.

On June 1, 2016, the U.S. Army Corps of Engineers published in the Federal Register its proposal to reissue the 50 existing nationwide permits (NWPs) and issue two new NWPs. Comments on the proposed NWPs are due by August 1, 2016. Separate public notices for the State of Missouri and the State of Kansas announcing the proposed reissuance and request for comments are posted below. Comments relating to the Missouri and Kansas regional conditions are due by July 22, 2016.

PUBLIC NOTICE Nationwide Permit Reauthorization Issue Date: June 7, 2016 Expiration Date: August 1, 2016

US Army Corps of Engineers Kansas City District ______________________________________________________________________________ INITIAL PUBLIC NOTICE NATIONWIDE PERMIT REISSUANCE REQUEST FOR COMMENTS On June 1, 2016, the U.S. Army Corps of Engineers published in the Federal Register its proposal to reissue the 50 existing nationwide permits (NWPs) and issue two new NWPs. NWPs are general permits issued on a nationwide basis to streamline the authorization of activities that result in no more than minimal individual and cumulative adverse environmental effects. Many of the proposed NWPs require notification to the district engineer before commencing those activities, to ensure that the activities authorized by those NWPs cause no more than minimal individual and cumulative adverse environmental effects. National Issues Concerning the Proposed NWPs: The Federal Register notice is the public's opportunity to comment on the proposed NWPs, general conditions, and definitions. Comments on national issues relating to these NWPs should be submitted to docket number COE-20150017 at www.regulations.gov, or by email to NWP2017@usace.army.mil or by mail to Headquarters, U.S. Army Corps of Engineers, Directorate of Civil Works, ATTN: CECW-CO-R, 441 G Street, N.W., Washington, D.C. 20314-1000. Instructions for submitting comments are provided in the June 1, 2016 Federal Register notice. Comments on the proposed NWPs are due by August 1, 2016. Draft decision documents for each of the proposed NWPs, which include environmental documentation prepared for the purposes of the National Environmental Policy Act, have been written by Corps Headquarters. The decision documents will address compliance of the NWPs with the requirements for issuance under the Corps general permit authority. These documents, as well as the proposed NWPs, are available for viewing at www.regulations.gov, docket number COE-2015-0017. Final decision documents will be prepared for the NWPs that are issued. In addition, the final national NWP decision documents will be supplemented by division engineers to address their decisions concerning regional conditions for the NWPs. An index of the proposed NWPs and conditions is appended at the end of this notice. Anyone wishing to provide comments may obtain a full text copy of the NWPs through the Corps Home Page at: http://www.usace.army.mil/Missions/CivilWorks/RegulatoryProgramandPermits/NationwidePermits.aspx at www.regulations.gov in docket number COE-2015-0017, or at the Federal Register at https://www.gpo.gov/fdsys/pkg/FR-2016-06-01/pdf/2016-12083.pdf.

After the final NWPs are issued, the final regional conditions will be issued after they are approved by the Division Commander. After the final NWP are issued, States and Tribes will make their Clean Water Act Section 401 (401) water quality certification. The 401 decisions must be made within 90 days of the Federal Register notice announcing the issuance of the NWPs. The final NWPs will go into effect on March 19, 2017. Regional Issues Concerning the Proposed NWPs, Including Regional Conditioning: Division engineers are authorized to add regional conditions specific to the needs and/or requirements of a particular region or state. Regional conditions are important mechanisms to ensure that the adverse environmental effects of activities authorized by the NWPs are no more than minimal, both individually and cumulatively. Division engineers may also suspend or revoke specific NWPs in certain geographic areas (e.g., states or watersheds) or high-value aquatic systems where the adverse environmental effects caused by activities authorized by those NWPs may be more than minimal. The current Kansas regional conditions are listed below with notes concerning anticipated revisions or changes to those conditions. The Kansas City District is seeking comments on the adoption of the proposed regional conditions, and seeking comments on the need for additional regional conditions to help ensure that the adverse environmental effects of activities authorized by the proposed NWPs are no more than minimal, individually and cumulatively. Unless otherwise noted, all proposed regional conditions listed below are applicable for activities in Kansas. Comments on regional issues relating to the proposed NWPs and proposed regional conditions should be sent to Ms. Sarah Reznicek at the U.S. Army Corps of Engineers, Kansas State Regulatory Office, 2710 NE Shady Creek Access Road, El Dorado, Kansas, 67042, by telephone at (816) 389-3741 or by email at sarah.m.reznicek@usace.army.mil. Comments relating to regional conditions are due by July 22, 2016. Similar public notices proposing regional conditions in other regions or States are being published concurrently by other division or district offices. KANSAS NWP REGIONAL CONDITIONS For All Nationwide Permits: 1. Stream Crossings. In addition to requirements of General Condition (2) and General Condition (9) of the Nationwide Permits, the following guidelines for stream crossings apply for regulated activities in waters of the United States. The guidelines are available at: http://www.nwk.usace.army.mil/Portals/29/docs/regulatory/nationwidepermits/2012/KSRC1Streams.pdf **We anticipate making changes to this regional condition that clarify the guidelines for stream crossings. 2. Invasive and Exotic Species. Plant species listed at: http://www.nwk.usace.army.mil/Portals/29/docs/regulatory/nationwidepermits/2012/KSInvasivePlants.pdf shall not be used for revegetation unless this requirement is waived by the District Engineer based on a case specific analysis of the revegetation plan. Best management practices should be used to reduce the risk of transferring invasive plant and animal species to or from the project site. Best management practices can be found at: http://www.invasivespeciesinfo.gov/toolkit/preventionbmp.shtml. Known zebra mussel waters within Kansas can be found at http://nas.er.usgs.gov/queries/zmbyst.asp. **We anticipate minor changes to this regional condition to provide a more refined plant list.

3. Suitable Material. In addition to the specific examples in General Condition (6) of the Nationwide Permits, the following materials are not suitable for fill activities in waters of the United States: vehicle bodies, construction or demolition debris, garbage, tires, treated lumber (chromated copper arsenate (CCA), creosote, and pentachlorophenol), liquid concrete not poured into forms, grouted riprap, bagged cement, and sewage or organic waste. Broken concrete used as bank stabilization must be reasonably well graded, consisting of pieces varying in size from 20 pounds up to and including at least 150 pound pieces to withstand expected high flows. Applicants must break all large slabs to conform to the well graded requirement. Generally, the maximum weight of any piece should not be more than 500 pounds. Gravel and dirt should not exceed 15% of the total fill volume when using broken concrete as fill. All protruding reinforcement rods, trash, asphalt, and other extraneous materials must be removed from the broken concrete prior to placement in waters of the United States. **We do not anticipate any significant changes to this condition. 4. Indian Country. All Nationwide Permits requested by applicants other than the Tribal Authority for use within the reservation boundaries of Indian Country in Kansas require preconstruction notification to the District Engineer and coordination with the Tribal Authority. All other terms and conditions of the NWPs and regional conditions apply in Indian Country regardless of the applicant. **We do not anticipate any significant changes to this condition. 5. Threatened & Endangered Species Waters. The applicant must provide preconstruction notification to the District Engineer for any regulated activity in waters listed at: http://www.nwk.usace.army.mil/Portals/29/docs/regulatory/nationwidepermits/2012/T&EList.pdf **We anticipate adding language to clarify critical habitat, suitable habitat and/or excluded areas for certain species. 6. Designated State Waters. The applicant must provide preconstruction notification to the District Engineer for any regulated activity in Exceptional State Waters (ESW) or Special Aquatic Life Use Waters (SALUW) as listed in the Kansas Surface Water Register. The list of special status waters requiring notification is available on request from the Corps and a map is located at: http://www.nwk.usace.army.mil/Portals/29/docs/regulatory/nationwidepermits/2012/DesignatedWaters_14Oct2011.pdf

**We anticipate minor changes to this condition by adding language to address Outstanding National Resource Waters (ONRW) as stated in General Condition 22. Kansas ONRWs can also be found at the above link. For Specific Nationwide Permits: **We do not anticipate any significant changes to the following conditions. 7. NWP 12 ­ Utility Line Activities. The applicant must provide preconstruction notification to the District Engineer prior to commencing the activity if the discharge is in a special aquatic site or when new utility line construction activities have multiple crossings of the same stream and/or parallel a stream. The preconstruction notification must include a revegetation plan for impacted wetlands and riparian areas in accordance with Regional Condition 2. Where preconstruction notification is required for utility line activities within streams, the submittal must include site-specific plans for the stabilization of disturbed channel bed and bank areas.

8. NWP 23 - Approved Categorical Exclusions. The applicant must provide preconstruction notification to the District Engineer for all regulated Nationwide Permit 23 activities in waters of the United States. In addition to information required by General Condition 31, the applicant must identify the approved categorical exclusion that applies and provide documentation that the project fits the categorical exclusion. **NOTE: General Condition 31 in the 2012 NWPs is now listed as No. 32 in the proposed 2017 NWPs. 9. NWP 27 ­ Stream and Wetland Restoration Activities. The applicant must provide preconstruction notification to the District Engineer prior to commencing the activity if the discharge is associated with impacts to forested wetlands. 10. Requirements for Waiver of 300 Linear Foot Limit Associated with NWPs 21, 29, 39, 40, 42, 43, 44, 50, 51, 52. The applicant must request the waiver in writing and provide documentation and environmentally based reasons to support the waiver request in accordance with the requirements of General Condition (31) for making waiver determinations. Note: Preconstruction Notification to the District Engineer must be in accordance with General Condition (31) of the Nationwide Permits. **NOTE: General Condition 31 in the 2012 NWPs is now listed as No. 32 in the proposed 2017 NWPs.

PROPOSED NEW REGIONAL CONDITIONS: Soil Erosion and Sediment Controls. In addition to the requirements of General Condition (12) of the Nationwide Permits, all temporary erosion control materials, including but not limited to silt fencing, turbidity screens, etc., must be removed once all exposed soil and other fills have been stabilized. General Guidelines for Soil Savers. For all Nationwide Permits that involve the construction/installation of culverts within ephemeral/upper intermittent tributaries, soil savers may be authorized as part of Nationwide Permit 14 (Linear Transportation Projects). The following General Guidelines are required to supplement General Condition (2) Aquatic Life Movements and General Condition (9) Management of Water Flows. A Pre-Construction Notification will be required. As defined in the Kansas Department of Transportation Design Manual (3.12.9.9 Soil Saver), "a soil saver is a wall constructed across the stream bed at the end of the wings of the upstream entrance to the culvert. It provides a vertical drop in the stream bed. The soil saver functions as a grade control structure to aid in controlling erosion in the upstream drainage basin. In addition, the soil saver acts as a "Drop Inlet". It allows a culvert that would otherwise be constructed on a steep slope, operating under inlet control with high exit velocities (> 15 ft./sec.); to be constructed on a flatter slope, operating under outlet control with reduced velocities". Where aquatic life is present within a tributary, the use of soil savers can be considered impediments to upstream migration. It has however been determined that in certain situations, the use of soil savers can provide a benefit to downstream water quality by eliminating upstream stream channel incision and reduced downstream velocities when incorporated as part of a roadway culvert replacement. This is especially true within ephemeral/upper intermittent tributaries that although meet the definition of "Waters of the U.S.", have been and continue to be manipulated (ex. farmed channels, road ditches, grassed waterways etc.) either upstream, downstream, or both. Although these ephemeral/upper intermittent tributaries do contribute to downstream water quality, they no longer support aquatic habitat due to their position in the landscape or degree of manipulation. The preconstruction notification must include documentation (ex. photos, design plans, survey data etc.) to support the conclusion that the addition of a soil saver in the design of the crossing will provide a greater overall environmental benefit. Index of Proposed Nationwide Permits, Conditions, and Definitions Nationwide Permits 1. Aids to Navigation 2. Structures in Artificial Canals 3. Maintenance 4. Fish and Wildlife Harvesting, Enhancement, and Attraction Devices and Activities 5. Scientific Measurement Devices 6. Survey Activities 7. Outfall Structures and Associated Intake Structures 8. Oil and Gas Structures on the Outer Continental Shelf 9. Structures in Fleeting and Anchorage Areas 10. Mooring Buoys

11. Temporary Recreational Structures 12. Utility Line Activities 13. Bank Stabilization 14. Linear Transportation Projects 15. U.S. Coast Guard Approved Bridges 16. Return Water From Upland Contained Disposal Areas 17. Hydropower Projects 18. Minor Discharges 19. Minor Dredging 20. Response Operations for Oil or Hazardous Substances 21. Surface Coal Mining Activities 22. Removal of Vessels 23. Approved Categorical Exclusions 24. Indian Tribe or State Administered Section 404 Programs 25. Structural Discharges 26. [Reserved] 27. Aquatic Habitat Restoration, Establishment, and Enhancement Activities 28. Modifications of Existing Marinas 29. Residential Developments 30. Moist Soil Management for Wildlife 31. Maintenance of Existing Flood Control Facilities 32. Completed Enforcement Actions 33. Temporary Construction, Access, and Dewatering 34. Cranberry Production Activities 35. Maintenance Dredging of Existing Basins 36. Boat Ramps 37. Emergency Watershed Protection and Rehabilitation 38. Cleanup of Hazardous and Toxic Waste 39. Commercial and Institutional Developments 40. Agricultural Activities 41. Reshaping Existing Drainage Ditches 42. Recreational Facilities 43. Stormwater Management Facilities 44. Mining Activities 45. Repair of Uplands Damaged by Discrete Events 46. Discharges in Ditches 47. [Reserved] 48. Commercial Shellfish Aquaculture Activities 49. Coal Remining Activities 50. Underground Coal Mining Activities 51. Land-Based Renewable Energy Generation Facilities 52. Water-Based Renewable Energy Generation Pilot Projects A. Removal of Low-Head Dams B. Living Shorelines Nationwide Permit General Conditions 1. Navigation 2. Aquatic Life Movements 3. Spawning Areas 4. Migratory Bird Breeding Areas 5. Shellfish Beds 6. Suitable Material

7. Water Supply Intakes 8. Adverse Effects from Impoundments 9. Management of Water Flows 10. Fills Within 100-Year Floodplains 11. Equipment 12. Soil Erosion and Sediment Controls 13. Removal of Temporary Fills 14. Proper Maintenance 15. Single and Complete Project 16. Wild and Scenic Rivers 17. Tribal Rights 18. Endangered Species 19. Migratory Bird and Bald and Golden Eagle Permits 20. Historic Properties 21. Discovery of Previously Unknown Remains and Artifacts 22. Designated Critical Resource Waters 23. Mitigation 24. Safety of Impoundment Structures 25. Water Quality 26. Coastal Zone Management 27. Regional and Case-by-Case Conditions 28. Use of Multiple Nationwide Permits 29. Transfer of Nationwide Permit Verifications 30. Compliance Certification 31. Activities Affecting Structures or Works Built by the United States 32. Pre-Construction Notification District Engineer's Decision Further Information Definitions Best management practices (BMPs) Compensatory mitigation Currently serviceable Direct effects Discharge Enhancement Ephemeral stream Establishment (creation) High Tide Line Historic property Independent utility Indirect effects Intermittent stream Loss of waters of the United States Non-tidal wetland Open water Ordinary high water mark Perennial stream Practicable Pre-construction notification

Preservation Re-establishment Rehabilitation Restoration Riffle and pool complex Riparian areas Shellfish seeding Single and complete linear project Single and complete non-linear project Stormwater management Stormwater management facilities Stream bed Stream channelization Structure Tidal wetland Vegetated shallows Waterbody

PUBLIC NOTICE Nationwide Permit Reauthorization Issue Date: June 7, 2016 Expiration Date: August 1, 2016

US Army Corps of Engineers Kansas City District ______________________________________________________________________________ INITIAL PUBLIC NOTICE NATIONWIDE PERMIT REISSUANCE REQUEST FOR COMMENTS On June 1, 2016, the U.S. Army Corps of Engineers published in the Federal Register its proposal to reissue the 50 existing nationwide permits (NWPs) and issue two new NWPs. NWPs are general permits issued on a nationwide basis to streamline the authorization of activities that result in no more than minimal individual and cumulative adverse environmental effects. Many of the proposed NWPs require notification to the district engineer before commencing those activities, to ensure that the activities authorized by those NWPs cause no more than minimal individual and cumulative adverse environmental effects. National Issues Concerning the Proposed NWPs: The Federal Register notice is the public's opportunity to comment on the proposed NWPs, general conditions, and definitions. Comments on national issues relating to these NWPs should be submitted to docket number COE-20150017 at www.regulations.gov, or by email to NWP2017@usace.army.mil or by mail to Headquarters, U.S. Army Corps of Engineers, Directorate of Civil Works, ATTN: CECW-CO-R, 441 G Street, N.W., Washington, D.C. 20314-1000. Instructions for submitting comments are provided in the June 1, 2016 Federal Register notice. Comments on the proposed NWPs are due by August 1, 2016. Draft decision documents for each of the proposed NWPs, which include environmental documentation prepared for the purposes of the National Environmental Policy Act, have been written by Corps Headquarters. The decision documents will address compliance of the NWPs with the requirements for issuance under the Corps general permit authority. These documents, as well as the proposed NWPs, are available for viewing at www.regulations.gov, docket number COE-2015-0017. Final decision documents will be prepared for the NWPs that are issued. In addition, the final national NWP decision documents will be supplemented by division engineers to address their decisions concerning regional conditions for the NWPs. An index of the proposed NWPs and conditions is appended at the end of this notice. Anyone wishing to provide comments may obtain a full text copy of the NWPs through the Corps Home Page at: http://www.usace.army.mil/Missions/CivilWorks/RegulatoryProgramandPermits/NationwidePermits.aspx at www.regulations.gov in docket number COE-2015-0017, or at the Federal Register at https://www.gpo.gov/fdsys/pkg/FR-2016-06-01/pdf/2016-12083.pdf.

After the final NWPs are issued, the final regional conditions will be issued after they are approved by the Division Commander. After the final NWP are issued, States and Tribes will make their Clean Water Act Section 401 (401) water quality certification. The 401 decisions must be made within 90 days of the Federal Register notice announcing the issuance of the NWPs. The final NWPs will go into effect on March 19, 2017. Regional Issues Concerning the Proposed NWPs, Including Regional Conditioning: Division engineers are authorized to add regional conditions specific to the needs and/or requirements of a particular region or state. Regional conditions are important mechanisms to ensure that the adverse environmental effects of activities authorized by the NWPs are no more than minimal, both individually and cumulatively. Division engineers may also suspend or revoke specific NWPs in certain geographic areas (e.g., states or watersheds) or high-value aquatic systems where the adverse environmental effects caused by activities authorized by those NWPs may be more than minimal. The current Missouri regional conditions are listed below with notes concerning anticipated revisions or changes to those conditions. The Kansas City District, as the lead district for Missouri, is seeking comments on the adoption of the proposed regional conditions, and seeking comments on the need for additional regional conditions to help ensure that the adverse environmental effects of activities authorized by the proposed NWPs are no more than minimal, individually and cumulatively. Unless otherwise noted, all proposed regional conditions listed below are applicable for activities in Missouri. Comments on regional issues relating to the proposed NWPs and proposed regional conditions should be sent to Mr. James Reenan at the U.S. Army Corps of Engineers, Missouri State Regulatory Office, 515 East High Street, Suite 202, Jefferson City, Missouri, 65101, by telephone at (816) 389-3832 or by email at jame.s.reenan@usace.army.mil. Comments relating to regional conditions are due by July 22, 2016. Similar public notices proposing regional conditions in other regions or States are being published concurrently by other division or district offices. MISSOURI NWP REGIONAL CONDITIONS For All Nationwide Permits: 1. Stream Crossings. In addition to requirements of General Condition (2) and General Condition (9) of the Nationwide Permits, the following guidelines for stream crossings apply for regulated activities in waters of the United States. The guidelines are available at: http://www.nwk.usace.army.mil/Portals/29/docs/regulatory/nationwidepermits/2012/MORC1Streams.pdf. **We anticipate making changes to this regional condition that clarify the guidelines for stream crossings. 2. Seasonal Restrictions for Activities Proposed in Spawning Areas. In addition to the requirements of General Condition (3) of the Nationwide Permits, the following specific seasonal restrictions apply for regulated activities in waters of the United States. Between the closed dates listed in the Missouri Combined Stream Spawning List, the permittee must not excavate from or discharge into the listed waters. The list of waters with seasonal restrictions is available on request from the Corps or at: http://www.nwk.usace.army.mil/Portals/29/docs/regulatory/nationwidepermits/2012/SpawningList.pdf **We anticipate minor changes to the linked list that pertain to start/end points that define the extent of the reach.

3. Invasive and Exotic Species. Plant species listed at: http://www.nwk.usace.army.mil/Portals/29/docs/regulatory/nationwidepermits/2012/MOInvasivePlants.pdf shall not be used for revegetation unless this requirement is waived by the district engineer based on a case specific analysis of the revegetation plan. Best management practices should be used to reduce the risk of transferring invasive plant and animal species to or from the project site. Best management practices can be found at: http://www.invasivespeciesinfo.gov/toolkit/preventionbmp.shtml. Known zebra mussel waters within Missouri can be found at: http://nas.er.usgs.gov/queries/zmbyst.asp. **We do not anticipate any significant changes to this condition. 4. Suitable Material. In addition to the specific examples in General Condition (6) of the Nationwide Permits, the following materials are not suitable for fill activities in waters of the United States: vehicle bodies, construction or demolition debris, garbage, tires, treated lumber (chromated copper arsenate (CCA), creosote, and pentachlorophenol), liquid concrete not poured into forms, grouted riprap, bagged cement, and sewage or organic waste. Broken concrete used as bank stabilization must be reasonably well graded, consisting of pieces varying in size from 20 pounds up to and including at least 150 pound pieces to withstand expected high flows. Applicants must break all large slabs to conform to the well graded requirement. Generally, the maximum weight of any piece should not be more than 500 pounds. Gravel and dirt should not exceed 15% of the total fill volume when using broken concrete as fill. All protruding reinforcement rods, trash, asphalt, and other extraneous materials must be removed from the broken concrete prior to placement in waters of the United States. **We do not anticipate any significant changes to this condition. 5. Priority Watersheds. The applicant must provide preconstruction notification to the District Engineer for any regulated activity in a priority watershed. The list of priority watersheds requiring notification is available on request from the Corps or at: http://www.nwk.usace.army.mil/Portals/29/docs/regulatory/nationwidepermits/2012/PriorityWatersheds.pdf **We are considering elimination of this condition based on experience with the condition over the last 5 years. 6. Special Aquatic Resources. The applicant must provide preconstruction notification to the District Engineer for any regulated activity which may impact a jurisdictional fen, seep or bog of any size. **We do not anticipate any significant changes to this condition. 7. Sensitive Aquatic Species. The applicant must provide preconstruction notification to the District Engineer for any regulated activity in waters listed at: http://www.nwk.usace.army.mil/Portals/29/docs/regulatory/nationwidepermits/2012/MORC7AquaticSpecies.pdf. The submitted preconstruction notification will be coordinated in accordance with General Condition 31(d) with the U.S. Fish and Wildlife Service as determined appropriate by the Corps. **We do not anticipate any significant changes to this condition. NOTE: General Condition 31 in the 2012 NWPs is now listed as No. 32 in the proposed 2017 NWPs. For Specific Nationwide Permits: **We do not anticipate any significant changes to the following conditions.

8. NWP 12 ­ Utility Line Activities. The applicant must provide preconstruction notification to the District Engineer prior to commencing the activity if the discharge is in a special aquatic site or when new utility line construction activities have multiple crossings of the same stream and/or parallel a stream. The preconstruction notification must include a revegetation plan for impacted wetlands and riparian areas in accordance with Regional Condition 3. Where preconstruction notification is required for utility line activities within streams, the submittal must include site-specific plans for the stabilization of disturbed channel bed and bank areas. 9. NWP 23 - Approved Categorical Exclusions. The applicant must provide preconstruction notification to the District Engineer for all regulated Nationwide Permit 23 activities in waters of the United States. In addition to information required by General Condition 31, the applicant must identify the approved categorical exclusion that applies and provide documentation that the project fits the categorical exclusion. **NOTE: General Condition 31 in the 2012 NWPs is now listed as No. 32 in the proposed 2017 NWPs. 10. NWP 27 ­ Stream and Wetland Restoration Activities. The applicant must provide preconstruction notification to the District Engineer prior to commencing the activity if the discharge is associated with impacts to forested wetlands. 11. NWP 44 ­ Mining Activities. Nationwide Permit 44 cannot be used to authorize in-stream mining projects, including in-stream sand and gravel mining operations. Requirements for Waiver of 300 Linear Foot Limit Associated with NWPs 21, 29, 39, 40, 42, 43, 44, 50, 51, 52. The applicant must request the waiver in writing and provide documentation and environmentally based reasons to support the waiver request in accordance with the requirements of General Condition (31)(e) for making waiver determinations. **NOTE: General Condition 31 in the 2012 NWPs is now listed as No. 32 in the proposed 2017 NWPs. 12. Lake of the Ozarks. The applicant must provide a preconstruction notification to the District Engineer for any regulated activity associated with Nationwide Permits 3, 7, 12, 14, 15, 18, 22, 27, 33, and 45 within Lake of the Ozarks. A copy of this notification must also concurrently be sent to Ameren Missouri. Nationwide Permits 2, 13, 16, 19, 25, 29, 31, 35, 36, 39, 41, and 44 are revoked in the Lake of the Ozarks. NWPs 1, 9, 10, 11 and 28 are only valid when both Ameren Missouri and the Missouri State Water Patrol have approved the activity. The Corps and Ameren Missouri, regardless of the request to use any Nationwide Permit, may verify the activity under the provisions of Regional General Permit 38M http://www.nwk.usace.army.mil/Portals/29/docs/regulatory/permits/GP-38M.pdf. Additional information on Ameren Missouri and Lake of the Ozarks permit requirements can be found at the following webpage: http://www.ameren.com/missouri/lake-of-the-ozarks Index of Proposed Nationwide Permits, Conditions, and Definitions Nationwide Permits 1. Aids to Navigation 2. Structures in Artificial Canals 3. Maintenance 4. Fish and Wildlife Harvesting, Enhancement, and Attraction Devices and Activities 5. Scientific Measurement Devices

6. Survey Activities 7. Outfall Structures and Associated Intake Structures 8. Oil and Gas Structures on the Outer Continental Shelf 9. Structures in Fleeting and Anchorage Areas 10. Mooring Buoys 11. Temporary Recreational Structures 12. Utility Line Activities 13. Bank Stabilization 14. Linear Transportation Projects 15. U.S. Coast Guard Approved Bridges 16. Return Water From Upland Contained Disposal Areas 17. Hydropower Projects 18. Minor Discharges 19. Minor Dredging 20. Response Operations for Oil or Hazardous Substances 21. Surface Coal Mining Activities 22. Removal of Vessels 23. Approved Categorical Exclusions 24. Indian Tribe or State Administered Section 404 Programs 25. Structural Discharges 26. [Reserved] 27. Aquatic Habitat Restoration, Establishment, and Enhancement Activities 28. Modifications of Existing Marinas 29. Residential Developments 30. Moist Soil Management for Wildlife 31. Maintenance of Existing Flood Control Facilities 32. Completed Enforcement Actions 33. Temporary Construction, Access, and Dewatering 34. Cranberry Production Activities 35. Maintenance Dredging of Existing Basins 36. Boat Ramps 37. Emergency Watershed Protection and Rehabilitation 38. Cleanup of Hazardous and Toxic Waste 39. Commercial and Institutional Developments 40. Agricultural Activities 41. Reshaping Existing Drainage Ditches 42. Recreational Facilities 43. Stormwater Management Facilities 44. Mining Activities 45. Repair of Uplands Damaged by Discrete Events 46. Discharges in Ditches 47. [Reserved] 48. Commercial Shellfish Aquaculture Activities 49. Coal Remining Activities 50. Underground Coal Mining Activities 51. Land-Based Renewable Energy Generation Facilities 52. Water-Based Renewable Energy Generation Pilot Projects A. Removal of Low-Head Dams B. Living Shorelines Nationwide Permit General Conditions 1. Navigation

2. Aquatic Life Movements 3. Spawning Areas 4. Migratory Bird Breeding Areas 5. Shellfish Beds 6. Suitable Material 7. Water Supply Intakes 8. Adverse Effects from Impoundments 9. Management of Water Flows 10. Fills Within 100-Year Floodplains 11. Equipment 12. Soil Erosion and Sediment Controls 13. Removal of Temporary Fills 14. Proper Maintenance 15. Single and Complete Project 16. Wild and Scenic Rivers 17. Tribal Rights 18. Endangered Species 19. Migratory Bird and Bald and Golden Eagle Permits 20. Historic Properties 21. Discovery of Previously Unknown Remains and Artifacts 22. Designated Critical Resource Waters 23. Mitigation 24. Safety of Impoundment Structures 25. Water Quality 26. Coastal Zone Management 27. Regional and Case-by-Case Conditions 28. Use of Multiple Nationwide Permits 29. Transfer of Nationwide Permit Verifications 30. Compliance Certification 31. Activities Affecting Structures or Works Built by the United States 32. Pre-Construction Notification District Engineer's Decision Further Information Definitions Best management practices (BMPs) Compensatory mitigation Currently serviceable Direct effects Discharge Enhancement Ephemeral stream Establishment (creation) High Tide Line Historic property Independent utility Indirect effects Intermittent stream Loss of waters of the United States Non-tidal wetland

Open water Ordinary high water mark Perennial stream Practicable Pre-construction notification Preservation Re-establishment Rehabilitation Restoration Riffle and pool complex Riparian areas Shellfish seeding Single and complete linear project Single and complete non-linear project Stormwater management Stormwater management facilities Stream bed Stream channelization Structure Tidal wetland Vegetated shallows Waterbody

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas