On June 1, 2016, the U.S. Army Corps of Engineers published in the Federal Register its proposal to reissue the 50 existing nationwide permits (NWPs) and issue two new NWPs.
Comments on the proposed NWPs are due by August 1, 2016.
Separate public notices for the State of Missouri and the State of Kansas announcing the proposed reissuance and request for comments are posted below. Comments relating to the Missouri and Kansas regional conditions are due by July 22, 2016.
On June 1, 2016, the U.S. Army Corps of Engineers published in the Federal Register its proposal to reissue the 50 existing nationwide permits (NWPs) and issue two new NWPs.
Comments on the proposed NWPs are due by August 1, 2016.
Separate public notices for the State of Missouri and the State of Kansas announcing the proposed reissuance and request for comments are posted below. Comments relating to the Missouri and Kansas regional conditions are due by July 22, 2016.
PUBLIC NOTICE
Nationwide Permit Reauthorization
Issue Date: June 7, 2016
Expiration Date: August 1, 2016
US Army Corps
of Engineers
Kansas City District
______________________________________________________________________________
INITIAL PUBLIC NOTICE
NATIONWIDE PERMIT REISSUANCE REQUEST FOR COMMENTS
On June 1, 2016, the U.S. Army Corps of Engineers published in the Federal Register its
proposal to reissue the 50 existing nationwide permits (NWPs) and issue two new NWPs.
NWPs are general permits issued on a nationwide basis to streamline the authorization of
activities that result in no more than minimal individual and cumulative adverse environmental
effects. Many of the proposed NWPs require notification to the district engineer before
commencing those activities, to ensure that the activities authorized by those NWPs cause no
more than minimal individual and cumulative adverse environmental effects.
National Issues Concerning the Proposed NWPs: The Federal Register notice is the public's
opportunity to comment on the proposed NWPs, general conditions, and definitions. Comments
on national issues relating to these NWPs should be submitted to docket number COE-20150017 at www.regulations.gov, or by email to NWP2017@usace.army.mil or by mail to Headquarters,
U.S. Army Corps of Engineers, Directorate of Civil Works, ATTN: CECW-CO-R, 441 G Street,
N.W., Washington, D.C. 20314-1000. Instructions for submitting comments are provided in the
June 1, 2016 Federal Register notice. Comments on the proposed NWPs are due by August 1,
2016.
Draft decision documents for each of the proposed NWPs, which include environmental
documentation prepared for the purposes of the National Environmental Policy Act, have been
written by Corps Headquarters. The decision documents will address compliance of the NWPs
with the requirements for issuance under the Corps general permit authority. These documents,
as well as the proposed NWPs, are available for viewing at www.regulations.gov, docket number
COE-2015-0017. Final decision documents will be prepared for the NWPs that are issued. In
addition, the final national NWP decision documents will be supplemented by division engineers
to address their decisions concerning regional conditions for the NWPs.
An index of the proposed NWPs and conditions is appended at the end of this notice. Anyone
wishing to provide comments may obtain a full text copy of the NWPs through the Corps Home
Page at:
http://www.usace.army.mil/Missions/CivilWorks/RegulatoryProgramandPermits/NationwidePermits.aspx at
www.regulations.gov in docket number COE-2015-0017, or at the Federal Register at
https://www.gpo.gov/fdsys/pkg/FR-2016-06-01/pdf/2016-12083.pdf.
After the final NWPs are issued, the final regional conditions will be issued after they are
approved by the Division Commander. After the final NWP are issued, States and Tribes will
make their Clean Water Act Section 401 (401) water quality certification. The 401 decisions
must be made within 90 days of the Federal Register notice announcing the issuance of the
NWPs. The final NWPs will go into effect on March 19, 2017.
Regional Issues Concerning the Proposed NWPs, Including Regional Conditioning: Division
engineers are authorized to add regional conditions specific to the needs and/or requirements of
a particular region or state. Regional conditions are important mechanisms to ensure that the
adverse environmental effects of activities authorized by the NWPs are no more than minimal,
both individually and cumulatively. Division engineers may also suspend or revoke specific
NWPs in certain geographic areas (e.g., states or watersheds) or high-value aquatic systems
where the adverse environmental effects caused by activities authorized by those NWPs may
be more than minimal.
The current Kansas regional conditions are listed below with notes concerning anticipated
revisions or changes to those conditions. The Kansas City District is seeking comments on
the adoption of the proposed regional conditions, and seeking comments on the need for
additional regional conditions to help ensure that the adverse environmental effects of
activities authorized by the proposed NWPs are no more than minimal, individually and
cumulatively. Unless otherwise noted, all proposed regional conditions listed below are
applicable for activities in Kansas. Comments on regional issues relating to the proposed
NWPs and proposed regional conditions should be sent to Ms. Sarah Reznicek
at the U.S. Army Corps of Engineers, Kansas State Regulatory Office, 2710 NE Shady
Creek Access Road, El Dorado, Kansas, 67042, by telephone at (816) 389-3741 or by email
at sarah.m.reznicek@usace.army.mil. Comments relating to regional conditions are due by
July 22, 2016. Similar public notices proposing regional conditions in other regions or States
are being published concurrently by other division or district offices.
KANSAS NWP REGIONAL CONDITIONS
For All Nationwide Permits:
1. Stream Crossings. In addition to requirements of General Condition (2) and General
Condition (9) of the Nationwide Permits, the following guidelines for stream crossings apply
for regulated activities in waters of the United States. The guidelines are available at:
http://www.nwk.usace.army.mil/Portals/29/docs/regulatory/nationwidepermits/2012/KSRC1Streams.pdf
**We anticipate making changes to this regional condition that clarify the guidelines for
stream crossings.
2. Invasive and Exotic Species. Plant species listed at:
http://www.nwk.usace.army.mil/Portals/29/docs/regulatory/nationwidepermits/2012/KSInvasivePlants.pdf
shall not be used for revegetation unless this requirement is waived by the District Engineer
based on a case specific analysis of the revegetation plan. Best management practices should be
used to reduce the risk of transferring invasive plant and animal species to or from the project
site. Best management practices can be found at:
http://www.invasivespeciesinfo.gov/toolkit/preventionbmp.shtml. Known zebra mussel waters within
Kansas can be found at http://nas.er.usgs.gov/queries/zmbyst.asp.
**We anticipate minor changes to this regional condition to provide a more refined plant list.
3. Suitable Material. In addition to the specific examples in General Condition (6) of the
Nationwide Permits, the following materials are not suitable for fill activities in waters of the
United States: vehicle bodies, construction or demolition debris, garbage, tires, treated lumber
(chromated copper arsenate (CCA), creosote, and pentachlorophenol), liquid concrete not poured
into forms, grouted riprap, bagged cement, and sewage or organic waste. Broken concrete used
as bank stabilization must be reasonably well graded, consisting of pieces varying in size from
20 pounds up to and including at least 150 pound pieces to withstand expected high flows.
Applicants must break all large slabs to conform to the well graded requirement. Generally, the
maximum weight of any piece should not be more than 500 pounds. Gravel and dirt should not
exceed 15% of the total fill volume when using broken concrete as fill. All protruding
reinforcement rods, trash, asphalt, and other extraneous materials must be removed from the
broken concrete prior to placement in waters of the United States.
**We do not anticipate any significant changes to this condition.
4. Indian Country. All Nationwide Permits requested by applicants other than the Tribal
Authority for use within the reservation boundaries of Indian Country in Kansas require
preconstruction notification to the District Engineer and coordination with the Tribal Authority.
All other terms and conditions of the NWPs and regional conditions apply in Indian Country
regardless of the applicant.
**We do not anticipate any significant changes to this condition.
5. Threatened & Endangered Species Waters. The applicant must provide preconstruction
notification to the District Engineer for any regulated activity in waters listed at:
http://www.nwk.usace.army.mil/Portals/29/docs/regulatory/nationwidepermits/2012/T&EList.pdf
**We anticipate adding language to clarify critical habitat, suitable habitat and/or excluded
areas for certain species.
6. Designated State Waters. The applicant must provide preconstruction notification to the
District Engineer for any regulated activity in Exceptional State Waters (ESW) or Special
Aquatic Life Use Waters (SALUW) as listed in the Kansas Surface Water Register. The list of
special status waters requiring notification is available on request from the Corps and a map is
located at:
http://www.nwk.usace.army.mil/Portals/29/docs/regulatory/nationwidepermits/2012/DesignatedWaters_14Oct2011.pdf
**We anticipate minor changes to this condition by adding language to address Outstanding
National Resource Waters (ONRW) as stated in General Condition 22. Kansas ONRWs can
also be found at the above link.
For Specific Nationwide Permits:
**We do not anticipate any significant changes to the following conditions.
7. NWP 12 Utility Line Activities. The applicant must provide preconstruction notification
to the District Engineer prior to commencing the activity if the discharge is in a special aquatic
site or when new utility line construction activities have multiple crossings of the same stream
and/or parallel a stream. The preconstruction notification must include a revegetation plan for
impacted wetlands and riparian areas in accordance with Regional Condition 2. Where
preconstruction notification is required for utility line activities within streams, the submittal
must include site-specific plans for the stabilization of disturbed channel bed and bank areas.
8. NWP 23 - Approved Categorical Exclusions. The applicant must provide preconstruction
notification to the District Engineer for all regulated Nationwide Permit 23 activities in waters of
the United States. In addition to information required by General Condition 31, the applicant
must identify the approved categorical exclusion that applies and provide documentation that the
project fits the categorical exclusion.
**NOTE: General Condition 31 in the 2012 NWPs is now listed as No. 32 in the proposed
2017 NWPs.
9. NWP 27 Stream and Wetland Restoration Activities. The applicant must provide
preconstruction notification to the District Engineer prior to commencing the activity if the
discharge is associated with impacts to forested wetlands.
10. Requirements for Waiver of 300 Linear Foot Limit Associated with NWPs 21, 29, 39,
40, 42, 43, 44, 50, 51, 52. The applicant must request the waiver in writing and provide
documentation and environmentally based reasons to support the waiver request in accordance
with the requirements of General Condition (31) for making waiver determinations.
Note: Preconstruction Notification to the District Engineer must be in accordance with
General Condition (31) of the Nationwide Permits.
**NOTE: General Condition 31 in the 2012 NWPs is now listed as No. 32 in the proposed
2017 NWPs.
PROPOSED NEW REGIONAL CONDITIONS:
Soil Erosion and Sediment Controls. In addition to the requirements of General Condition
(12) of the Nationwide Permits, all temporary erosion control materials, including but not limited
to silt fencing, turbidity screens, etc., must be removed once all exposed soil and other fills have
been stabilized.
General Guidelines for Soil Savers. For all Nationwide Permits that involve the
construction/installation of culverts within ephemeral/upper intermittent tributaries, soil savers
may be authorized as part of Nationwide Permit 14 (Linear Transportation Projects). The
following General Guidelines are required to supplement General Condition (2) Aquatic Life
Movements and General Condition (9) Management of Water Flows. A Pre-Construction
Notification will be required.
As defined in the Kansas Department of Transportation Design Manual (3.12.9.9 Soil Saver), "a
soil saver is a wall constructed across the stream bed at the end of the wings of the upstream
entrance to the culvert. It provides a vertical drop in the stream bed. The soil saver functions as a
grade control structure to aid in controlling erosion in the upstream drainage basin. In addition,
the soil saver acts as a "Drop Inlet". It allows a culvert that would otherwise be constructed on a
steep slope, operating under inlet control with high exit velocities (> 15 ft./sec.); to be
constructed on a flatter slope, operating under outlet control with reduced velocities".
Where aquatic life is present within a tributary, the use of soil savers can be considered
impediments to upstream migration. It has however been determined that in certain situations,
the use of soil savers can provide a benefit to downstream water quality by eliminating upstream
stream channel incision and reduced downstream velocities when incorporated as part of a
roadway culvert replacement. This is especially true within ephemeral/upper intermittent
tributaries that although meet the definition of "Waters of the U.S.", have been and continue to
be manipulated (ex. farmed channels, road ditches, grassed waterways etc.) either upstream,
downstream, or both. Although these ephemeral/upper intermittent tributaries do contribute to
downstream water quality, they no longer support aquatic habitat due to their position in the
landscape or degree of manipulation.
The preconstruction notification must include documentation (ex. photos, design plans, survey
data etc.) to support the conclusion that the addition of a soil saver in the design of the crossing
will provide a greater overall environmental benefit.
Index of Proposed Nationwide Permits, Conditions, and Definitions
Nationwide Permits
1. Aids to Navigation
2. Structures in Artificial Canals
3. Maintenance
4. Fish and Wildlife Harvesting, Enhancement, and Attraction Devices and Activities
5. Scientific Measurement Devices
6. Survey Activities
7. Outfall Structures and Associated Intake Structures
8. Oil and Gas Structures on the Outer Continental Shelf
9. Structures in Fleeting and Anchorage Areas
10. Mooring Buoys
11. Temporary Recreational Structures
12. Utility Line Activities
13. Bank Stabilization
14. Linear Transportation Projects
15. U.S. Coast Guard Approved Bridges
16. Return Water From Upland Contained Disposal Areas
17. Hydropower Projects
18. Minor Discharges
19. Minor Dredging
20. Response Operations for Oil or Hazardous Substances
21. Surface Coal Mining Activities
22. Removal of Vessels
23. Approved Categorical Exclusions
24. Indian Tribe or State Administered Section 404 Programs
25. Structural Discharges
26. [Reserved]
27. Aquatic Habitat Restoration, Establishment, and Enhancement Activities
28. Modifications of Existing Marinas
29. Residential Developments
30. Moist Soil Management for Wildlife
31. Maintenance of Existing Flood Control Facilities
32. Completed Enforcement Actions
33. Temporary Construction, Access, and Dewatering
34. Cranberry Production Activities
35. Maintenance Dredging of Existing Basins
36. Boat Ramps
37. Emergency Watershed Protection and Rehabilitation
38. Cleanup of Hazardous and Toxic Waste
39. Commercial and Institutional Developments
40. Agricultural Activities
41. Reshaping Existing Drainage Ditches
42. Recreational Facilities
43. Stormwater Management Facilities
44. Mining Activities
45. Repair of Uplands Damaged by Discrete Events
46. Discharges in Ditches
47. [Reserved]
48. Commercial Shellfish Aquaculture Activities
49. Coal Remining Activities
50. Underground Coal Mining Activities
51. Land-Based Renewable Energy Generation Facilities
52. Water-Based Renewable Energy Generation Pilot Projects
A. Removal of Low-Head Dams
B. Living Shorelines
Nationwide Permit General Conditions
1. Navigation
2. Aquatic Life Movements
3. Spawning Areas
4. Migratory Bird Breeding Areas
5. Shellfish Beds
6. Suitable Material
7. Water Supply Intakes
8. Adverse Effects from Impoundments
9. Management of Water Flows
10. Fills Within 100-Year Floodplains
11. Equipment
12. Soil Erosion and Sediment Controls
13. Removal of Temporary Fills
14. Proper Maintenance
15. Single and Complete Project
16. Wild and Scenic Rivers
17. Tribal Rights
18. Endangered Species
19. Migratory Bird and Bald and Golden Eagle Permits
20. Historic Properties
21. Discovery of Previously Unknown Remains and Artifacts
22. Designated Critical Resource Waters
23. Mitigation
24. Safety of Impoundment Structures
25. Water Quality
26. Coastal Zone Management
27. Regional and Case-by-Case Conditions
28. Use of Multiple Nationwide Permits
29. Transfer of Nationwide Permit Verifications
30. Compliance Certification
31. Activities Affecting Structures or Works Built by the United States
32. Pre-Construction Notification
District Engineer's Decision
Further Information
Definitions
Best management practices (BMPs)
Compensatory mitigation
Currently serviceable
Direct effects
Discharge
Enhancement
Ephemeral stream
Establishment (creation)
High Tide Line
Historic property
Independent utility
Indirect effects
Intermittent stream
Loss of waters of the United States
Non-tidal wetland
Open water
Ordinary high water mark
Perennial stream
Practicable
Pre-construction notification
Preservation
Re-establishment
Rehabilitation
Restoration
Riffle and pool complex
Riparian areas
Shellfish seeding
Single and complete linear project
Single and complete non-linear project
Stormwater management
Stormwater management facilities
Stream bed
Stream channelization
Structure
Tidal wetland
Vegetated shallows
Waterbody
PUBLIC NOTICE
Nationwide Permit Reauthorization
Issue Date: June 7, 2016
Expiration Date: August 1, 2016
US Army Corps
of Engineers
Kansas City District
______________________________________________________________________________
INITIAL PUBLIC NOTICE
NATIONWIDE PERMIT REISSUANCE REQUEST FOR COMMENTS
On June 1, 2016, the U.S. Army Corps of Engineers published in the Federal Register its
proposal to reissue the 50 existing nationwide permits (NWPs) and issue two new NWPs.
NWPs are general permits issued on a nationwide basis to streamline the authorization of
activities that result in no more than minimal individual and cumulative adverse environmental
effects. Many of the proposed NWPs require notification to the district engineer before
commencing those activities, to ensure that the activities authorized by those NWPs cause no
more than minimal individual and cumulative adverse environmental effects.
National Issues Concerning the Proposed NWPs: The Federal Register notice is the public's
opportunity to comment on the proposed NWPs, general conditions, and definitions. Comments
on national issues relating to these NWPs should be submitted to docket number COE-20150017 at www.regulations.gov, or by email to NWP2017@usace.army.mil or by mail to Headquarters,
U.S. Army Corps of Engineers, Directorate of Civil Works, ATTN: CECW-CO-R, 441 G Street,
N.W., Washington, D.C. 20314-1000. Instructions for submitting comments are provided in the
June 1, 2016 Federal Register notice. Comments on the proposed NWPs are due by August 1,
2016.
Draft decision documents for each of the proposed NWPs, which include environmental
documentation prepared for the purposes of the National Environmental Policy Act, have been
written by Corps Headquarters. The decision documents will address compliance of the NWPs
with the requirements for issuance under the Corps general permit authority. These documents,
as well as the proposed NWPs, are available for viewing at www.regulations.gov, docket number
COE-2015-0017. Final decision documents will be prepared for the NWPs that are issued. In
addition, the final national NWP decision documents will be supplemented by division engineers
to address their decisions concerning regional conditions for the NWPs.
An index of the proposed NWPs and conditions is appended at the end of this notice. Anyone
wishing to provide comments may obtain a full text copy of the NWPs through the Corps Home
Page at:
http://www.usace.army.mil/Missions/CivilWorks/RegulatoryProgramandPermits/NationwidePermits.aspx at
www.regulations.gov in docket number COE-2015-0017, or at the Federal Register at
https://www.gpo.gov/fdsys/pkg/FR-2016-06-01/pdf/2016-12083.pdf.
After the final NWPs are issued, the final regional conditions will be issued after they are
approved by the Division Commander. After the final NWP are issued, States and Tribes will
make their Clean Water Act Section 401 (401) water quality certification. The 401 decisions
must be made within 90 days of the Federal Register notice announcing the issuance of the
NWPs. The final NWPs will go into effect on March 19, 2017.
Regional Issues Concerning the Proposed NWPs, Including Regional Conditioning: Division
engineers are authorized to add regional conditions specific to the needs and/or requirements of a
particular region or state. Regional conditions are important mechanisms to ensure that the
adverse environmental effects of activities authorized by the NWPs are no more than minimal,
both individually and cumulatively. Division engineers may also suspend or revoke specific
NWPs in certain geographic areas (e.g., states or watersheds) or high-value aquatic systems
where the adverse environmental effects caused by activities authorized by those NWPs may be
more than minimal.
The current Missouri regional conditions are listed below with notes concerning anticipated
revisions or changes to those conditions. The Kansas City District, as the lead district for
Missouri, is seeking comments on the adoption of the proposed regional conditions, and
seeking comments on the need for additional regional conditions to help ensure that the
adverse environmental effects of activities authorized by the proposed NWPs are no more
than minimal, individually and cumulatively. Unless otherwise noted, all proposed regional
conditions listed below are applicable for activities in Missouri. Comments on regional issues
relating to the proposed NWPs and proposed regional conditions should be sent to Mr. James
Reenan at the U.S. Army Corps of Engineers, Missouri State Regulatory Office, 515 East High
Street, Suite 202, Jefferson City, Missouri, 65101, by telephone at (816) 389-3832 or by email
at jame.s.reenan@usace.army.mil. Comments relating to regional conditions are due by
July 22, 2016. Similar public notices proposing regional conditions in other regions or States
are being published concurrently by other division or district offices.
MISSOURI NWP REGIONAL CONDITIONS
For All Nationwide Permits:
1. Stream Crossings. In addition to requirements of General Condition (2) and General
Condition (9) of the Nationwide Permits, the following guidelines for stream crossings apply for
regulated activities in waters of the United States. The guidelines are available at:
http://www.nwk.usace.army.mil/Portals/29/docs/regulatory/nationwidepermits/2012/MORC1Streams.pdf.
**We anticipate making changes to this regional condition that clarify the guidelines for
stream crossings.
2. Seasonal Restrictions for Activities Proposed in Spawning Areas. In addition to the
requirements of General Condition (3) of the Nationwide Permits, the following specific seasonal
restrictions apply for regulated activities in waters of the United States. Between the closed dates
listed in the Missouri Combined Stream Spawning List, the permittee must not excavate from or
discharge into the listed waters. The list of waters with seasonal restrictions is available on
request from the Corps or at:
http://www.nwk.usace.army.mil/Portals/29/docs/regulatory/nationwidepermits/2012/SpawningList.pdf
**We anticipate minor changes to the linked list that pertain to start/end points that define the
extent of the reach.
3. Invasive and Exotic Species. Plant species listed at:
http://www.nwk.usace.army.mil/Portals/29/docs/regulatory/nationwidepermits/2012/MOInvasivePlants.pdf
shall not be used for revegetation unless this requirement is waived by the district engineer based
on a case specific analysis of the revegetation plan. Best management practices should be used to
reduce the risk of transferring invasive plant and animal species to or from the project site. Best
management practices can be found at: http://www.invasivespeciesinfo.gov/toolkit/preventionbmp.shtml.
Known zebra mussel waters within Missouri can be found at:
http://nas.er.usgs.gov/queries/zmbyst.asp.
**We do not anticipate any significant changes to this condition.
4. Suitable Material. In addition to the specific examples in General Condition (6) of the
Nationwide Permits, the following materials are not suitable for fill activities in waters of the
United States: vehicle bodies, construction or demolition debris, garbage, tires, treated lumber
(chromated copper arsenate (CCA), creosote, and pentachlorophenol), liquid concrete not poured
into forms, grouted riprap, bagged cement, and sewage or organic waste.
Broken concrete used as bank stabilization must be reasonably well graded, consisting of pieces
varying in size from 20 pounds up to and including at least 150 pound pieces to withstand
expected high flows. Applicants must break all large slabs to conform to the well graded
requirement. Generally, the maximum weight of any piece should not be more than 500 pounds.
Gravel and dirt should not exceed 15% of the total fill volume when using broken concrete as fill.
All protruding reinforcement rods, trash, asphalt, and other extraneous materials must be
removed from the broken concrete prior to placement in waters of the United States.
**We do not anticipate any significant changes to this condition.
5. Priority Watersheds. The applicant must provide preconstruction notification to the District
Engineer for any regulated activity in a priority watershed. The list of priority watersheds
requiring notification is available on request from the Corps or at:
http://www.nwk.usace.army.mil/Portals/29/docs/regulatory/nationwidepermits/2012/PriorityWatersheds.pdf
**We are considering elimination of this condition based on experience with the condition
over the last 5 years.
6. Special Aquatic Resources. The applicant must provide preconstruction notification to the
District Engineer for any regulated activity which may impact a jurisdictional fen, seep or bog of
any size.
**We do not anticipate any significant changes to this condition.
7. Sensitive Aquatic Species. The applicant must provide preconstruction notification to the
District Engineer for any regulated activity in waters listed at:
http://www.nwk.usace.army.mil/Portals/29/docs/regulatory/nationwidepermits/2012/MORC7AquaticSpecies.pdf. The
submitted preconstruction notification will be coordinated in accordance with General Condition
31(d) with the U.S. Fish and Wildlife Service as determined appropriate by the Corps.
**We do not anticipate any significant changes to this condition. NOTE: General
Condition 31 in the 2012 NWPs is now listed as No. 32 in the proposed 2017 NWPs.
For Specific Nationwide Permits:
**We do not anticipate any significant changes to the following conditions.
8. NWP 12 Utility Line Activities. The applicant must provide preconstruction notification
to the District Engineer prior to commencing the activity if the discharge is in a special aquatic
site or when new utility line construction activities have multiple crossings of the same stream
and/or parallel a stream. The preconstruction notification must include a revegetation plan for
impacted wetlands and riparian areas in accordance with Regional Condition 3. Where
preconstruction notification is required for utility line activities within streams, the submittal
must include site-specific plans for the stabilization of disturbed channel bed and bank areas.
9. NWP 23 - Approved Categorical Exclusions. The applicant must provide preconstruction
notification to the District Engineer for all regulated Nationwide Permit 23 activities in waters of
the United States. In addition to information required by General Condition 31, the applicant
must identify the approved categorical exclusion that applies and provide documentation that the
project fits the categorical exclusion.
**NOTE: General Condition 31 in the 2012 NWPs is now listed as No. 32 in the proposed
2017 NWPs.
10. NWP 27 Stream and Wetland Restoration Activities. The applicant must provide
preconstruction notification to the District Engineer prior to commencing the activity if the
discharge is associated with impacts to forested wetlands.
11. NWP 44 Mining Activities. Nationwide Permit 44 cannot be used to authorize in-stream
mining projects, including in-stream sand and gravel mining operations.
Requirements for Waiver of 300 Linear Foot Limit Associated with NWPs 21, 29, 39, 40, 42,
43, 44, 50, 51, 52. The applicant must request the waiver in writing and provide documentation
and environmentally based reasons to support the waiver request in accordance with the
requirements of General Condition (31)(e) for making waiver determinations.
**NOTE: General Condition 31 in the 2012 NWPs is now listed as No. 32 in the proposed
2017 NWPs.
12. Lake of the Ozarks. The applicant must provide a preconstruction notification to the
District Engineer for any regulated activity associated with Nationwide Permits 3, 7, 12, 14, 15,
18, 22, 27, 33, and 45 within Lake of the Ozarks. A copy of this notification must also
concurrently be sent to Ameren Missouri. Nationwide Permits 2, 13, 16, 19, 25, 29, 31, 35, 36,
39, 41, and 44 are revoked in the Lake of the Ozarks. NWPs 1, 9, 10, 11 and 28 are only valid
when both Ameren Missouri and the Missouri State Water Patrol have approved the activity.
The Corps and Ameren Missouri, regardless of the request to use any Nationwide Permit, may
verify the activity under the provisions of Regional General Permit 38M
http://www.nwk.usace.army.mil/Portals/29/docs/regulatory/permits/GP-38M.pdf. Additional information
on Ameren Missouri and Lake of the Ozarks permit requirements can be found at the following
webpage: http://www.ameren.com/missouri/lake-of-the-ozarks
Index of Proposed Nationwide Permits, Conditions, and Definitions
Nationwide Permits
1. Aids to Navigation
2. Structures in Artificial Canals
3. Maintenance
4. Fish and Wildlife Harvesting, Enhancement, and Attraction Devices and Activities
5. Scientific Measurement Devices
6. Survey Activities
7. Outfall Structures and Associated Intake Structures
8. Oil and Gas Structures on the Outer Continental Shelf
9. Structures in Fleeting and Anchorage Areas
10. Mooring Buoys
11. Temporary Recreational Structures
12. Utility Line Activities
13. Bank Stabilization
14. Linear Transportation Projects
15. U.S. Coast Guard Approved Bridges
16. Return Water From Upland Contained Disposal Areas
17. Hydropower Projects
18. Minor Discharges
19. Minor Dredging
20. Response Operations for Oil or Hazardous Substances
21. Surface Coal Mining Activities
22. Removal of Vessels
23. Approved Categorical Exclusions
24. Indian Tribe or State Administered Section 404 Programs
25. Structural Discharges
26. [Reserved]
27. Aquatic Habitat Restoration, Establishment, and Enhancement Activities
28. Modifications of Existing Marinas
29. Residential Developments
30. Moist Soil Management for Wildlife
31. Maintenance of Existing Flood Control Facilities
32. Completed Enforcement Actions
33. Temporary Construction, Access, and Dewatering
34. Cranberry Production Activities
35. Maintenance Dredging of Existing Basins
36. Boat Ramps
37. Emergency Watershed Protection and Rehabilitation
38. Cleanup of Hazardous and Toxic Waste
39. Commercial and Institutional Developments
40. Agricultural Activities
41. Reshaping Existing Drainage Ditches
42. Recreational Facilities
43. Stormwater Management Facilities
44. Mining Activities
45. Repair of Uplands Damaged by Discrete Events
46. Discharges in Ditches
47. [Reserved]
48. Commercial Shellfish Aquaculture Activities
49. Coal Remining Activities
50. Underground Coal Mining Activities
51. Land-Based Renewable Energy Generation Facilities
52. Water-Based Renewable Energy Generation Pilot Projects
A. Removal of Low-Head Dams
B. Living Shorelines
Nationwide Permit General Conditions
1. Navigation
2. Aquatic Life Movements
3. Spawning Areas
4. Migratory Bird Breeding Areas
5. Shellfish Beds
6. Suitable Material
7. Water Supply Intakes
8. Adverse Effects from Impoundments
9. Management of Water Flows
10. Fills Within 100-Year Floodplains
11. Equipment
12. Soil Erosion and Sediment Controls
13. Removal of Temporary Fills
14. Proper Maintenance
15. Single and Complete Project
16. Wild and Scenic Rivers
17. Tribal Rights
18. Endangered Species
19. Migratory Bird and Bald and Golden Eagle Permits
20. Historic Properties
21. Discovery of Previously Unknown Remains and Artifacts
22. Designated Critical Resource Waters
23. Mitigation
24. Safety of Impoundment Structures
25. Water Quality
26. Coastal Zone Management
27. Regional and Case-by-Case Conditions
28. Use of Multiple Nationwide Permits
29. Transfer of Nationwide Permit Verifications
30. Compliance Certification
31. Activities Affecting Structures or Works Built by the United States
32. Pre-Construction Notification
District Engineer's Decision
Further Information
Definitions
Best management practices (BMPs)
Compensatory mitigation
Currently serviceable
Direct effects
Discharge
Enhancement
Ephemeral stream
Establishment (creation)
High Tide Line
Historic property
Independent utility
Indirect effects
Intermittent stream
Loss of waters of the United States
Non-tidal wetland
Open water
Ordinary high water mark
Perennial stream
Practicable
Pre-construction notification
Preservation
Re-establishment
Rehabilitation
Restoration
Riffle and pool complex
Riparian areas
Shellfish seeding
Single and complete linear project
Single and complete non-linear project
Stormwater management
Stormwater management facilities
Stream bed
Stream channelization
Structure
Tidal wetland
Vegetated shallows
Waterbody