Home

St. Louis District

Run scraper

The applicant seeks authorization to develop and construct a new 6.75- mile bike trail between the cities of Troy and O’Fallon in Madison and St. Clair Counties

Basic information

Fill out these two fields at minimum.

— or —

How Big?

Where?

Links to source documents

Raw text

You can copy from here when filling out the rest of the page.

The applicant seeks authorization to develop and construct a new 6.75- mile bike trail between the cities of Troy and O’Fallon in Madison and St. Clair Counties, Illinois. The new bike trail will be identified as the Scott-Troy Bike Trail. The trail would be part of an overall trail network which would connect the Madison County Bikeway System, to the north and eventually extend to the MetroBikeLink at the Shiloh/Scott AFB Metrolink Station, south of the City of O’Fallon. The bike trail would pass along the city limits of O’Fallon, Collinsville, Troy and the Village of Maryville.

The applicant seeks authorization to develop and construct a new 6.75- mile bike trail between the cities of Troy and O’Fallon in Madison and St. Clair Counties, Illinois. The new bike trail will be identified as the Scott-Troy Bike Trail. The trail would be part of an overall trail network which would connect the Madison County Bikeway System, to the north and eventually extend to the MetroBikeLink at the Shiloh/Scott AFB Metrolink Station, south of the City of O’Fallon. The bike trail would pass along the city limits of O’Fallon, Collinsville, Troy and the Village of Maryville.

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas