On June 1, 2016, the U.S. Army Corps of Engineers published in the Federal Register its proposal to reissue the 50 existing nationwide permits (NWPs) and issue two new NWPs. Nationwide permits are general permits issued on a nationwide basis to streamline the authorization of activities that result in no more than minimal individual and cumulative adverse environmental effects. Many of the proposed NWPs require notification to the district engineer before commencing those activities, to ensure that the activities authorized by those NWPs cause no more than minimal individual and cumulative adverse environmental effects.
On June 1, 2016, the U.S. Army Corps of Engineers published in the Federal Register its
proposal to reissue the 50 existing nationwide permits (NWPs) and issue two new NWPs.
Nationwide permits are general permits issued on a nationwide basis to streamline the
authorization of activities that result in no more than minimal individual and cumulative adverse
environmental effects. Many of the proposed NWPs require notification to the district engineer
before commencing those activities, to ensure that the activities authorized by those NWPs
cause no more than minimal individual and cumulative adverse environmental effects.