WATER CONTROL STRUCTURES IN VERMILION PARISH
NAME OF APPLICANT: Apache Louisiana Minerals, L.L.C., Post Office Box 206, Houma, Louisiana 70361-0206.
LOCATION OF WORK: Boston Canal, North Bayou Canal, and Deer Bayou, located approximately 6.0 miles northeast of Intracoastal City, in Vermilion Parish, Louisiana, as shown on the enclosed drawings.
Location: Project Site No.1: Latitude: 29°48ʹ56ʺN/ Longitude: -92°03ʹ25ʺW; Project Site No. 2: Latitude: 29°48ʹ38ʺN/ Longitude: -92°04ʹ51ʺW; Project Site No. 3: Latitude: 29°49ʹ37ʺN/ Longitude: -92°04ʹ51ʺW; Project Site No. 4: Latitude: 29°50ʹ04ʺN/ Longitude: -92°02ʹ20ʺW, Hydrologic Unit Code: 08080103 – Vermilion-Teche Basin.
CHARACTER OF WORK: Project Site No. 1: In the Boston Canal, conduct dredging operations in a 40-foot wide by 230-foot long area, install a 40-foot long 24-inch diameter culvert with flap gate and 5-foot wide by 20-foot long rip-rap, and place approximately 1,077 cubic yards of dredged fill material in an approximately 50-foot wide by 180-foot long and 10-foot wide by 45-foot long temporary spoil placement areas and 5 cubic yards of concrete for bankline stabilization. Approximately 0.016 of an acre of jurisdictional emergent wetlands and 0.35 of an acre of waterbottoms would be temporarily impacted and 0.002 of an acre of jurisdictional emergent wetlands would be permanently impacted via project implementation. Project Site No. 2: Along the east bankline of North Bayou Canal, conduct dredging operations in a 8-foot wide by 20-foot long area, install a 25-foot long 24-inch diameter culvert with flap gate and two 5-foot wide by 20-foot long areas of rip-rap, remove an existing 25-foot long 18-inch diameter culvert, and place approximately 30 cubic yards of dredged fill material in a 10-foot wide by 15-foot long temporary spoil placement area and 10 cubic yards of concrete for bankline stabilization. Approximately 0.007 of an acre of jurisdictional emergent wetlands would be temporarily impacted and 0.004 of an acre of jurisdictional emergent wetlands would be permanently impacted via project implementation. Project Site No. 3: On top of an existing spoil bank, east of North Bayou Canal, conduct dredging operations in a 6-foot wide by 60-foot long area, install a 40-foot long 36-inch diameter culvert with flap gate and 5-foot wide by 20-foot long rip-rap, and place approximately 63 cubic yards of dredged fill material in a 15-foot wide by 30-foot long temporary spoil area and 5 cubic yards of concrete for bankline stabilization. Approximately 0.018 of an acre of jurisdictional emergent wetlands would be temporarily impacted and 0.002 of an acre of jurisdictional emergent wetlands would be permanently impacted via project implementation. Project Site No. 4: On top of an existing spoil bank, east of Deer Bayou, conduct dredging operations in a 6-foot wide by 80-foot long area, install a 40-foot long 24-inch diameter culvert with flap gate and a 5-foot wide by 20-foot long rip-rap, and place approximately 62 cubic yards of dredged fill material in a 10-foot wide by 45-foot long temporary spoil area and 5 cubic yards of concrete for bankline stabilization. Approximately 0.02 of an acre of jurisdictional emergent wetlands would be temporarily impacted and 0.002 of an acre of jurisdictional emergent wetlands would be permanently impacted via project implementation.Permanent wetland impacts total approximately 0.01 of an acre via project implementation. The purpose of the water control structures is to prevent saltwater intrusion, increased tide levels, and maintain water levels for migratory waterfowl. The applicant agrees to compensate for wetland impacts by purchasing credits at a Department of the Army approved mitigation bank.