Interested parties are hereby notified that the Walla Walla District, Army Corps of Engineers has received an application for a Department of the Army permit for certain work in waters of the United States along the Snake River in Bonneville County, Idaho. Idaho Falls Power is proposing to remove sediment and debris from the intake of the power house at their Upper Plant. Sediment and debris removal would return the channel to its previous condition.

Public Notice

Interested parties are hereby notified that the Walla Walla District has received an application for a Department of the Army permit for certain work in waters of the United States as described below and shown on the attached drawings and attachments:

• Idaho Falls Power Sediment Removal Maps 26May2016 • Stormwater Pollution Prevention Plan (SWPP) Part 1 • Stormwater Pollution Prevention Plan (SWPP) Part 2

APPLICANT: Idaho Falls Power, PO Box 50220, Idaho Falls, Idaho 83405, 208-388-5472, Mr. Jason Cooper

USACE PM CONTACT: James Joyner, 208-522-1676; Email: james.m.joyner@usace.army.mil

PURPOSE: The purpose of this project is to remove built up sediment and debris from the intake of the power house at Idaho Falls Power’s Upper Plant that is affecting power generation. Sediment and debris removal would return the channel to the condition that existed when the hydropower project initially came on line.

WATERWAY: Snake River

LOCATION: The proposed project would be located on the Snake River at River Mile 800.5 North of Idaho Falls, within Section 25 of Township 3 North, Range 37 East, near latitude 43.55272º N and longitude -112.05097º W, in Bonneville County, near Idaho Falls, Idaho (See Sheet 1).

DRIVING DIRECTIONS: The site can be reached by taking Lindsey Boulevard north from Idaho Falls. Lindsey Boulevard turns into North River Road. Turn right, east on 65 North and drive east approximately 0.25 miles to the dam site. Permission from the landowner is required to access private property.

AUTHORITY: This permit will be issued or denied under the authority of Section 404 of the Clean Water Act (33 U.S.C. 1344). A Department of the Army permit is required for the discharge of dredged or fill material into waters of the United States, including wetlands.

WORK: The proposed project entails the following work: • Removal of 63,000 cubic yards of sediment and debris from the Snake River impacting approximately 15 acres of river bed • Deposition of excavated material in non-wetlands adjacent to and above the ordinary high water mark of the Snake River • Temporary discharge of 3,700 cubic yards of imported gravel/cobble material into the Snake River associated withinstallinga temporary cofferdam to de-water the project site • Mechanized land clearing and temporary conversion of approximately 1500 square feet of fringe scrub-shrub/emergentwetland associated with providing temporary equipment access to the channel bottom. ADDITIONAL INFORMATION: The project entails the construction of a cofferdam approximately 2,500 feet upstream of the power house and approximately 350 feet downstream of the bifurcation of the river channel. During construction of the cofferdam Idaho Falls Power will shut down the power house and fully lower the gates at Upper Plant Dam #1. This will draw the flow through the east channel and lower the elevation of the river, without decreasing the flows, from the normal pool elevation of 4734.7 feet to 4728 feet+/-. The cofferdam will consist of 3 inch minus gravel (alluvium, locally called "pit run"). The cofferdam will be constructed by pushing and placing the material into the river channel. There will be dewatering of the downstream channel. After installation of the cofferdam any remaining seepage water will be pumped out of the channel and into a sedimentation pond before releasing water into the river.

Excess sediment and debris in the project reach will be removed using bulldozers and scrapers. The sediment will be placed in non-wetland areas adjacent to the river. The sediment will be placed and sculpted in such a manner as to avoid sediment transport to the river. Silt Fences and/or straw waddles will be installed at the perimeter of the sediment waste at the downstream slopes to minimize sediment transport. Additional and more specific measures to be employed to control erosion and sedimentation are detailed in the Stormwater Pollution Prevention Plan (SWPP) developed for the project (attached).

It is estimated that approximately 63,000 cubic yards of sediment and debris will be removed from the river channel. The removal of the sediment will return the channel to the approximate conditions of the river at the time of the construction of Dam #2 at the Upper Plant. Upon completion of the sediment removal the cofferdam will be removed and the gates at Dam # 1 will be raised to restore flows to the power house and generation will be brought back on line. The project area consists primarily of river channel/reservoir pool and adjacent uplands dominated by sagebrush. The project would impact approximately 15 acres of river/reservoir bottom. There is a small-narrow scrub-shrub/emergent wetland fringe at an elevation corresponding to the normal pool of the reservoir. These wetlands may be impacted at up to three locations to allow temporary equipment access into the river bottom. Each access point would disturb an area approximately 40 to 50 feet in length along the river by about 10 feet in width (400 to 500 square feet). No additional wetlands would be impacted. CONSTRUCTION PERIOD: Applicant proposes to start construction on October 1, 2016 and end by October 31, 2016. The permit would authorize construction for a period of three years. PROPOSED MITIGATION: The applicant is proposing no compensatory mitigation for the project. The applicant states that “project would not negatively affect the waterway or any wetlands” and “will restore the waterways to the condition that existed when the project came on line.” There would be no permanent loss of waters (river/reservoir) or wetlands. Wetlands impacted to provide temporary access to the reservoir pool are anticipated to quickly recover after project completion.

OTHER ENVIRONMENTAL DOCUMENTS and DA PERMITS ISSUED TO APPLICANT: The project was originally constructed between 1980 and 1983 under Federal Energy Regulatory Committee (FERC) license number P-2842-ID. The applicant prepared and completed a Stormwater Pollution Prevention Plan (SWPP) dated April 26, 2016 (attached). This plan would be implemented in compliance with Section 402 of the Clean Water Act (National Pollution Discharge Elimination System [NPDES] Construction General Permit). It is anticipated that an NPDES permit under Section 402 of the Clean Water Act would also be required.

WATER QUALITY CERTIFICATION: This notice will also serve as public notice that the Idaho Department of Environmental Quality (IDEQ) is evaluating whether to certify that the discharge of dredge and/or fill material proposed for this project will not violate existing water quality standards. A Department of the Army permit will not be issued until water quality certification has been issued or waived by the IDEQ, as required by Section 401 of the Clean Water Act. If water quality certification is not issued, waived or denied within sixty (60) days of this public notice date, and an extension of this period is not requested by and granted to the IDEQ, certification will be considered waived.

Any person may provide written comments to IDEQ within thirty (30) days of this Public Notice to request in writing that IDEQ provide notice of their preliminary 401 Certification decision. Comments concerning Water Quality Certification for this project should be mailed to: Idaho Department of Environmental Quality Idaho Falls Regional Office 900 North Skyline Drive, Suite A Idaho Falls, Idaho 83402

AQUATIC RESOURCE DESCRIPTION: The project area is located about three and a half miles upstream of the intersection of US Highway 20 Bridge crossing of the Snake River in Idaho Falls. The Snake River at the north end of the project site bifurcates to form two channels, both of which are impounded as part of Idaho Falls Power’s Upper Plant. The river in the reservoir pool is approximately 250 feet wide. The pool varies in depth from 10 – 20 feet. The normal pool elevation is 4734.7 feet above mean sea level (msl) with the ordinary high water mark being within a tenth of a foot of normal pool. Given the relatively stable state of the reservoir pool a narrow discontinuous fringe of wetland has formed around the pool. These wetlands consist of a mix of emergent and scrub/shrub wetlands.

ANTICIPATED IMPACTS ON AQUATIC ENVIRONMENT: The proposed project would impact a total of approximately 15 acres of the river channel/reservoir pool due to dredging activities. Additionally, approximately 1500 square feet of emergent and scrub/shrub wetland would be temporarily impacted to allow equipment access to the channel bottom. As a result of temporary dewatering and dredging, fringe wetlands may be temporarily stressed and non-motile aquatic species killed. However, once the project is complete and flows returned to the channel it is anticipated that wetlands would rebound and aquatic species would quickly re-colonize the project reach.

OTHER AUTHORIZATIONS: The proposed project may require approval from the Idaho Department of Water Resources under the Stream Protection Act and a section 401 water quality certification from the Idaho Department of Environmental Quality.

CULTURAL RESOURCES: Coordination is currently being conducted with the office of the Idaho State Historic Preservation Officer to determine if this activity will affect a site that is listed on the National Register of Historic Places, or a site that may be eligible for listing on the Register. We are also coordinating with the appropriate Tribal entity or the Tribal Historic Preservation Offices for the Shoshone-Bannock Tribes, to determine if there are any tribal historic or cultural interests within the project area.

TRIBAL TREATY RIGHTS and INTERESTS: Federal agencies acknowledge the federal trust responsibility arising from treaties, statues, executive orders and the historical relations between the United States and American Indian Tribes. The federal government has a unique trust relationship with federally recognized American Indian Tribes, including the Shoshone-Bannock Tribes. The Corps has a responsibility and obligation to consider and consult on potential effects to Tribal rights, uses and interests. The Corps further recognizes there may be a need for additional and on-going consultation.

ENDANGERED SPECIES: The project is not anticipated to have an effect on species listed as Endangered or Threatened under the Endangered Species Act or their critical habitat. Preliminarily, we have determined the described activity would have no effect on such ESA listed species. However, coordination is currently being conducted with the U.S. Fish and Wildlife Service (USFWS) to determine if the activity will have any effect on species designated as endangered or threatened under the Endangered Species Act, or their critical habitat, under the Endangered Species Act of 1973 (87 Stat. 844).

ESSENTIAL FISH HABITAT: The Magnuson-Stevens Fishery Conservation and Management Act, as amended by the Sustainable Fisheries Act of 1996, requires all Federal agencies to consult with the National Marine Fisheries Service on all actions or proposed actions, permitted, funded or undertaken by the agency that may adversely affect Essential Fish Habitat (EFH). No EFH species are known to use the project area. Preliminarily, we have determined the described activity would have no effect on EFH.

ENVIRONMENTAL IMPACT STATEMENT: Preliminary review indicates the proposed activities will not require preparation of an Environmental Impact Statement. Comments provided will be considered in preparation of an Environmental Assessment.

EVALUATION: The decision whether to issue a permit will be based on an evaluation of the probable impact, including cumulative impacts, of the proposed activity on the public interest. This decision will reflect the national concern for both protection and utilization of important resources. The benefit which reasonably may be expected to accrue from the proposal must be balanced against its reasonably foreseeable detriments. All factors which may be relevant to the proposal will be considered, including the cumulative effects thereof; among those are conservation, economics, aesthetics, general environmental concerns, wetlands, historic properties, fish and wildlife values, flood hazards, floodplain values, land use, navigation, shoreline erosion and accretion, recreation, water supply and conservation, water quality, energy needs, safety, food and fiber production, mineral needs, consideration of property ownership and in general, the needs and welfare of the people. In addition, our evaluation will include application of the EPA Guidelines (40 CFR 230) as required by Section 404(b) (1) of the Clean Water Act.

CONSIDERATION OF PUBLIC COMMENTS: The Corps of Engineers is soliciting comments from the general public; Federal, State and local agencies and officials, Tribal entities and other interested parties in order to consider and evaluate the impacts of this proposed activity. Any comments received will be considered by the Corps of Engineers to determine whether to issue, modify, condition or deny a permit for this proposal. To make this decision, comments are used to assess impacts on endangered species, historic properties, water quality, general environmental effects and the other public interest factors listed above. Comments are used in the preparation of an Environmental Assessment and/or an Environmental Impact Statement pursuant to the National Environmental Policy Act. Comments are also used to determine the need for a public hearing and to determine the overall public interest of the proposed activity.

PUBLIC HEARING: Any person may request in writing, within the comment period specified in this notice, that a public hearing be held to consider this proposed activity. Requests for a public hearing shall state specific reasons for holding a public hearing.

COMMENT & REVIEW PERIOD: Interested parties are invited to provide comments on the proposed activity, which will become a part of the record and will be considered in the final decision.

Please mail all comments to:

U.S. Army Corps of Engineers ATTN: James M. Joyner Idaho Falls Regulatory Office 900 N Skyline Drive, Suite A Idaho Falls, Idaho 83402

or email comments to james.m.joyner@usace.army.mil.

Comments should be received no later than the comment due date of July 14, 2016, as indicated on this notice, to receive consideration.

Kelly J. Urbanek Chief, Regulatory Division

Enclosures: 1. Idaho Falls Power Sediment Removal Maps 26May2016 2. Stormwater Pollution Prevention Plan (SWPP) Part 1 3. Stormwater Pollution Prevention Plan (SWPP) Part 2

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas