Home

St. Louis District

Run scraper

The Alton Casino LLC seeks authorization to periodically remove accumulated sediment from beneath and directly adjacent to vessels within the Alton Casino complex. Dredging up to 15

Basic information

Fill out these two fields at minimum.

— or —

How Big?

Where?

Links to source documents

Raw text

You can copy from here when filling out the rest of the page.

The Alton Casino LLC seeks authorization to periodically remove accumulated sediment from beneath and directly adjacent to vessels within the Alton Casino complex. Dredging up to 15,000 cubic yards annually would only occur on an as needed basis to avoid jeopardizing the structural integrity of vessel hulls. Dredge material would be disposed at an upland area, if available, when dredging is required. Open river dredge disposal is proposed as an alternative if no nearby upland disposal areas are available when dredging becomes a necessity. The activity site is located at approximate latitude 38.88959, longitude -90.18711, near #1 Piasa Street in Alton, Madison County, Illinois, along the left descending bank of the Mississippi River, at approximate river mile 203.0. The Public Notice comment period opens on June 14, 2016, and closes on July 5, 2016.

The Alton Casino LLC seeks authorization to periodically remove accumulated sediment from beneath and directly adjacent to vessels within the Alton Casino complex. Dredging up to 15,000 cubic yards annually would only occur on an as needed basis to avoid jeopardizing the structural integrity of vessel hulls. Dredge material would be disposed at an upland area, if available, when dredging is required. Open river dredge disposal is proposed as an alternative if no nearby upland disposal areas are available when dredging becomes a necessity. The activity site is located at approximate latitude 38.88959, longitude -90.18711, near #1 Piasa Street in Alton, Madison County, Illinois, along the left descending bank of the Mississippi River, at approximate river mile 203.0. The Public Notice comment period opens on June 14, 2016, and closes on July 5, 2016.

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas