You can copy from here when filling out the rest of the page.
Peter Olmstead is the Regulatory point-of-contact for this permit application from Idaho Power Company to conduct work impacting the Snake River at river mile 333.0, in Huntington, Oregon.
PUBLIC NOTICE forApplication for Permit
Issue Date: June 15, 2016
Expiration Date: July 15, 2016
US Army Corps of Engineers No: NWP-2016-147
30-Day Notice Oregon Department of State Lands No: 58952
Interested parties are hereby notified the U.S. Army Corps of Engineers, Portland District (Corps) has received an application for a Department of the Army permit for certain work in waters of the United States, as described below and shown on the attached plans. The Corps is soliciting comments on the proposed work.
Applicant: Idaho Power Company
Attention: Bill Lynch
P.O. Box 70
Boise, ID 83707
Email:blynch@idahopower.com
Telephone: (208) 388-5490
Location: The project site is located at Farewell Bend State Park, 23751 Old Highway 30, Huntington, Oregon. The site is in Section 33, Township 14 South, Range 45 East.
Latitude and Longitude: 44.3056 North, -117.2237 West
Waterway: The project is located in the Snake River (Brownlee Reservoir) at River Mile 333 and adjacent wetlands.
Project Purpose: The applicant’s stated purpose is to stabilize the banks along Farewell Bend State Park as directed by FERC.
Project Description: Installation of a vegetated riprap revetment is proposed along approximately 3,000 linear feet of the waterway to prevent further erosion of the bank at Farewell Bend State Park. Rock will be placed against the near 20-foot vertical bank to an elevation of 2083 feet (NAVD88) and extended riverward at 3:1 slope until it meets with existing ground. The proposed riprap would not extend into any wetlands, however a temporary crossing will be constructed in “Wetland A”, a small lacustrine wetland abutting the reservoir. Construction access will avoid placement of gravel bedding directly on the wetland, and matting will be used below gravel bedding. Work within Brownlee Reservoir will occur in the dry during low pool depth elevations. A temporary access road will also be constructed along the shoreline within the area of improvement. This will consist mainly of grading a path in order to reach the extents of the project with construction materials and equipment. The temporary access road will be removed as work progresses. In total, the project would result in the excavation of 6,110 cubic yards of material and placement of 7,860 cubic yards of material within 1.37 acres of Brownlee Reservoir. In addition, 74 cubic yards of fill material will be temporarily discharged into 0.03 acres of “Wetland A” for a period of 8 months or less.
Mitigation:The applicant did not propose compensatory mitigation in the permit application. The Corps will determine the type and amount of compensatory mitigation necessary to offset environmental losses from the proposed project.
Drawings: Thirty two (32) drawings are attached and labeled Corps No. NWP-2016-147. Copies of this public notice, which have been mailed or otherwise physically distributed, feature project drawings in black and white. The electronic version features those drawings in color, which we think more accurately illustrates the proposed project. To access the electronic version of this public notice, go to the Portland District website at http://www.nwp.usace.army.mil/ and select Regulatory Branch Permit Information. At the Regulatory page select Regulatory Public Notices.
Authority: The proposed project will be evaluated under the following:
Section 10, Rivers and Harbors Act 1899 (33 U.S.C. 403), for work in or affecting navigable waters of the United States.
Section 404, Clean Water Act (33 U.S.C. 1344), for discharge of dredged or fill material into waters of the United States.
Clean Water Act Section 404(b)(1) Guidelines:The described discharge will be evaluated for compliance with guidelines promulgated by the U.S. Environmental Protection Agency under authority of Section 404(b)(1) of the Clean Water Act. The 404(b)(1) Guidelines are the substantive criteria used in evaluating discharges of dredged or fill material into waters of the United States. Should a permit be issued, the Corps will evaluate the fill material source (i.e., borrow site) prior to the start of construction.
Water Quality Certification: Section 401 of the Clean Water Act (33 U.S.C. 1341) requires applicants to obtain a water quality certification for proposed discharges into waters of the United States. A permit for the described work will not be issued until certification has been issued or is waived from the certifying state. Attached is the state's notice for a water quality certification.
Endangered Species: Section 7 of the Endangered Species Act (ESA) (16 U.S.C 1536) requires federal agencies to consult with the National Marine Fisheries Service (NMFS) and/or U.S. Fish and Wildlife Service (USFWS) on all actions that may affect a species listed (or proposed for listing) under the ESA as threatened or endangered or that may adversely modify designated critical habitat. The Corps’ preliminary review indicates the described activity will not affect any endangered species or designated critical habitat. Consultation under Section 7 of the ESA is not required for the described activity. The Corps will make a final determination on the need to consult after receipt of comments from this public notice including any comments provided by the NMFS and/or USFWS.
Essential Fish Habitat: Section 305(b)(2) of the Magnuson-Stevens Fishery Conservation and Management Act (MSA) as amended (16 U.S.C 1855), requires Federal agencies to consult with the NMFS on all actions, or proposed actions, permitted, funded, or undertaken by the agency, that may adversely affect Essential Fish Habitat (EFH). The Corps’ preliminary review indicates the described activity would not adversely affect EFH at the project location or in its vicinity. The Corps will make a final determination on the need to consult on EFH after receipt of comments from this public notice including any comments provided by the NMFS.
Historic Properties/Cultural Resources:Section 106 of the National Historic Preservation Act of 1966, as amended (16 U.S.C. 470), requires Federal agencies to consult with the appropriate State and/or Tribal Historic Preservation Officer to take into account the effects of actions they undertake or permit on historic properties listed in or eligible for listing in the National Register of Historic Places.
This notice has been provided to the State Historic Preservation Office (SHPO), interested Native American Indian Tribes, and other interested parties. If you have information pertaining to cultural resources within the permit area, please provide this information to the Corps’ project manager identified at the end of this notice to assist in a complete evaluation of potential effects.
State and Local Authorizations: The applicant has or will be applying for the following additional governmental authorizations for the project:
State removal/fill permit (ODSL)
401 Water quality Cert (ODEQ)
Public Hearing: Any person may request in writing within the comment period specified in this notice that a public hearing be held to consider this application. Requests for public hearings shall state with particularity the reasons for holding a public hearing.
Evaluation: The decision whether to issue a permit will be based on an evaluation of the probable impact, including cumulative impacts, of the described activity on the public interest. That decision will reflect the national concern for both protection and utilization of important resources. The benefit, which reasonably may be expected to accrue from the described activity, must be balanced against its reasonably foreseeable detriments. All factors, which may be relevant to the described activity will be considered including the cumulative effects thereof; among those are conservation, economics, aesthetics, general environmental concerns, wetlands, historic properties, fish and wildlife values, flood hazards, floodplain values, land use, navigation, shoreline erosion and accretion, recreation, water supply and conservation, water quality, energy needs, safety, food and fiber production, mineral needs, consideration of property ownership and, in general, the needs and welfare of the people.
The Corps is soliciting comments from the public; Federal, state, and local agencies and officials; Indian Tribes; and other interested parties in order to consider and evaluate the impacts of the proposed project. Comments received will be considered by the Corps to determine whether to issue, modify, condition or deny a permit for this proposal. Comments are used in the preparation of an Environmental Assessment and/or an Environmental Impact Statement pursuant to the National Environmental Policy Act. Comments are also used to determine the need for a public hearing.
Submitting Comments: Interested parties are invited to provide comments on the proposed project. Comments may be submitted by conventional mail or email. All comments received will be considered in determining whether authorizing the work would be contrary to the public interest.
Either conventional mail or e-mail comments must include the Corps reference number as shown on page 1 and include the commenter’s name and address. In order to be accepted, e-mail comments must originate from the author’s e-mail account and must include on the subject line of the e-mail message the Corps reference number. All comments received will become part of the administrative record and are subject to public release under the Freedom of Information Act including any personally identifiable information such as names, phone numbers, and addresses.
Additional information about the proposed project may be obtained from the Corps Project Manager listed below. All comments, whether by conventional mail or email, must be received no later than the expiration date of this public notice to ensure consideration. Comments should be submitted to the following mailing address or email address:
U.S. Army Corps of Engineers
Peter Olmstead
La Grande Field Office
3502 Highway 30
La Grande, Oregon 97850-5628
Email: peter.d.olmstead@usace.army.mil
Telephone: (541) 962-0401
PUBLIC NOTICE
Oregon Department of Environmental Quality (DEQ)
Water Quality 401 Certification
Notice Issued: June 15, 2016
Written Comments Due: July 15, 2016
Corps of Engineers No: NWP-2016-147
Oregon Department of State Lands No: 58952
WHO IS THE APPLICANT: Idaho Power Company
LOCATION OF CERTIFICATION ACTIVITY: See attached U.S. Army Corps of Engineers public notice.
WHAT IS PROPOSED: See attached U.S. Army Corps of Engineers public notice on the proposed project.
NEED FOR CERTIFICATION: Section 401 of the Federal Clean Water Act requires applicants for Federalpermits or licenses to provide the Federal agency a water quality certification from the State ofOregon if the proposed activity may result in a discharge to waters of the state.
DESCRIPTION OF DISCHARGES: See attached U.S. Army Corps of Engineers public notice on the proposedproject.
WHERE TO FIND DOCUMENTS: Documents and materials related to water quality issues as a result ofthe proposal are available for examination and copying at Oregon Department of EnvironmentalQuality, 401 Water Quality Certification Coordinator, Northwest Region,700 NE Multnomah Street, Suite 600, Portland, Oregon 97232. Other project materials are availableby contacting the Corps per the attached public notice.
Scheduling an appointment will ensure that water quality documents are readily accessible duringyour visit. To schedule an appointment please call DEQ Water Quality at Northwest Region at (503)229-5263.
Any questions on the water quality certification process may be addressed to the 401 ProgramCoordinator at (503) 229-6030 or toll free within Oregon at (800) 452-4011. People with hearingimpairments may call the Oregon Telecommunications Relay Service at 1-800-735-2900.
PUBLIC PARTICIPATION:
Public Hearing: Oregon Administrative Rule (OAR) 340-48-0032 (2) states that “The Corps providespublic notice of and opportunity to comment on the applications, including the application forcertification, provided that the department (DEQ), in its discretion, may provide additionalopportunity for public comment, including public hearing.”
Written comments:
Written comments on project elements related to water quality must be received at the OregonDepartment of Environmental Quality by 5 p.m. on the date specified in the upper right section onpage one of this notice. Written comments may be emailed, mailed or faxed as described below:
Email - 401publiccomments@deq.state.or.us
Mail - Oregon Department of Environmental Quality, Northwest Region
700 NE Multnomah Street, Suite 600
Portland, Oregon 97232
Attn: 401 Water Quality Certification Coordinator
Fax - (503) 229-6957
WHAT HAPPENS NEXT: DEQ will review and consider all comments received during the public commentperiod. Following this review, certification of the proposal may be issued as proposed, issuedwith conditions, or denied. You will be notified of DEQ's final decision if you submit commentsduring the comment period. Otherwise, if you wish to receive notification, please call or write DEQ at the above address.
ACCESSIBILITY INFORMATION: This publication is available in alternate format (e.g. large print,Braille) upon request. Please contact DEQ Office of Communications and Outreach at (503) 229-5317or toll free within Oregon at 1-800-452-4011 to request an alternate format. People with a hearingimpairment can receive help by calling the Oregon Telecommunications Relay Service at 1-800-735-2900.
1
32
3
32
2
32
4
32
TRUCK WHEEL WASH (AS NEEDED)
4
32
STRAW WATTLES
STABILIZED
CONSTRUCTION
ENTRANCE
2
32
1
32
SILT FENCE
x
x
130 2ND AVENUE S.
EDMONDS, WASHINGTON 98020
(425) 778-0907, FAX (425) 778-6409
ESCP BEST MANAGEMENT PRACTICES (BMPs):
5.
6.
7.
8.
9.
10.
FILTER FABRIC
MATERIAL
A
NEWLY GRADED
OR DISTURBED
SIDE SLOPE
GROUND
SURFACE
4' MIN
4.
WIRE FABRIC
A
8"
STEEL POSTS 6' O.C.
2'-6" MIN
3.
2"x4"x14 GAUGE
WELDED WIRE
FABRIC OR EQUAL
FILTER FABRIC MATERIAL
10"
2.
PRESERVE EXISTING VEGETATION TO THE EXTENT PRACTICAL. AVOID COMPACTION
AND GRADING NEAR TREES AND INSTALL ORANGE PLASTIC FENCING AROUND AREAS
WHICH ARE NOT TO BE DISTURBED.
REESTABLISH VEGETATIVE COVER OR INSTALL EROSION CONTROL MATS IN ALL
AREAS OF DISTURBANCE INCLUDING AREAS NOT DESIGNATED FOR BANK
STABILIZATION.
ALL IMPERVIOUS AREAS WITHIN THE PROJECT AREA SHALL REMAIN FREE OF
CONSTRUCTION DEBRIS AND SEDIMENT TRACKED FROM ACTIVE WORK ZONE.
SWEEPING SHALL BE DONE WEEKLY AND PRIOR TO KNOWN STORM EVENTS.
SILT FENCES SHALL BE INSTALLED ON SLOPE CONTOURS TO THE EXTENT PRACTICAL
WITH TIEBACKS OR TURN UPS TO ALLOW FOR COMPARTIZING OF RUNOFF AND
LIMIT FAILURES AT CRITICAL LOW POINTS. IMPLEMENT USE OF J-HOOKS FOR FENCES
INSTALLED PARALLEL TO THE SLOPE. SEE DETAIL 1-31
STABILIZED CONSTRUCTION ENTRANCE AND EXIT SHALL BE INSTALLED AT BOTH
ENTRANCES NEAR THE BOAT DOCK TO LIMIT SEDIMENT TRACKING ON IMPERVIOUS
PARKING LOTS AND ROADS. SEE DETAIL 2-31.
STOCKPILES SHALL BE COVERED AT ALL TIMES UNLESS IN ACTIVE USE. IMPERMEABLE
BARRIER MUST BE PLACED UNDERNEATH STOCKPILE AND STRAW WATTLES OR
COMPOST SOCKS MAY BE INSTALLED AROUND STOCKPILE TO LIMIT SEDIMENT WASH
OUT WHILE UNCOVERED DURING ACTIVE LOADING. SEE DETAIL 3-31
ADDITIONAL MEASURES, SUCH AS CONSTRUCTED WHEEL WASH SYSTEMS, WASH
PADS, OR INCREASED SWEEPING FREQUENCY MAY BE REQUIRED TO ENSURE THAT
ALL PAVED AREAS ARE KEPT CLEAN AND TRACK OUT TO ROAD RIGHT OF WAY DOES
NOT OCCUR FOR THE DURATION OF THE PROJECT.
DUE TO THE PROXIMITY OF SURFACE WATER, ADDITIONAL ESCP MEASURES ARE
REQUIRED AT CRITICAL POINTS. LOW POINTS ALONG SILT FENCE SHOULD BE
REINFORCED WITH HAY BALES TO LIMIT FAILURE. SLOPES GREATER THAN 4:1,
ADDITIONAL STRAW WATTLES SHALL BE INSTALLED ON 10 FOOT INTERVALS FROM
SILT FENCE UNTIL THE EXTENT PRACTICAL WITH ACTIVE WORK AREA. SEE DETAIL
4-31.
WETLAND AREAS SHALL BE SURROUNDED BY FIBER ROLLS TO THE EXTENT
PRACTICAL. SILT FENCE SHALL BE INSTALLED WITH J-HOOKS AROUND THE
TEMPORARY CROSSING AND WETLAND AREA TO LIMIT RUNOFF DIRECTLY ENTERING
THE WETLAND.
ALL BMPS SHALL BE INSTALLED ACCORDING TO THE DEQ CONSTRUCTION BEST
MANAGEMENT PRACTICES MANUAL
8"
1.
WIRE RINGS (TYPICAL)
SECTION A-A
ELEVATION
TRIBUTARY AREA
FIBER ROLLS
ENDED
ECOMM
R
M
U
MAXIM IDTH = 500'
W
MAXIMUM
RECOMMENED SLOPE
LENGTH = 100'
NOTES
1. INSPECT AND REPAIR FENCE AFTER EACH STORM
EVENT AND REMOVE SEDIMENT WHEN NECESSARY.
TURN LAST 6' OF FENCE UP-SLOPE
1
31
2. SEDIMENT FENCE SHALL BE INSTALLED ON SLOPE
CONTOURS AND 1-2 FEET OFF TOE OF SLOPE TO
EXTENT PRACTICAL TO MAXIMIZE PONDING AND
SEDIMENT ACCUMULATION EFFICIENCY.
SILT FENCE DETAIL
NO SCALE
4
31
EX
IST
ING
A
RO
AS
D
STRAW WATTLES DETAIL
NO SCALE
RE
QU
IRE
D
ESCP GENERAL NOTES:
1.
IN
'M
2.
15
4" TO 8" QUARRY
SPALLS, 12" MIN DEPTH
PROVIDE FULL WIDTH OF
INGRESS/EGRESS AREA
GEOTEXTILE
2
31
STABILIZED CONSTRUCTION ENTRANCE DETAIL
NO SCALE
3.
4.
5.
6.
MINIMUM 12" OVERLAP
OF SEAMS
NOTES
7.
1. STOCKPILE SOIL WILL BE COVERED AND SECURED FROM
WIND, RAIN, AND OTHER DISTURBANCES AT ALL TIMES
EXCEPT DURING ACTIVE SOIL LOADING AND UNLOADING.
2. MINIMUM 12" OVERLAP OF ALL SEAMS REQUIRED, WITH
SEAMS SECURED WITH CONTINUOUS ROWS OF SANDBAGS.
8.
9.
THE IMPLEMENTATION OF THESE FACILITIES DEFINED IN THE ESCP AND THE CONSTRUCTION, MAINTENANCE,
REPLACEMENT, AND UPGRADING OF THESE ESCP FACILITIES IS THE RESPONSIBILITY OF THE ESCP CERTIFIED
SUPERVISOR UNTIL ALL CONSTRUCTION IS APPROVED.
THE ESCP FACILITIES SHOWN ON THIS PLAN MUST BE CONSTRUCTED PRIOR TO ANY CONSTRUCTION ACTIVITY
OR ACTIVITY IN WHICH LAND IS DISTURBED SO AS TO ENSURE THAT THE TRANSPORT OF SEDIMENT TO
SURFACE WATERS IS MINIMIZED. ADDITIONAL ESCP MEASURES MAY BE IMPLEMENTED DURING
CONSTRUCTION AS NEEDED.
THE ESCP FACILITIES SHOWN ON THIS PLAN ARE THE MINIMUM REQUIREMENTS FOR ANTICIPATED SITE
CONDITIONS. DURING THE CONSTRUCTION PERIOD, THESE ESCP FACILITIES SHALL BE UPGRADED AS NEEDED
FOR UNEXPECTED STORM EVENTS AND MODIFIED TO ACCOUNT FOR CHANGING SITE CONDITIONS (E.G.
ADDITIONAL COVER MEASURES, RELOCATION OF SILT FENCES, INSTALLATION OF STRAW WATTLES FOR SLOPE
PROTECTION, TEMPORARY EROSION CONTROL MATS, ADDITIONAL PERIMETER PROTECTION ETC.).
THE ESCP FACILITIES SHALL BE INSPECTED DAILY BY THE ESCP INSPECTOR AND MAINTAINED TO ENSURE
CONTINUED PROPER FUNCTIONING. WRITTEN RECORDS SHALL BE KEPT OF WEEKLY REVIEWS OF THE ESCP
FACILITIES.
ANY AREAS OF EXPOSED SOILS, INCLUDING ROADWAY EMBANKMENTS, THAT WILL NOT BE DISTURBED FOR
TWO DAYS DURING THE WET SEASON OR SEVEN DAYS DURING THE DRY SEASON SHALL BE IMMEDIATELY
STABILIZED WITH THE APPROVED ESCP COVER METHODS (E.G., SEEDING, MULCHING, ETC.).
ANY AREA NEEDING ESCP MEASURES, NOT REQUIRING IMMEDIATE ATTENTION, SHALL BE ADDRESSED WITHIN
SEVEN (7) DAYS.
THE ESCP FACILITIES ON INACTIVE SITES SHALL BE INSPECTED AND MAINTAINED A MINIMUM OF ONCE A
MONTH OR WITHIN 24 HOURS FOLLOWING A STORM EVENT.
AT NO TIME SHALL SEDIMENT ACCUMULATE MORE THAN 1/3 OF THE ABOVE GROUND HIEGHT OF SILT FENCE
BE ALLOWED. SEDIMENT SHALL BE REMOVED FREQUENTLY AND REPLACED EVERY SIX (6) MONTHS IF EXPOSED
TO CLAYEY SOILS.
THE CONTRACTOR SHALL MAINTAIN A FULLY STOCKED SPILL KIT ON SITE AT ALL TIMES.
3. IMPERMEABLE BARRIER REQUIRED AT TOE OF STOCKPILE.
4. COVERING MAINTAINED TIGHTLY IN PLACE BY USING
SANDBAGS OR TIRES ON ROPES WITH A MAXIMUM 10' GRID
SPACING IN ALL DIRECTIONS.
5. NO STOCKPILING OF MATERIALS ALLOWED IN RIGHT-OF-WAY.
3
31
STOCKPILE COVER
NO SCALE
130 2ND AVENUE S.
EDMONDS, WASHINGTON 98020
(425) 778-0907, FAX (425) 778-6409
PUBLIC NOTICE
Application for Permit
Issue Date: June 15, 2016
Expiration Date: July 15, 2016
US Army Corps of Engineers No: NWP-2016-147
Oregon Department of State Lands No:58952
30-Day Notice
Interested parties are hereby notified the U.S. Army Corps of Engineers, Portland District
(Corps) has received an application for a Department of the Army permit for certain work in
waters of the United States, as described below and shown on the attached plans. The Corps
is soliciting comments on the proposed work.
Applicant:
Idaho Power Company
Attention: Bill Lynch
P.O. Box 70
Boise, ID 83707
Email:blynch@idahopower.com
Telephone: (208) 388-5490
Location: The project site is located at Farewell Bend State Park, 23751 Old Highway 30,
Huntington, Oregon. The site is in Section 33, Township 14 South, Range 45 East.
Latitude and Longitude: 44.3056 North, -117.2237 West
Waterway: The project is located in the Snake River (Brownlee Reservoir) at River Mile 333
and adjacent wetlands.
Project Purpose: The applicant's stated purpose is to stabilize the banks along Farewell Bend
State Park as directed by FERC.
Project Description: Installation of a vegetated riprap revetment is proposed along
approximately 3,000 linear feet of the waterway to prevent further erosion of the bank at
Farewell Bend State Park. Rock will be placed against the near 20-foot vertical bank to an
elevation of 2083 feet (NAVD88) and extended riverward at 3:1 slope until it meets with
existing ground. The proposed riprap would not extend into any wetlands, however a
temporary crossing will be constructed in "Wetland A", a small lacustrine wetland abutting the
reservoir. Construction access will avoid placement of gravel bedding directly on the wetland,
and matting will be used below gravel bedding. Work within Brownlee Reservoir will occur in
the dry during low pool depth elevations. A temporary access road will also be constructed
along the shoreline within the area of improvement. This will consist mainly of grading a path
in order to reach the extents of the project with construction materials and equipment. The
Corps No. NWP-2016-147
Page 1 of 6
temporary access road will be removed as work progresses. In total, the project would result
in the excavation of 6,110 cubic yards of material and placement of 7,860 cubic yards of
material within 1.37 acres of Brownlee Reservoir. In addition, 74 cubic yards of fill material
will be temporarily discharged into 0.03 acres of "Wetland A" for a period of 8 months or less.
Mitigation: The applicant did not propose compensatory mitigation in the permit application.
The Corps will determine the type and amount of compensatory mitigation necessary to offset
environmental losses from the proposed project.
Drawings: Thirty two (32) drawings are attached and labeled Corps No. NWP-2016-147.
Copies of this public notice, which have been mailed or otherwise physically distributed, feature
project drawings in black and white. The electronic version features those drawings in color,
which we think more accurately illustrates the proposed project. To access the electronic
version of this public notice, go to the Portland District website at
http://www.nwp.usace.army.mil/ and select Regulatory Branch Permit Information. At the
Regulatory page select Regulatory Public Notices.
Authority: The proposed project will be evaluated under the following:
Section 10, Rivers and Harbors Act 1899 (33 U.S.C. 403), for work in or affecting
navigable waters of the United States.
Section 404, Clean Water Act (33 U.S.C. 1344), for discharge of dredged or fill material
into waters of the United States.
Clean Water Act Section 404(b)(1) Guidelines: The described discharge will be evaluated
for compliance with guidelines promulgated by the U.S. Environmental Protection Agency
under authority of Section 404(b)(1) of the Clean Water Act. The 404(b)(1) Guidelines are the
substantive criteria used in evaluating discharges of dredged or fill material into waters of the
United States. Should a permit be issued, the Corps will evaluate the fill material source (i.e.,
borrow site) prior to the start of construction.
Water Quality Certification: Section 401 of the Clean Water Act (33 U.S.C. 1341) requires
applicants to obtain a water quality certification for proposed discharges into waters of the
United States. A permit for the described work will not be issued until certification has been
issued or is waived from the certifying state. Attached is the state's notice for a water quality
certification.
Endangered Species: Section 7 of the Endangered Species Act (ESA) (16 U.S.C 1536)
requires federal agencies to consult with the National Marine Fisheries Service (NMFS) and/or
U.S. Fish and Wildlife Service (USFWS) on all actions that may affect a species listed (or
proposed for listing) under the ESA as threatened or endangered or that may adversely modify
designated critical habitat. The Corps' preliminary review indicates the described activity will
not affect any endangered species or designated critical habitat. Consultation under Section 7
of the ESA is not required for the described activity. The Corps will make a final determination
on the need to consult after receipt of comments from this public notice including any comments
provided by the NMFS and/or USFWS.
Corps No. NWP-2016-147
Page 2 of 6
Essential Fish Habitat: Section 305(b)(2) of the Magnuson-Stevens Fishery Conservation
and Management Act (MSA) as amended (16 U.S.C 1855), requires Federal agencies to
consult with the NMFS on all actions, or proposed actions, permitted, funded, or undertaken by
the agency, that may adversely affect Essential Fish Habitat (EFH). The Corps' preliminary
review indicates the described activity would not adversely affect EFH at the project location or
in its vicinity. The Corps will make a final determination on the need to consult on EFH after
receipt of comments from this public notice including any comments provided by the NMFS.
Historic Properties/Cultural Resources: Section 106 of the National Historic Preservation
Act of 1966, as amended (16 U.S.C. 470), requires Federal agencies to consult with the
appropriate State and/or Tribal Historic Preservation Officer to take into account the effects of
actions they undertake or permit on historic properties listed in or eligible for listing in the
National Register of Historic Places.
This notice has been provided to the State Historic Preservation Office (SHPO), interested
Native American Indian Tribes, and other interested parties. If you have information pertaining
to cultural resources within the permit area, please provide this information to the Corps' project
manager identified at the end of this notice to assist in a complete evaluation of potential
effects.
State and Local Authorizations: The applicant has or will be applying for the following
additional governmental authorizations for the project:
State removal/fill permit (ODSL)
401 Water quality Cert (ODEQ)
Public Hearing: Any person may request in writing within the comment period specified in this
notice that a public hearing be held to consider this application. Requests for public hearings
shall state with particularity the reasons for holding a public hearing.
Evaluation: The decision whether to issue a permit will be based on an evaluation of the
probable impact, including cumulative impacts, of the described activity on the public interest.
That decision will reflect the national concern for both protection and utilization of important
resources. The benefit, which reasonably may be expected to accrue from the described
activity, must be balanced against its reasonably foreseeable detriments. All factors, which
may be relevant to the described activity will be considered including the cumulative effects
thereof; among those are conservation, economics, aesthetics, general environmental
concerns, wetlands, historic properties, fish and wildlife values, flood hazards, floodplain
values, land use, navigation, shoreline erosion and accretion, recreation, water supply and
conservation, water quality, energy needs, safety, food and fiber production, mineral needs,
consideration of property ownership and, in general, the needs and welfare of the people.
The Corps is soliciting comments from the public; Federal, state, and local agencies and
officials; Indian Tribes; and other interested parties in order to consider and evaluate the
impacts of the proposed project. Comments received will be considered by the Corps to
determine whether to issue, modify, condition or deny a permit for this proposal. Comments
are used in the preparation of an Environmental Assessment and/or an Environmental Impact
Statement pursuant to the National Environmental Policy Act. Comments are also used to
determine the need for a public hearing.
Corps No. NWP-2016-147
Page 3 of 6
Submitting Comments: Interested parties are invited to provide comments on the proposed
project. Comments may be submitted by conventional mail or email. All comments received
will be considered in determining whether authorizing the work would be contrary to the public
interest.
Either conventional mail or e-mail comments must include the Corps reference number as
shown on page 1 and include the commenter's name and address. In order to be accepted, email comments must originate from the author's e-mail account and must include on the subject
line of the e-mail message the Corps reference number. All comments received will become
part of the administrative record and are subject to public release under the Freedom of
Information Act including any personally identifiable information such as names, phone
numbers, and addresses.
Additional information about the proposed project may be obtained from the Corps Project
Manager listed below. All comments, whether by conventional mail or email, must be received
no later than the expiration date of this public notice to ensure consideration. Comments should
be submitted to the following mailing address or email address:
U.S. Army Corps of Engineers
Peter Olmstead
La Grande Field Office
3502 Highway 30
La Grande, Oregon 97850-5628
Email: peter.d.olmstead@usace.army.mil
Telephone: (541) 962-0401
Corps No. NWP-2016-147
Page 4 of 6
PUBLIC NOTICE
Oregon Department of Environmental Quality (DEQ)
Water Quality 401 Certification
Notice Issued: June 15, 2016
Written Comments Due: July 15, 2016
Corps of Engineers No: NWP-2016-147
Oregon Department of State Lands No: 58952
WHO IS THE APPLICANT: Idaho Power Company
LOCATION OF CERTIFICATION ACTIVITY: See attached U.S. Army Corps of Engineers
public notice.
WHAT IS PROPOSED: See attached U.S. Army Corps of Engineers public notice on the
proposed project.
NEED FOR CERTIFICATION: Section 401 of the Federal Clean Water Act requires applicants
for Federal permits or licenses to provide the Federal agency a water quality certification from
the State of Oregon if the proposed activity may result in a discharge to waters of the state.
DESCRIPTION OF DISCHARGES: See attached U.S. Army Corps of Engineers public notice
on the proposed project.
WHERE TO FIND DOCUMENTS: Documents and materials related to water quality issues as
a result of the proposal are available for examination and copying at Oregon Department of
Environmental Quality, 401 Water Quality Certification Coordinator, Northwest Region,
700 NE Multnomah Street, Suite 600, Portland, Oregon 97232. Other project materials are
available by contacting the Corps per the attached public notice.
Scheduling an appointment will ensure that water quality documents are readily accessible
during your visit. To schedule an appointment please call DEQ Water Quality at Northwest
Region at (503) 229-5263.
Any questions on the water quality certification process may be addressed to the 401 Program
Coordinator at (503) 229-6030 or toll free within Oregon at (800) 452-4011. People with
hearing impairments may call the Oregon Telecommunications Relay Service at 1-800-7352900.
Corps No. NWP-2016-147
Page 5 of 6
PUBLIC PARTICIPATION:
Public Hearing: Oregon Administrative Rule (OAR) 340-48-0032 (2) states that "The Corps
provides public notice of and opportunity to comment on the applications, including the
application for certification, provided that the department (DEQ), in its discretion, may provide
additional opportunity for public comment, including public hearing."
Written comments:
Written comments on project elements related to water quality must be received at the Oregon
Department of Environmental Quality by 5 p.m. on the date specified in the upper right section
on page one of this notice. Written comments may be emailed, mailed or faxed as described
below:
Email - 401publiccomments@deq.state.or.us
Mail - Oregon Department of Environmental Quality, Northwest Region
700 NE Multnomah Street, Suite 600
Portland, Oregon 97232
Attn: 401 Water Quality Certification Coordinator
Fax - (503) 229-6957
WHAT HAPPENS NEXT: DEQ will review and consider all comments received during the
public comment period. Following this review, certification of the proposal may be issued as
proposed, issued with conditions, or denied. You will be notified of DEQ's final decision if you
submit comments during the comment period. Otherwise, if you wish to receive notification,
please call or write DEQ at the above address.
ACCESSIBILITY INFORMATION: This publication is available in alternate format (e.g. large
print, Braille) upon request. Please contact DEQ Office of Communications and Outreach at
(503) 229-5317 or toll free within Oregon at 1-800-452-4011 to request an alternate format.
People with a hearing impairment can receive help by calling the Oregon Telecommunications
Relay Service at 1-800-735-2900.
Corps No. NWP-2016-147
Page 6 of 6