Home

Galveston District

Run scraper

Magellan Terminal Holdings

Basic information

Fill out these two fields at minimum.

— or —

How Big?

Where?

Links to source documents

Raw text

You can copy from here when filling out the rest of the page.

The applicant proposes to construct a 95-acre crude and hydrocarbon bulk storage terminal and ship docking facility.

Full Public Notice Project Plans Alternatives Analysis PROJECT DESCRIPTION: The applicant proposes to construct a 95-acre crude and hydrocarbon bulk storage terminal and ship docking facility along the Corpus Christi Ship Channel (CCSC). The project will consist of: 1) An approximate 4,500-foot-long by 500-foot-wide by -52-foot-deep (or 44.11 acres) ship berthing area: a. 1,893,600 cubic yards total dredging via mechanical and/or hydraulic in the ship channel, wetlands, oyster bed, and uplands; b. Dredge depth of -50 feet mean low tide plus -2 feet allowable overdredge totaling -52 feet; 3-year maintenance dredging plan; c. 1/3 of the material is proposed to be used onsite as beneficial use; 2/3 is proposed to be placed in Dredged Maintenance Placement Areas (DMPA); d. Place the dredged material into one or more of the following DMPA: IH-PA8 (Suntide DMPA), IH-PA 4 (DMPA #4), IH-PA 5 (DMPA #5), IH-PA 3 Cell A and Cell B (South Shore Cells A & B DMPA), IH-PA 1 (DMPA #1), IH-PA 2 (Herbie Maurer DMPA), or IH-PA 6 (Tule Lake DMPA Cells A, B, or C); 2) Four 100-foot by 60-foot concrete platforms and support piers with four 20-foot by 67-foot pipe and approach trestles and support piers connecting the docks to land which will be outfitted with pipe racks, marine loading arms, and docking fenders; 3) 4,500 linear feet of bulk-heading and shoreline protection; 4) Four ship berths with 96-inch-diameter breasting and mooring dolphins; 5) Twenty-seven bulk storage tanks totaling approximately eight million barrels of capacity along with associated piping: a. Twenty 350,000 barrel bulk storage tanks; b. Seven 135,000 barrel bulk storage tanks; 6) Project site will be brought up to 12 feet above mean sea level: Approximately 56.31 acres (or 543,050 cubic yards) of wetlands that will be filled/graded; 7) Pipe racks, manifolds, federally mandated containment structures, roads, and other infrastructure; 8) Two 54-foot by 40-foot 15,704 barrel fire suppression water tanks; 9) Sub-grade storm water system including a 6 feet deep storm water retention pond.

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas