You can copy from here when filling out the rest of the page.
Danielle Erb is the Regulatory point-of-contact for this permit application from Warrenton Fiber Company to conduct work impacting the Columbia River at River Mile 10.2, in Warrenton, Oregon.
PUBLIC NOTICE
Application for Permit
Issue Date: June 21, 2016
Expiration Date: July 6, 2016
US Army Corps of Engineers No: NWP-2007-729-2
15-Day Notice Oregon Department of State Lands No: 39360-RG
Interested parties are hereby notified the U.S. Army Corps of Engineers, Portland District (Corps) has received an application for a Department of the Armypermit for certain work in waters of the United States, as described below and shown on the attached plans. The Corps is soliciting comments on the proposedwork.
Applicant: Warrenton Fiber Company
Attn: Stephen C. Fulton
PO Box 100
Warrenton, OR 97146
Email: scf@pacifier.com
Telephone: (503) 861-3305
Applicant’s Agent: Mike Coenen
15575 SW Sequoia Parkway, Suite 100
Portland, OR 97224
Email: mcoenen@geodesign.com
Telephone: (503) 968-8787
Location: In the Columbia River at the Tansy Point Chip Dock, Warrenton, Clatsop County, Oregon (46.190297, -123.923387)
Waterway: Columbia River at River Mile 10.2
Project Purpose: The applicant’s stated purpose is to allow continued safe access by barge to the Warrenton Fiber Company Tansy Point chip loading dock.
Original Project Description: Warrenton Fiber produces wood chips on this property at Tansy Point and ships the chips to its customers (upriver pulp mills)by barge. Warrenton Fiber proposes to remove 2,000 cubic yards of accumulated sand and silt from beneath their chip loading dock. They expect they will needto do the work once within the 5-year life of the permit. They propose to remove the material with a shell dredge. The project is being reviewed under theSediment Evaluation Framework to determine suitability of in-water disposal. If allowed, the material will be deposited at a designated in-water disposalsite. If the dredged material is determined to not be suitable for in-water disposal, it would be placed on an adjacent barge for dewatering, and transportedvia barge and truck to a confined upland disposal site (see attached location map). Dredging would take place during the in-water work window of November 1to February 28.
Revised Project Description: Warrenton Fiber produces wood chips on this property at Tansy Point and ships the chips to its customers (upriver pulp mills) bybarge. Warrenton Fiber proposes to remove approximately 10,000 cubic yards of accumulated sand and silt from their barge loading dock slip over the life ofthe permit. The proposed dredge depth is -15 feet (MLLW) and the dredge equipment would include a mechanical clamshell or hydraulic dredge and/ or dragline.Warrenton Fiber may dredge several times throughout the duration of the 5 year permit. The material will be deposited at a designated in-water disposal site.Dredging would take place during the in-water work window of November 1 to February 28.
Dredged Material Testing: Project sediments were evaluated in accordance with the Sediment Evaluation Framework for the Pacific Northwest (SEF). Theinteragency Portland Sediment Evaluation Team (PSET) implements the SEF for the Corps Portland District. For this project, the PSET has determined thatsediments in the project area are suitable for unconfined, aquatic disposal and exposure.
Dredged material found suitable for unconfined, aquatic disposal would be disposed at a Corps approved location.
The proposed project includes future maintenance dredging. Prior to each maintenance dredging cycle the applicant would be required to coordinate with theCorps and the PSET to determine if additional sediment testing is required.
Mitigation: The applicant states that the project activity will take place at an area previously dredged and compensatory mitigation is not proposed. If apermit is issued, the Corps will determine what is appropriate and practicable compensatory mitigation. The amount of compensatory mitigation required shallbe commensurate with the anticipated impacts of the project.
Drawings: Four (4) drawings are attached and labeled Corps No. NWP-2007-729-2
Authority: The proposed project will be evaluated under the following:
Section 10, Rivers and Harbors Act 1899 (33 U.S.C. 403), for work in or affecting navigable waters of the United States.
Section 404, Clean Water Act (33 U.S.C. 1344), for discharge of dredged or fill material into waters of the United States.
Clean Water Act Section 404(b)(1) Guidelines: The described discharge will be evaluated for compliance with guidelines promulgated by the U.S. EnvironmentalProtection Agency under authority of Section 404(b)(1) of the Clean Water Act. The 404(b)(1) Guidelines are the substantive criteria used in evaluatingdischarges of dredged or fill material into waters of the United States. The source of the fill material would be from the Warrenton Fiber Mills loadingslip.
Water Quality Certification: Section 401 of the Clean Water Act (33 U.S.C. 1341) requires applicants to obtain a water quality certification for proposeddischarges into waters of the United States. A permit for the described work will not be issued until certification has been issued or is waived from thecertifying state.
Coastal Zone Management: Section 307(c) of the Coastal Zone Management Act of 1972, as amended (16 U.S.C. 1456(c), requires non-Federal applicants seeking afederal license or permit to conduct any activity occurring in or affecting the coastal zone to obtain a Consistency Certification which indicates theactivity conforms with the State’s Coastal Zone Management Program. The applicant believes the proposed project would comply with and be conducted in amanner consistent with the Oregon Ocean and Coastal Management Program.
Endangered Species: Section 7 of the Endangered Species Act (ESA) (16 U.S.C 1536) requires federal agencies to consult with the National Marine FisheriesService (NMFS) and/or U.S. Fish and Wildlife Service (USFWS) on all actions that may affect a species listed (or proposed for listing) under the ESA asthreatened or endangered or that may adversely modify designated critical habitat. The Corps’ preliminary review indicates the described activity may affectan endangered or threatened species or designated critical habitat. The Corps will initiate consultation under Section 7 of the ESA. The Corps will completethe required consultation prior to finalizing a permit decision.
Essential Fish Habitat: Section 305(b)(2) of the Magnuson-Stevens Fishery Conservation and Management Act (MSA) as amended (16 U.S.C 1855), requires Federalagencies to consult with the NMFS on all actions, or proposed actions, permitted, funded, or undertaken by the agency, that may adversely affect EssentialFish Habitat (EFH). The Corps’ preliminary review indicates the described activity would not adversely affect EFH at the project location or in its vicinity.The Corps will make a final determination on the need to consult on EFH after receipt of comments from this public notice including any comments provided bythe NMFS.
Historic Properties/Cultural Resources: Section 106 of the National Historic Preservation Act of 1966, as amended (16 U.S.C. 470), requires Federal agenciesto consult with the appropriate State and/or Tribal Historic Preservation Officer to take into account the effects of actions they undertake or permit onhistoric properties listed in or eligible for listing in the National Register of Historic Places. The Corps’ preliminary review indicates to the best of ourknowledge, the described activity is not located on property registered or eligible for registration in the latest published version of the National Registerof Historic Places. At this time the Corps is unaware of any cultural resource surveys of the project area.
This notice has been provided to the State Historic Preservation Office (SHPO), interested Native American Indian Tribes, and other interested parties. Ifyou have information pertaining to cultural resources within the permit area, please provide this information to the Corps’ project manager identified at theend of this notice to assist in a complete evaluation of potential effects.
Public Hearing: Any person may request in writing within the comment period specified in this notice that a public hearing be held to consider thisapplication. Requests for public hearings shall state with particularity the reasons for holding a public hearing.
Evaluation: The decision whether to issue a permit will be based on an evaluation of the probable impact, including cumulative impacts, of the describedactivity on the public interest. That decision will reflect the national concern for both protection and utilization of important resources. The benefit,which reasonably may be expected to accrue from the described activity, must be balanced against its reasonably foreseeable detriments. All factors, whichmay be relevant to the described activity will be considered including the cumulative effects thereof; among those are conservation, economics, aesthetics,general environmental concerns, wetlands, historic properties, fish and wildlife values, flood hazards, floodplain values, land use, navigation, shorelineerosion and accretion, recreation, water supply and conservation, water quality, energy needs, safety, food and fiber production, mineral needs,consideration of property ownership and, in general, the needs and welfare of the people.
The Corps is soliciting comments from the public; Federal, state, and local agencies and officials; Indian Tribes; and other interested parties in order toconsider and evaluate the impacts of the proposed project. Comments received will be considered by the Corps to determine whether to issue, modify, conditionor deny a permit for this proposal. Comments are used in the preparation of an Environmental Assessment and/or an Environmental Impact Statement pursuant tothe National Environmental Policy Act. Comments are also used to determine the need for a public hearing.
Submitting Comments: Interested parties are invited to provide comments on the proposed project. Comments may be submitted by conventional mail or email. Allcomments received will be considered in determining whether authorizing the work would be contrary to the public interest.
Either conventional mail or e-mail comments must include the Corps reference number as shown on page 1 and include the commenter’s name and address. In orderto be accepted, e-mail comments must originate from the author’s e-mail account and must include on the subject line of the e-mail message the Corpsreference number. All comments received will become part of the administrative record and are subject to public release under the Freedom of Information Actincluding any personally identifiable information such as names, phone numbers, and addresses.
Additional information about the proposed project may be obtained from the Corps Project Manager listed below. All comments, whether by conventional mail oremail, must be received no later than the expiration date of this public notice to ensure consideration. Comments should be submitted to the followingmailing address or email address:
U.S. Army Corps of Engineers
Regulatory Branch
Ms. Danielle Erb
P.O. 2946
Portland, Oregon 97208-2946
Email: Danielle.H.Erb@usace.army.mil
Telephone: (503) 808-4368
PUBLIC NOTICE
Oregon Department of Environmental Quality (DEQ)
Water Quality 401 Certification
Notice Issued: June 21, 2016
Written Comments Due: July 6, 2016
Corps of Engineers No: NWP-2007-729-2
Oregon Department of State Lands No: 39360-RG
WHO IS THE APPLICANT: Warrenton Fiber Company
LOCATION OF CERTIFICATION ACTIVITY: See attached U.S. Army Corps of Engineers public notice.
WHAT IS PROPOSED: See attached U.S. Army Corps of Engineers public notice on the proposed project.
NEED FOR CERTIFICATION: Section 401 of the Federal Clean Water Act requires applicants for Federal permits or licenses to provide the Federal agency a waterquality certification from the State of Oregon if the proposed activity may result in a discharge to waters of the state.
DESCRIPTION OF DISCHARGES: See attached U.S. Army Corps of Engineers public notice on the proposed project.
WHERE TO FIND DOCUMENTS: Documents and materials related to water quality issues as a result of the proposal are available for examination and copying atOregon Department of Environmental Quality, 401 Water Quality Certification Coordinator, Northwest Region,700 NE Multnomah Street, Suite 600, Portland, Oregon 97232. Other project materials are available by contacting the Corps per the attached public notice.
Scheduling an appointment will ensure that water quality documents are readily accessible during your visit. To schedule an appointment please call DEQ WaterQuality at Northwest Region at (503) 229-5263.
Any questions on the water quality certification process may be addressed to the 401 Program Coordinator at (503) 229-6030 or toll free within Oregon at(800) 452-4011. People with hearing impairments may call the Oregon Telecommunications Relay Service at 1-800-735-2900.
PUBLIC PARTICIPATION:
Public Hearing: Oregon Administrative Rule (OAR) 340-48-0032 (2) states that “The Corps provides public notice of and opportunity to comment on theapplications, including the application for certification, provided that the department (DEQ), in its discretion, may provide additional opportunity forpublic comment, including public hearing.”
Written comments: Written comments on project elements related to water quality must be received at the Oregon Department of Environmental Quality by 5 p.m.on the date specified in the upper right section on page one of this notice. Written comments may be emailed, mailed or faxed as described below:
Email - 401publiccomments@deq.state.or.us
Mail - Oregon Department of Environmental Quality, Northwest Region
700 NE Multnomah Street, Suite 600
Portland, Oregon 97232
Attn: 401 Water Quality Certification Coordinator
Fax - (503) 229-6957
WHAT HAPPENS NEXT: DEQ will review and consider all comments received during the public comment period. Following this review, certification of the proposalmay be issued as proposed, issued with conditions, or denied. You will be notified of DEQ's final decision if you submit comments during the comment period.Otherwise, if you wish to receive notification, please call or write DEQ at the above address.
ACCESSIBILITY INFORMATION: This publication is available in alternate format (e.g. large print, Braille) upon request. Please contact DEQ Office ofCommunications and Outreach at (503) 229-5317 or toll free within Oregon at 1-800-452-4011 to request an alternate format. People with a hearing impairmentcan receive help by calling the Oregon Telecommunications Relay Service at 1-800-735-2900.
PUBLIC NOTICE
OREGON OCEAN AND COASTAL MANAGEMENT PROGRAM
CONSISTENCY CERTIFICATION
Date: June 21, 2016
U.S. Army Corps of Engineers No: Corps No. NWP-2007-729-2
Oregon Department of State Lands No: 39360-RG
NOTIFICATION: For projects subject to coastal zone review, notice is hereby given that the project is being reviewed by the Department of Land Conservationand Development (DLCD) as provided in Section 307(c) of the Coastal Zone Management Act. The applicant believes that the activities described in the attachedmaterials would comply with and be conducted in a manner consistent with the Oregon Ocean and Coastal Management Program. Project information can be madeavailable for inspection at DLCD's Salem office.
DLCD is hereby soliciting public comments on the proposed project's consistency with the Oregon Coastal Management Program. Written comments may be submittedto DLCD, 635 Capital Street NE, Suite 150, Salem, Oregon 97301-2540. Comments may also be sent by fax to (503) 378-6033 or by email tocoast.permits@state.or.us. All comments must be received by DLCD on or before the comment deadline listed in the accompanying Corps of Engineers’ PublicNotice Application for Permit. For further information, you may call DLCD at (503) 373-0050.
REVIEW CRITERIA: Comments should address consistency with the applicable enforceable policies of the Oregon Coastal Management Program. These enforceablepolicies are found in the following:
• Acknowledged Local Comprehensive Plans & Implementing Ordinances
• Statewide Planning Goals
• Applicable State Authorities incorporated into the Oregon Coastal Management Program (e.g. Removal-Fill Law, Water Quality Standards, Beach Bill, etc.) asapplicable.
A list of specific enforceable policies can be found at the following link:
http://www.oregon.gov/LCD/OCMP/Pages/OCMP_Enforceable-Policies.aspx
INCONSISTENT?
If you believe this project is inconsistent with the Oregon Coastal Management Program, your comments to DLCD should explain why you believe the project isinconsistent and should identify the Oregon Coastal Management Program element(s) in question. You should also describe how the project could be modified, ifpossible, to make it consistent with the Oregon Coastal Management Program.
PUBLIC NOTICE
Application for Permit
15-Day Notice
Issue Date: June 21, 2016
Expiration Date: July 6, 2016
US Army Corps of Engineers No: NWP-2007-729-2
Oregon Department of State Lands No: 39360-RG
Interested parties are hereby notified the U.S. Army Corps of Engineers, Portland District
(Corps) has received an application for a Department of the Army permit for certain work in
waters of the United States, as described below and shown on the attached plans. The Corps
is soliciting comments on the proposed work.
Applicant:
Warrenton Fiber Company
Attn: Stephen C. Fulton
PO Box 100
Warrenton, OR 97146
Email: scf@pacifier.com
Telephone: (503) 861-3305
Applicant's Agent: Mike Coenen
15575 SW Sequoia Parkway, Suite 100
Portland, OR 97224
Email: mcoenen@geodesign.com
Telephone: (503) 968-8787
Location: In the Columbia River at the Tansy Point Chip Dock, Warrenton, Clatsop County,
Oregon (46.190297, -123.923387)
Waterway: Columbia River at River Mile 10.2
Project Purpose: The applicant's stated purpose is to allow continued safe access by barge
to the Warrenton Fiber Company Tansy Point chip loading dock.
Original Project Description: Warrenton Fiber produces wood chips on this property at Tansy
Point and ships the chips to its customers (upriver pulp mills) by barge. Warrenton Fiber
proposes to remove 2,000 cubic yards of accumulated sand and silt from beneath their chip
loading dock. They expect they will need to do the work once within the 5-year life of the permit.
They propose to remove the material with a shell dredge. The project is being reviewed under
the Sediment Evaluation Framework to determine suitability of in-water disposal. If allowed,
the material will be deposited at a designated in-water disposal site. If the dredged material is
determined to not be suitable for in-water disposal, it would be placed on an adjacent barge for
dewatering, and transported via barge and truck to a confined upland disposal site (see
attached location map). Dredging would take place during the in-water work window of
November 1 to February 28.
Revised Project Description: Warrenton Fiber produces wood chips on this property at
Tansy Point and ships the chips to its customers (upriver pulp mills) by barge. Warrenton Fiber
proposes to remove approximately 10,000 cubic yards of accumulated sand and silt from their
barge loading dock slip over the life of the permit. The proposed dredge depth is -15 feet
(MLLW) and the dredge equipment would include a mechanical clamshell or hydraulic dredge
and/ or dragline. Warrenton Fiber may dredge several times throughout the duration of the 5
year permit. The material will be deposited at a designated in-water disposal site. Dredging
would take place during the in-water work window of November 1 to February 28.
Dredged Material Testing: Project sediments were evaluated in accordance with the
Sediment Evaluation Framework for the Pacific Northwest (SEF). The interagency Portland
Sediment Evaluation Team (PSET) implements the SEF for the Corps Portland District. For
this project, the PSET has determined that sediments in the project area are suitable for
unconfined, aquatic disposal and exposure.
Dredged material found suitable for unconfined, aquatic disposal would be disposed at a
Corps approved location.
The proposed project includes future maintenance dredging. Prior to each maintenance
dredging cycle the applicant would be required to coordinate with the Corps and the PSET to
determine if additional sediment testing is required.
Mitigation: The applicant states that the project activity will take place at an area previously
dredged and compensatory mitigation is not proposed. If a permit is issued, the Corps will
determine what is appropriate and practicable compensatory mitigation. The amount of
compensatory mitigation required shall be commensurate with the anticipated impacts of the
project.
Drawings: Four (4) drawings are attached and labeled Corps No. NWP-2007-729-2
Authority: The proposed project will be evaluated under the following:
Section 10, Rivers and Harbors Act 1899 (33 U.S.C. 403), for work in or affecting
navigable waters of the United States.
Section 404, Clean Water Act (33 U.S.C. 1344), for discharge of dredged or fill material
into waters of the United States.
Clean Water Act Section 404(b)(1) Guidelines: The described discharge will be evaluated
for compliance with guidelines promulgated by the U.S. Environmental Protection Agency
under authority of Section 404(b)(1) of the Clean Water Act. The 404(b)(1) Guidelines are the
substantive criteria used in evaluating discharges of dredged or fill material into waters of the
United States. The source of the fill material would be from the Warrenton Fiber Mills loading
slip.
Corps No. NWP-2007-729-2
Page 2 of 7
Water Quality Certification: Section 401 of the Clean Water Act (33 U.S.C. 1341) requires
applicants to obtain a water quality certification for proposed discharges into waters of the
United States. A permit for the described work will not be issued until certification has been
issued or is waived from the certifying state.
Coastal Zone Management: Section 307(c) of the Coastal Zone Management Act of 1972, as
amended (16 U.S.C. 1456(c), requires non-Federal applicants seeking a federal license or
permit to conduct any activity occurring in or affecting the coastal zone to obtain a Consistency
Certification which indicates the activity conforms with the State's Coastal Zone Management
Program. The applicant believes the proposed project would comply with and be conducted in
a manner consistent with the Oregon Ocean and Coastal Management Program.
Endangered Species: Section 7 of the Endangered Species Act (ESA) (16 U.S.C 1536)
requires federal agencies to consult with the National Marine Fisheries Service (NMFS) and/or
U.S. Fish and Wildlife Service (USFWS) on all actions that may affect a species listed (or
proposed for listing) under the ESA as threatened or endangered or that may adversely modify
designated critical habitat. The Corps' preliminary review indicates the described activity may
affect an endangered or threatened species or designated critical habitat. The Corps will
initiate consultation under Section 7 of the ESA. The Corps will complete the required
consultation prior to finalizing a permit decision.
Essential Fish Habitat: Section 305(b)(2) of the Magnuson-Stevens Fishery Conservation
and Management Act (MSA) as amended (16 U.S.C 1855), requires Federal agencies to
consult with the NMFS on all actions, or proposed actions, permitted, funded, or undertaken by
the agency, that may adversely affect Essential Fish Habitat (EFH). The Corps' preliminary
review indicates the described activity would not adversely affect EFH at the project location or
in its vicinity. The Corps will make a final determination on the need to consult on EFH after
receipt of comments from this public notice including any comments provided by the NMFS.
Historic Properties/Cultural Resources: Section 106 of the National Historic Preservation
Act of 1966, as amended (16 U.S.C. 470), requires Federal agencies to consult with the
appropriate State and/or Tribal Historic Preservation Officer to take into account the effects of
actions they undertake or permit on historic properties listed in or eligible for listing in the
National Register of Historic Places. The Corps' preliminary review indicates to the best of our
knowledge, the described activity is not located on property registered or eligible for registration
in the latest published version of the National Register of Historic Places. At this time the Corps
is unaware of any cultural resource surveys of the project area.
This notice has been provided to the State Historic Preservation Office (SHPO), interested
Native American Indian Tribes, and other interested parties. If you have information pertaining
to cultural resources within the permit area, please provide this information to the Corps' project
manager identified at the end of this notice to assist in a complete evaluation of potential
effects.
Public Hearing: Any person may request in writing within the comment period specified in this
notice that a public hearing be held to consider this application. Requests for public hearings
shall state with particularity the reasons for holding a public hearing.
Corps No. NWP-2007-729-2
Page 3 of 7
Evaluation: The decision whether to issue a permit will be based on an evaluation of the
probable impact, including cumulative impacts, of the described activity on the public interest.
That decision will reflect the national concern for both protection and utilization of important
resources. The benefit, which reasonably may be expected to accrue from the described
activity, must be balanced against its reasonably foreseeable detriments. All factors, which
may be relevant to the described activity will be considered including the cumulative effects
thereof; among those are conservation, economics, aesthetics, general environmental
concerns, wetlands, historic properties, fish and wildlife values, flood hazards, floodplain
values, land use, navigation, shoreline erosion and accretion, recreation, water supply and
conservation, water quality, energy needs, safety, food and fiber production, mineral needs,
consideration of property ownership and, in general, the needs and welfare of the people.
The Corps is soliciting comments from the public; Federal, state, and local agencies and
officials; Indian Tribes; and other interested parties in order to consider and evaluate the
impacts of the proposed project. Comments received will be considered by the Corps to
determine whether to issue, modify, condition or deny a permit for this proposal. Comments
are used in the preparation of an Environmental Assessment and/or an Environmental Impact
Statement pursuant to the National Environmental Policy Act. Comments are also used to
determine the need for a public hearing.
Submitting Comments: Interested parties are invited to provide comments on the proposed
project. Comments may be submitted by conventional mail or email. All comments received
will be considered in determining whether authorizing the work would be contrary to the public
interest.
Either conventional mail or e-mail comments must include the Corps reference number as
shown on page 1 and include the commenter's name and address. In order to be accepted, email comments must originate from the author's e-mail account and must include on the subject
line of the e-mail message the Corps reference number. All comments received will become
part of the administrative record and are subject to public release under the Freedom of
Information Act including any personally identifiable information such as names, phone
numbers, and addresses.
Additional information about the proposed project may be obtained from the Corps Project
Manager listed below. All comments, whether by conventional mail or email, must be received
no later than the expiration date of this public notice to ensure consideration. Comments should
be submitted to the following mailing address or email address:
U.S. Army Corps of Engineers
Regulatory Branch
Ms. Danielle Erb
P.O. 2946
Portland, Oregon 97208-2946
Email: Danielle.H.Erb@usace.army.mil
Telephone: (503) 808-4368
Corps No. NWP-2007-729-2
Page 4 of 7
PUBLIC NOTICE
Oregon Department of Environmental Quality (DEQ)
Water Quality 401 Certification
Notice Issued: June 21, 2016
Written Comments Due: July 6, 2016
Corps of Engineers No: NWP-2007-729-2
Oregon Department of State Lands No: 39360-RG
WHO IS THE APPLICANT: Warrenton Fiber Company
LOCATION OF CERTIFICATION ACTIVITY: See attached U.S. Army Corps of Engineers
public notice.
WHAT IS PROPOSED: See attached U.S. Army Corps of Engineers public notice on the
proposed project.
NEED FOR CERTIFICATION: Section 401 of the Federal Clean Water Act requires applicants
for Federal permits or licenses to provide the Federal agency a water quality certification from
the State of Oregon if the proposed activity may result in a discharge to waters of the state.
DESCRIPTION OF DISCHARGES: See attached U.S. Army Corps of Engineers public notice
on the proposed project.
WHERE TO FIND DOCUMENTS: Documents and materials related to water quality issues as
a result of the proposal are available for examination and copying at Oregon Department of
Environmental Quality, 401 Water Quality Certification Coordinator, Northwest Region,
700 NE Multnomah Street, Suite 600, Portland, Oregon 97232. Other project materials are
available by contacting the Corps per the attached public notice.
Scheduling an appointment will ensure that water quality documents are readily accessible
during your visit. To schedule an appointment please call DEQ Water Quality at Northwest
Region at (503) 229-5263.
Any questions on the water quality certification process may be addressed to the 401 Program
Coordinator at (503) 229-6030 or toll free within Oregon at (800) 452-4011. People with
hearing impairments may call the Oregon Telecommunications Relay Service at 1-800-7352900.
Corps No. NWP-2007-729-2
Page 5 of 7
PUBLIC PARTICIPATION:
Public Hearing: Oregon Administrative Rule (OAR) 340-48-0032 (2) states that "The Corps
provides public notice of and opportunity to comment on the applications, including the
application for certification, provided that the department (DEQ), in its discretion, may provide
additional opportunity for public comment, including public hearing."
Written comments:
Written comments on project elements related to water quality must be received at the Oregon
Department of Environmental Quality by 5 p.m. on the date specified in the upper right section
on page one of this notice. Written comments may be emailed, mailed or faxed as described
below:
Email - 401publiccomments@deq.state.or.us
Mail - Oregon Department of Environmental Quality, Northwest Region
700 NE Multnomah Street, Suite 600
Portland, Oregon 97232
Attn: 401 Water Quality Certification Coordinator
Fax - (503) 229-6957
WHAT HAPPENS NEXT: DEQ will review and consider all comments received during the
public comment period. Following this review, certification of the proposal may be issued as
proposed, issued with conditions, or denied. You will be notified of DEQ's final decision if you
submit comments during the comment period. Otherwise, if you wish to receive notification,
please call or write DEQ at the above address.
ACCESSIBILITY INFORMATION: This publication is available in alternate format (e.g. large
print, Braille) upon request. Please contact DEQ Office of Communications and Outreach at
(503) 229-5317 or toll free within Oregon at 1-800-452-4011 to request an alternate format.
People with a hearing impairment can receive help by calling the Oregon Telecommunications
Relay Service at 1-800-735-2900.
Corps No. NWP-2007-729-2
Page 6 of 7
PUBLIC NOTICE
OREGON OCEAN AND COASTAL MANAGEMENT PROGRAM
CONSISTENCY CERTIFICATION
Date: June 21, 2016
U.S. Army Corps of Engineers No: Corps No. NWP-2007-729-2
Oregon Department of State Lands No: 39360-RG
NOTIFICATION:
For projects subject to coastal zone review, notice is hereby given that the project is being
reviewed by the Department of Land Conservation and Development (DLCD) as provided in
Section 307(c) of the Coastal Zone Management Act. The applicant believes that the activities
described in the attached materials would comply with and be conducted in a manner
consistent with the Oregon Ocean and Coastal Management Program. Project information can
be made available for inspection at DLCD's Salem office.
DLCD is hereby soliciting public comments on the proposed project's consistency with the
Oregon Coastal Management Program. Written comments may be submitted to DLCD, 635
Capital Street NE, Suite 150, Salem, Oregon 97301-2540. Comments may also be sent by fax
to (503) 378-6033 or by email to coast.permits@state.or.us. All comments must be received
by DLCD on or before the comment deadline listed in the accompanying Corps of Engineers'
Public Notice Application for Permit. For further information, you may call DLCD at (503) 3730050.
REVIEW CRITERIA:
Comments should address consistency with the applicable enforceable policies of the
Oregon Coastal Management Program. These enforceable policies are found in the following:
Acknowledged Local Comprehensive Plans & Implementing Ordinances
Statewide Planning Goals
Applicable State Authorities incorporated into the Oregon Coastal Management
Program (e.g. Removal-Fill Law, Water Quality Standards, Beach Bill, etc.) as
applicable.
A list of specific enforceable policies can be found at the following link:
http://www.oregon.gov/LCD/OCMP/Pages/OCMP_Enforceable-Policies.aspx
INCONSISTENT?
If you believe this project is inconsistent with the Oregon Coastal Management Program, your
comments to DLCD should explain why you believe the project is inconsistent and should
identify the Oregon Coastal Management Program element(s) in question. You should also
describe how the project could be modified, if possible, to make it consistent with the Oregon
Coastal Management Program.
Corps No. NWP-2007-729-2
Page 7 of 7
NWP-2007-729-2
NWP-2007-729-2
B
1.
B'
2.
3.
XXYYZZ-WFC-VC-1
NOTES:
CONTOURS OBTAINED FROM OTAK, INC. ON
SEPTEMBER 23, 2014.
ELEVATIONS ARE REFERENCED TO MLLW.
CONTOUR INTERVAL IS 1 FOOT.
XXYYZZ-WFC-VC-3
0
50
APRIL 8, 2014
100
(SCALE IN FEET)
SITE PLAN BASED ON AERIAL PHOTOGRAPH
WARRENTON FIBER CO. TANSY POINT FACILITY
WARRENTON, OR
A'
OCTOBER 2014
A
Portland OR 97224
A
FIGURE 2
PROPOSED VIBRACORE SAMPLE LOCATION
Off 503.968.8787 Fax 503.968.3068
A'
SITE PLAN AND CROSS SECTION
XXYYZZ-WFC-VC-1
15575 SW Sequoia Parkway - Suite 100
WFC-1-01
Printed By: aday | Print Date: 10/2/2014 9:33:02 AM
File Name: J:\S-Z\WFC\WFC-1\WFC-1-01\Figures\CAD\WFC-1-01-SP03.dwg | Layout: FIGURE 2
LEGEND:
DMMU
CROSS SECTION
XXYYZZ-WFC-VC-2
C
C'
N
30
25
25
20
20
15
15
10
-5
-5
-10
-10
-15
-15
1+00
POST-DREDGE BOTTOM
-20
2+00
B
B'
30
30
25
25
20
20
15
15
10
10
PROPOSED DREDGE AREA
5
5
PRE-DREDGE BOTTOM
0
0
-5
-10
-10
-15
-15
1+00
POST-DREDGE BOTTOM
-20
2+00
C'
30
30
25
25
20
15
0
15
10
10
5
PRE-DREDGE BOTTOM
-5
0
-5
-10
-10
-15
-15
1+00
POST-DREDGE BOTTOM
-20
2+00
40
(SCALE IN FEET)
5
0
20
HORIZONTAL
0
20
VERTICAL
(SCALE IN FEET)
40
Portland OR 97224
PROPOSED DREDGE AREA
Off 503.968.8787 Fax 503.968.3068
20
-20
0+00
OCTOBER 2014
-5
C
Elevation (feet, MLLW)
0
PRE-DREDGE BOTTOM
CROSS SECTION
0
WARRENTON FIBER CO. TANSY POINT FACILITY
WARRENTON, OR
5
15575 SW Sequoia Parkway - Suite 100
Elevation (feet, MLLW)
10
PROPOSED DREDGE AREA
5
-20
0+00
FIGURE 3
30
-20
0+00
Printed By: aday | Print Date: 10/2/2014 9:33:05 AM
File Name: J:\S-Z\WFC\WFC-1\WFC-1-01\Figures\CAD\WFC-1-01-SP03.dwg | Layout: FIGURE 3
A'
WFC-1-01
Elevation (feet, MLLW)
A