Interested parties are hereby notified that the Walla Walla District has received an application for a Department of the Army permit for certain work in Waters of the United States

Basic information

Fill out these two fields at minimum.

— or —

How Big?

Where?

Links to source documents

Raw text

You can copy from here when filling out the rest of the page.

Interested parties are hereby notified that the Walla Walla District has received an application for a Department of the Army permit for certain work in Waters of the United States, including wetlands. This project is located at the private marina off of West Mountain Road and Thompson Drive at Cascade Reservoir in Valley County, Idaho. The purpose of the proposed project is to remove accumulated sediments from within the footprint of the private marina to facilitate moorage of boats and navigation of watercraft into and out of the facility. Sediment removal would return the marina and access channel to “as-built” conditions.

PUBLIC NOTICE

Interested parties are hereby notified that the Walla Walla District has received an application for a Department of the Army permit for certain work in Waters of the United States, including wetlands, as described below and in the attached drawings:

• Drawings_NWW-2002-2100100_CommonAreaOwnersAssoc.pdf

APPLICANT: Common Area Owners Association, 4400 Meriweather Drive, Boise, Idaho 83705, Mr. Monty Mericle, (208) 859-1465

USACE CONTACT: Mr. Eric M. Gerke; Work: (208) 433-4462; Email: eric.m.gerke@usace.army.mil

PURPOSE: The purpose of the proposed project is to remove accumulated sediments from within the footprint of the private marina to facilitate moorage of boats and navigation of watercraft into and out of the facility. Sediment removal would return the marina and access channel to “as-built” conditions. WATERWAY: Cascade Reservoir (Cascade Lake)

LOCATION: The proposed project would be located at the private marina off of West Mountain Road and Thompson Drive, within Section 20, Township 14 North, Range 3 East, near latitude 44º 5395 N and longitude -116.1170º W, in Valley County, near the community of Cascade, Idaho. (See Drawing 1). Permission from the property association is required to enter onto private property.

DRIVING DIRECTIONS: From the community of Cascade proceed west on Lake Highway to Lakeshore Drive, turn left on Lakeshore Drive proceed south, turn right on West Mountain Road, proceed north on West Mountain Road, approximately 7 miles to Thompson Drive, proceed right, project located on the reservoir.

AUTHORITY: This permit will be issued or denied under the authority of Section 404 of the Clean Water Act (33 U.S.C. 1344). A Department of the Army permit is required for the discharge of dredged or fill material into waters of the United States, including wetlands.

WORK: The proposed project entails the following work:

• Excavate 3,144 cubic yards of accumulated sediments from the established reservoir bottom elevation,an estimated total area of 0.50 acres. • Replace boat dock anchors up to 4 sets (8 anchors total), about 10 cubic yards of concrete.

ADDITIONAL INFORMATION: The shoreline along the private marina has been highly altered from the construction of the facility. A rock wall, concrete boat ramp, riprap jetty, and floating boat docks are a part of the existing shoreline landscape. The private marina can accommodate up to 50 boats.

The project entails dredging an estimated 3,144 cubic yards of accumulated material from 0.50 acres of the bed of the reservoir. Dredged material would be removed to the original design depth of 4813 ft. or a 5 foot average depth from two defined areas within the marina. A bulldozer with a fixed blade would remove accreted sediments in the defined work areas and push dredge material from the defined work areas to the concrete boat ramp along the shoreline. The dredged material will be temporarily stockpiled.

Excavators stationed at the boat ramp would then load the dredged material into dump trucks. The dump trucks would haul the dredged material an estimated 800 linear feet to an upland disposal site location. The disposal site is located on the west side of the existing runway strip in drylands, away from waters of the United States, on the referenced private parcel of land. This disposal site was used to waste dredged material from the bed of the reservoir during the initial construction of the marina in 2002. Boat ramp anchors would be replaced using an excavator and manual labor.

CONSTRUCTION PERIOD: The applicant proposes to start construction September 1, 2016 and end by April 1, 2017. The permit would authorize construction for a period of 3 years.

PROPOSED MITIGATION: The applicant proposes no mitigation since the project involves removal of only accumulated sediment at the bottom of the existing reservoir and no wetlands will be impacted. Work activities would be performed in the dry (low-pool elevation) from the fall thru winter months. Accumulated sediment encompassing the marina has created a natural berm around the work area and will isolate live water from the work areas during low pool elevation.

If water is present after low-pool elevation is reached, mechanical water pumps will be used to empty the remaining water from the work areas into Cascade Reservoir. All water would be removed before sediment removal begins. The natural berm would be removed near work areas to minimize the possibility of sediment entering live water.

OTHER ENVIRONMENTAL DOCUMENTS AND DA PERMITS ISSUED TO APPLICANT: Other permits issued to Common Areas Owners Association associated with this parcel of land include:

• Standard Permit issued on August 7, 2002 to construct a rock jetty, boat ramp and other attendant features associated with the construction of the private marina; • Nationwide Permit 13 (Bank Stabilization) issued on November 1, 2011 to stabilize 500 linear feet of shoreline with riprap and willow cuttings alongside the private airstrip.

WATER QUALITY CERTIFICATION: This notice also serves as a Public Notice that the Idaho Department of Environmental Quality (IDEQ) is evaluating whether to certify that the discharge of dredge and/or fill material proposed for this project will not violate existing water quality standards.

A Department of the Army permit will not be issued until water quality certification has been issued or waived by the IDEQ, as appropriate, as required by Section 401 of the Clean Water Act. If water quality certification is not issued, waived or denied within sixty (60) days of this public notice date, and an extension of this period is not requested by and granted to the IDEQ, certification will be considered waived.

Additionally, within thirty (30) days of this Public Notice, any person may provide written comments to the IDEQ, and request in writing that the IDEQ provide them notice of their preliminary 401 Certification decision. Comments concerning Water Quality Certification for this project should be mailed to:

Idaho Department of Environmental Quality Boise Regional Office 1445 North Orchard Street Boise, Idaho 83706

AQUATIC RESOURCE DESCRIPTION: Cascade Dam, which created Cascade Reservoir as part of the Payette Division of the Boise Project, was authorized by Congress on March 27, 1905 under the provisions of the Reclamation Act of June 17, 1902 (32 Stat. 388). Funds for construction of the dam were appropriated in the Act of June 28, 1941 (55 Stat. 303); construction of the dam was completed in 1948. The reservoir was first filled to capacity in 1957. The dam and reservoir operate under the supervision of the Bureau of Reclamation’s Snake River Area Office in Boise, Idaho. Cascade Reservoir was authorized by Congress primarily for irrigation and Federal hydroelectric power production purposes.

The City of Cascade is near the south end of the reservoir, and the City of Donnelly is near the north end; both cities lie to the east of the reservoir. The Bureau of Reclamation administers a narrow strip of land of irregular width around most of the reservoir. Most of the lands west of the reservoir away from the immediate shoreline are administered by the U.S. Forest Service (USFS), Boise National Forest. The remaining surrounding land is privately owned, except for isolated parcels of State and Federal lands.

When the reservoir is full, there are 26,307 acres of surface water at Lake Cascade and 86 miles of shoreline. The reservoir extends along 21 miles of the North Fork of the Payette River and is 4.5 miles wide at its widest point. The northern end of the reservoir is located near the confluence of the North Fork of the Payette River, the Gold Fork River, Boulder Creek, and Lake Fork Creek. The only island in the reservoir is Sugarloaf Island, which rises 140 feet above the high water line and is approximately 100 acres in size.

The reservoir is an important recreation resource in the region, especially for residents of the Boise metropolitan area. In addition, Lake Cascade is located adjacent to SH 55, a major north-south transportation corridor in western Idaho. Several roads lead from the highway to the reservoir. Lake Cascade is situated at 4,828 feet above mean sea level. The reservoir is shallow, with an average depth of 26.5 feet.

The mean annual drawdown was 16 feet during the first 30 years of operating at full capacity. However, an administrative decision was made in the early 1980s to maintain the reservoir at a 300,000 acre-foot minimum pool, and the mean annual drawdown has been reduced to 12 feet. This has helped to maintain higher water quality and protect the reservoir fishery from the most severe drawdowns and has maintained recreational access later into the summer season and fall. The lowest water levels are typically reached in October, the highest in June or July.

This project is located on private property and the shoreline is not managed by the Bureau of Reclamation.

ANTICIPATED IMPACTS ON AQUATIC ENVIRONMENT: The project would impact an estimated 0.50 acres of open water due to dredging activities. No wetlands would be impacted.

OTHER AUTHORIZATIONS: The proposed project requires a Section 401 Individual Water Quality Certification from the Idaho Department of Environmental Quality.

CULTURAL RESOURCES: Coordination is currently being conducted with the office of the Idaho State Historic Preservation Officer to determine if this activity will affect a site that is listed on the National Register of Historic Places, or a site that may be eligible for listing on the Register. We are also coordinating with the appropriate Tribal entity or the Tribal Historic Preservation Officer for the Nez Perce and Shoshone Bannock Tribes, to determine if there are any tribal historic or cultural interests within the project area. TRIBAL TREATY RIGHTS and INTERESTS: Federal agencies acknowledge the federal trust responsibility arising from treaties, statues, executive orders and the historical relations between the United States and American Indian Tribes. The federal government has a unique trust relationship with federally recognized American Indian Tribes, including the Shoshone-Paiute Tribes, Nez Perce Tribe and Shoshone Bannock Tribe. The Corps has a responsibility and obligation to consider and consult on potential effects to Tribal rights, uses and interests. The Corps further recognizes there may be a need for additional and on-going consultation.

ENDANGERED SPECIES: No listed threatened or endangered species or designated critical habitats are known to exist in the project area. Preliminarily, we have determined the described activity would have no effect on ESA listed species. However, coordination is currently being conducted with the U.S. Fish and Wildlife Service (USFWS) to determine if the activity will have any effect on species designated as endangered or threatened under the Endangered Species Act, or their critical habitat, under the Endangered Species Act of 1973 (87 Stat. 844).

ESSENTIAL FISH HABITAT: The Magnuson-Stevens Fishery Conservation and Management Act, as amended by the Sustainable Fisheries Act of 1996, requires all Federal agencies to consult with the National Marine Fisheries Service on all actions or proposed actions, permitted, funded or undertaken by the agency that may adversely affect Essential Fish Habitat (EFH). No EFH species are known to use the project area. Preliminarily, we have determined the described activity would have no effect on EFH.

ENVIRONMENTAL IMPACT STATEMENT: Preliminary review indicates the proposed activities will not require preparation of an Environmental Impact Statement. Comments provided will be considered in preparation of an Environmental Assessment.

EVALUATION: The decision whether to issue a permit will be based on an evaluation of the probable impact, including cumulative impacts, of the proposed activity on the public interest. This decision will reflect the national concern for both protection and utilization of important resources. The benefit which reasonably may be expected to accrue from the proposal must be balanced against its reasonably foreseeable detriments.

All factors which may be relevant to the proposal will be considered, including the cumulative effects thereof; among those are conservation, economics, aesthetics, general environmental concerns, wetlands, historic properties, fish and wildlife values, flood hazards, floodplain values, land use, navigation, shoreline erosion and accretion, recreation, water supply and conservation, water quality, energy needs, safety, food and fiber production, mineral needs, consideration of property ownership and in general, the needs and welfare of the people.

In addition, our evaluation will include application of the EPA Guidelines (40 CFR 230) as required by Section 404(b)(1) of the Clean Water Act.

CONSIDERATION OF PUBLIC COMMENTS: The Corps of Engineers is soliciting comments from the general public; local, state and federal agencies and officials, Tribal entities and other interested parties in order to consider and evaluate the impacts of this proposed activity. Any comments received will be considered by the Corps of Engineers to determine whether to issue, modify, condition or deny a permit for this proposal.

To make this decision, comments are used to assess impacts on endangered species, historic properties, water quality, general environmental effects and the other public interest factors listed above. Comments are used in the preparation of an Environmental Assessment and/or an Environmental Impact Statement pursuant to the National Environmental Policy Act. Comments are also used to determine the need for a public hearing and to determine the overall public interest of the proposed activity.

PUBLIC HEARING: Any person may request in writing, within the comment period specified in this notice, that a public hearing be held to consider this proposed activity. Requests for a public hearing shall state specific reasons for holding a public hearing. A request may be denied if substantive reasons for holding a hearing are not provided or if there is otherwise no valid interest to be served.

COMMENT & REVIEW PERIOD: Interested parties are invited to provide comments on the proposed activity, which will become a part of the record and will be considered in the final decision. Please mail all comments to:

U.S. Army Corps of Engineers Mr. Eric M. Gerke Boise Regulatory Office 720 Park Boulevard, Suite 245 Boise, Idaho 83712-7757

or, email comments to: eric.m.gerke@usace.army.mil Comments should be received no later than the comment due date of July 30, 2016, as indicated on this notice, to receive consideration.

Kelly J. Urbanek Chief, Regulatory Division

Enclosure: 1. Drawings_NWW-2002-2100100_CommonAreaOwnersAssoc.pdf

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas