MORGANZA TO THE GULF REACH B LEVEE FROM MARMANDE RIDGE TO FALGOUT CANAL NEAR THERIOT

Basic information

Fill out these two fields at minimum.

— or —

How Big?

Where?

Links to source documents

Raw text

You can copy from here when filling out the rest of the page.

MORGANZA TO THE GULF REACH B LEVEE FROM MARMANDE RIDGE TO FALGOUT CANAL NEAR THERIOT, LOUISIANA IN TERREBONNE PARISH

NAME OF APPLICANT: Terrebonne Levee and Conservation District, c/o CB&I, Attn: Ms. Charlotte Liner, 197 Elysian Drive, Houma, Louisiana 70363.

LOCATION OF WORK: Located adjacent to and along an existing approximate 20,700-linear foot levee, proceeding southerly from Marmande Ridge to Falgout Canal, in Sections 24-28, Township 18 South, Range 17 East, and in Sections 54-64, Township 19 South, Range 17 East, within Terrebonne Basin, located near Theriot, Louisiana, in TERREBONNE Parish, as shown on the enclosed drawings (Latitude 29.4711 N Longitude -90.7675 W).

CHARACTER OF WORK: Levee construction of the Morganza to the Gulf Reach B project from Marmande Ridge extending southerly to Falgout Canal. The proposed project will increase the elevation of the existing drainage levee to become part of the Morganza to the Gulf Flood Protection System. Approximately 1,000,000 cubic yards of native material are proposed to be degraded from the existing levee and placed on site as fill during construction activities. Approximately 2,700,000 cubic yards of native fill material is to be hauled in for the proposed levee construction. Approximately 40.0 acres of potentially jurisdictional non-vegetated waterbottoms, and 86.2 acres of potentially jurisdictional wetlands would be directly impacted as a result of project implementation. A jurisdictional determination request is currently pending. The applicant has designed the project to avoid and minimize direct and secondary adverse impacts to the maximum extent practicable and is proposing to utilize the existing levee to the maximum extent practicable. The applicant has proposing to mitigate for project impacts by submitting a permittee responsible mitigation plan (PRMP). If the applicant submits a PRMP to offset project related impacts, an addendum Public Notice will be issued for review.

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas