INSTALLATION OF PIPELINES AND CRUDE STORAGE TANKS FOR THE EXPANSION OF EXISTING HOUMA CRUDE TANK FARM NEAR HOUMA, LOUISIANA IN TERREBONNE PARISH
NAME OF APPLICANT: Shell Pipeline Company, LP, c/o T. Baker Smith, Inc., Attn: Mr. Michael Trahan, Post Office Box 2266, Houma, Louisiana 70361.
LOCATION OF WORK: Located along and south of LA Highway 660 (Coteau Road), in Section 20, Township 17 South, Range 17 East, within Terrebonne Basin, near Houma, Louisiana, in TERREBONNE Parish, as shown on the enclosed drawings (Latitude 29.6182 N Longitude -90.69161 W).
CHARACTER OF WORK: The applicant has requested a Department of the Army authorization to clear, grade, excavate, and deposit fill material to install three (3) 36-inch pipelines and three (3) crude storage tanks to expand the existing Houma Crude Tank Farm. Approximately 5,553 cubic yards of native material would be excavated for pipeline installation and placed as backfill. An existing roadway would be used for access to the proposed site. Approximately 20,093 cubic yards of hauled in fill material and 1,710 cubic yards of hauled in aggregate material are to be placed as fill during project construction. The proposed project proposes to directly impact approximately 7.8 acres of jurisdictional wetlands from tank expansion and staging areas and temporarily impact approximately 1.5 acres of wetlands from pipeline installation. The applicant has designed the project to avoid and minimize direct and secondary adverse impacts to the maximum extent practicable. As compensation for unavoidable wetland impacts, the applicant proposes to use a Corps approved mitigation bank within the watershed of impact.